Changes to 10 U.S.C. § 6277

S. 4784 · National Defense Authorization Act for Fiscal Year 2027 ·

Reported by committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

10 U.S.C. § 6277 Conceptual and construction design

+2 −2Shown
More for 10 U.S.C. § 6277
Read § 6277
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 6277(b) of title 10, United States Code, is amended by striking $5,000,000 each place it appears and inserting $10,000,000 in fiscal year 2026 dollars.

§ 6277(a)–(b)

Start of § 6277 to (a)(3)(A) unchanged ·

(B) for emergency planning, design, and construction activities under section 6278.

(b) Construction Design.—

(1) Within the amounts authorized by a DOE national security authorization, the Secretary may carry out construction design (including architectural and engineering services) in connection with any proposed construction project if the total estimated cost for such design does not exceed $[struck: 5][inserted: 10],000,000[inserted: in fiscal year 2026 dollars].

(2) If the total estimated cost for construction design in connection with any construction project exceeds $[struck: 5][inserted: 10],000,000[inserted: in fiscal year 2026 dollars], funds for that design must be specifically authorized by law.