S. 4795 · Fighting for Reliable Energy and Ending Doubt for Open Markets Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
FREEDOM Act
In committee · step 2 of 5
30 U.S.C. § 28f Fee
8 changes the bill asks for here, 5 carried out
- Carried out:
by striking
the Mining Law of 1872 (30 U.S.C. 28–28e)
each place it appears and insertingsections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)
; - Not carried out:
in the second sentence, by striking Such claim maintenance fee and inserting the following:(B) Fee.— The claim maintenance fee under subparagraph (A); and
The bill puts these words in a provision numbered (B), which can't be the first one in § 28f(a)(1), so we couldn't tell where it goes.
Technical detail
(B) can't be the first provision of /us/usc/t30/s28f/a/1 - Carried out:
in the first sentence, by striking The holder of and inserting the following:(A) In general.— The holder of; and
- Carried out:
by striking
the Mining Law of 1872 (30 U.S.C. 28 to 28e)
and insertingsections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)
; and - Not carried out:
by striking Such claim maintenance fee and inserting the following:(B) Fee.— The claim maintenance fee under subparagraph (A); and
The bill puts these words in a provision numbered (B), which can't be the first one in § 28f(a)(2), so we couldn't tell where it goes.
Technical detail
(B) can't be the first provision of /us/usc/t30/s28f/a/2 - Carried out:
in the first sentence, by striking The holder of and inserting the following:(A) In general.— The holder of; and
- Not carried out:
in the second sentence, by striking The location fee and inserting the following:(2) Fee.— The location fee; and
The bill turns “The location fee” into a provision of its own, but in § 28f(b) the text doesn't begin with those words. The law may have changed since the bill was drafted.
Technical detail
“The location fee” does not open the text of /us/usc/t30/s28f/b - Carried out:
in the first sentence, by striking The claim main tenance fee and inserting the following:(1) In general.— The claim maintenance fee.
§ 28f(a)–(d)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 28f. Fee | § 28f. Fee | |||
| (a) | (a) Claim maintenance fee | (a) Claim maintenance fee | ||
| (a)(1) | (1) Lode mining claims, mill sites, and tunnel sites | (1) Lode mining claims, mill sites, and tunnel sites | ||
| (a)(1)(A) | (A) [inserted: In general.—] | |||
| [inserted: The holder of each unpatented lode mining claim, mill site, or tunnel site, located pursuant to the mining laws of the United States before, on, or after August 10, 1993, shall pay to the Secretary of the Interior, on or before September 1 of each year, to the extent provided in advance in appropriations Acts, a claim maintenance fee of $100 per claim or site, respectively. Such claim maintenance fee shall be in lieu of the assessment work requirement contained in sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.) and the related filing requirements contained in section 1744(a) and (c) of title 43.] | ||||
| (a)(1) | ||||
| (a)(2) | (2) Placer mining claims | (2) Placer mining claims | ||
| (a)(2)(A) | (A) [inserted: In general.—] | |||
| [inserted: The holder of each unpatented placer mining claim located pursuant to the mining laws of the United States before, on, or after August 10, 1993, shall pay to the Secretary of the Interior, on or before September 1 of each year, the claim maintenance fee described in subsection (a)(1), for each 20 acres of the placer claim or portion thereof. Such claim maintenance fee shall be in lieu of the assessment work requirement contained in sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.) 1 and the related filing requirements contained in section 1744(a) and (c) of title 43.] | ||||
| (a)(2) | ||||
| (b) | (b) Time of payment | (b) Time of payment | ||
| (b)(1) | (1) [inserted: In general.—] | |||
| [inserted: The claim maintenance fee under subsection (a) shall be paid for the year in which the location is made, at the time the location notice is recorded with the Bureau of Land Management. The location fee imposed under section 28g of this title shall be payable not later than 90 days after the date of location.] | ||||
| (b) | ||||
| (c) | (c) Oil shale claims subject to claim maintenance fees under Energy Policy Act of 1992 | (c) Oil shale claims subject to claim maintenance fees under Energy Policy Act of 1992 | ||
| This section shall not apply to any oil shale claims for which a fee is required to be paid under section 2511(e)(2) of the Energy Policy Act of 1992 (Public Law 102–486; 106 Stat. 3111; 30 U.S.C. 242). | This section shall not apply to any oil shale claims for which a fee is required to be paid under section 2511(e)(2) of the Energy Policy Act of 1992 (Public Law 102–486; 106 Stat. 3111; 30 U.S.C. 242). | |||
| (d) | (d) Waiver | (d) Waiver | ||
| (d)(1) | (1) | (1) | ||
| The claim maintenance fee required under this section may be waived for a claimant who certifies in writing to the Secretary that on the date the payment was due, the claimant and all related parties— | The claim maintenance fee required under this section may be waived for a claimant who certifies in writing to the Secretary that on the date the payment was due, the claimant and all related parties— | |||
| (d)(1)(A) | (A) | (A) | ||
| held not more than 10 mining claims, mill sites, or tunnel sites, or any combination thereof, on public lands; and | held not more than 10 mining claims, mill sites, or tunnel sites, or any combination thereof, on public lands; and | |||
| (d)(1)(B) | (B) | (B) | ||
| have performed assessment work required under | have performed assessment work required under [inserted: sections] [inserted: 2319] [inserted: through] [inserted: 2344 ]of [inserted: the] [inserted: Revised Statutes ](30 U.S.C. [inserted: 22 et seq.]) 1 to maintain the mining claims held by the claimant and such related parties for the assessment year ending on noon of September 1 of the calendar year in which payment of the claim maintenance fee was due. | |||
| (d)(2) | (2) | (2) | ||
| For purposes of paragraph (1), with respect to any claimant, the term “related party” means— | For purposes of paragraph (1), with respect to any claimant, the term “related party” means— | |||
| (d)(2)(A) | (A) | (A) | ||
| the spouse and dependent children (as defined in section 152 of title 26), of the claimant; and | the spouse and dependent children (as defined in section 152 of title 26), of the claimant; and | |||
Rest of § 28f unchanged
30 U.S.C. § 42 Patents for nonmineral lands: application, survey, notice, acreage limitation, payment
1 change the bill asks for here, 1 carried out
- Carried out:
Section 2337 of the Revised Statutes (30 U.S.C. 42) is amended by adding at the end the following:
(c) Additional mill sites.— (1) Definitions.— In this subsection: (A) Mill site.— The term “mill site” means a location of public land that is reasonably necessary for waste rock or tailings disposal or other operations reasonably incident to mineral development on, or …
§ 42(a)–(c)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 42. Patents for nonmineral lands: application, survey, notice, acreage limitation, payment | § 42. Patents for nonmineral lands: application, survey, notice, acreage limitation, payment | |||
| (a) | (a) Vein or lode and mill site owners eligible | (a) Vein or lode and mill site owners eligible | ||
| Where nonmineral land not contiguous to the vein or lode is used or occupied by the proprietor of such vein or lode for mining or milling purposes, such nonadjacent surface ground may be embraced and included in an application for a patent for such vein or lode, and the same may be patented therewith, subject to the same preliminary requirements as to survey and notice as are applicable to veins or lodes; but no location made on and after May 10, 1872, of such nonadjacent land shall exceed five acres, and payment for the same must be made at the same rate as fixed by sections 21, 22 to 24, 26 to 28, 29, 30, 33 to 48, 50 to 52, 71 to 76 of this title and section 661 of title 43 for the superficies of the lode. The owner of a quartz mill or reduction works, not owning a mine in connection therewith, may also receive a patent for his mill site, as provided in this section. | Where nonmineral land not contiguous to the vein or lode is used or occupied by the proprietor of such vein or lode for mining or milling purposes, such nonadjacent surface ground may be embraced and included in an application for a patent for such vein or lode, and the same may be patented therewith, subject to the same preliminary requirements as to survey and notice as are applicable to veins or lodes; but no location made on and after May 10, 1872, of such nonadjacent land shall exceed five acres, and payment for the same must be made at the same rate as fixed by sections 21, 22 to 24, 26 to 28, 29, 30, 33 to 48, 50 to 52, 71 to 76 of this title and section 661 of title 43 for the superficies of the lode. The owner of a quartz mill or reduction works, not owning a mine in connection therewith, may also receive a patent for his mill site, as provided in this section. | |||
| (b) | (b) Placer claim owners eligible | (b) Placer claim owners eligible | ||
| Where nonmineral land is needed by the proprietor of a placer claim for mining, milling, processing, beneficiation, or other operations in connection with such claim, and is used or occupied by the proprietor for such purposes, such land may be included in an application for a patent for such claim, and may be patented therewith subject to the same requirements as to survey and notice as are applicable to placers. No location made of such nonmineral land shall exceed five acres and payment for the same shall be made at the rate applicable to placer claims which do not include a vein or lode. | Where nonmineral land is needed by the proprietor of a placer claim for mining, milling, processing, beneficiation, or other operations in connection with such claim, and is used or occupied by the proprietor for such purposes, such land may be included in an application for a patent for such claim, and may be patented therewith subject to the same requirements as to survey and notice as are applicable to placers. No location made of such nonmineral land shall exceed five acres and payment for the same shall be made at the rate applicable to placer claims which do not include a vein or lode. | |||
| (c) | (c) [inserted: Additional mill sites.—] | |||
| (c)(1) | (1) [inserted: Definitions.—] | |||
| [inserted: In this subsection:] | ||||
| (c)(1)(A) | (A) [inserted: Mill site.—] | |||
| [inserted: The term “mill site” means a location of public land that is reasonably necessary for waste rock or tailings disposal or other operations reasonably incident to mineral development on, or production from, land included in a plan of operations.] | ||||
| (c)(1)(B) | (B) [inserted: Operations; operator.—] | |||
| [inserted: The terms “operations” and “operator” have the meanings given those terms in section 3809.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection).] | ||||
| (c)(1)(C) | (C) [inserted: Plan of operations.—] | |||
| [inserted: The term “plan of operations” means a plan of operations that an operator is required to submit, and the Secretary of the Interior or the Secretary of Agriculture, as applicable, is required to approve, before the operator may begin operations, in accordance with, as applicable—] | ||||
| (c)(1)(C)(i) | (i) [inserted: ] | |||
| [inserted: subpart 3809 of title 43, Code of Federal Regulations (or successor regulations establishing application and approval requirements); and] | ||||
| (c)(1)(C)(ii) | (ii) [inserted: ] | |||
| [inserted: part 228 of title 36, Code of Federal Regulations (or successor regulations establishing application and approval requirements).] | ||||
| (c)(1)(D) | (D) [inserted: Public land.—] | |||
| [inserted: The term “public land” means land owned by the United States that is open to location under sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.), including—] | ||||
| (c)(1)(D)(i) | (i) [inserted: ] | |||
| [inserted: land that is mineral-in-character (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection));] | ||||
| (c)(1)(D)(ii) | (ii) [inserted: ] | |||
| [inserted: nonmineral land (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection)); and] | ||||
| (c)(1)(D)(iii) | (iii) [inserted: ] | |||
| [inserted: land the mineral character of which has not been determined.] | ||||
| (c)(2) | (2) [inserted: Authorization.—] | |||
| [inserted: Notwithstanding subsections (a) and (b), if public land is needed by the proprietor of a lode or placer claim for operations in connection with any lode or placer claim within the proposed plan of operations, the proprietor may—] | ||||
| (c)(2)(A) | (A) [inserted: ] | |||
| [inserted: locate and include within the plan of operations as many mill site claims under this subsection as are reasonably necessary for its operations; and] | ||||
| (c)(2)(B) | (B) [inserted: ] | |||
| [inserted: use or occupy public land in accordance with an approved plan of operations.] | ||||
| (c)(3) | (3) [inserted: Mill sites convey no mineral rights.—] | |||
| [inserted: A mill site under this subsection does not convey mineral rights to the locator.] | ||||
| (c)(4) | (4) [inserted: Size of mill sites.—] | |||
| [inserted: A location of a single mill site under this subsection shall not exceed 5 acres.] | ||||
| (c)(5) | (5) [inserted: Mill site and lode or placer claims on same tracts of public land.—] | |||
| [inserted: A mill site may be located under this subsection on a tract of public land on which the claimant or operator maintains a previously located lode or placer claim.] | ||||
| (c)(6) | (6) [inserted: Effect on mining claims.—] | |||
| [inserted: The location of a mill site under this subsection shall not affect the validity of any lode or placer claim, or any rights associated with such a claim.] | ||||
| (c)(7) | (7) [inserted: Patenting.—] | |||
| [inserted: A mill site under this section shall not be eligible for patenting.] | ||||
| (c)(8) | (8) [inserted: Savings provisions.—] | |||
| [inserted: Nothing in this subsection—] | ||||
| (c)(8)(A) | (A) [inserted: ] | |||
| [inserted: diminishes any right (including a right of entry, use, or occupancy) of a claimant;] | ||||
| (c)(8)(B) | (B) [inserted: ] | |||
| [inserted: creates or increases any right (including a right of exploration, entry, use, or occupancy) of a claimant on land that is not open to location under the general mining laws;] | ||||
| (c)(8)(C) | (C) [inserted: ] | |||
| [inserted: modifies any provision of law or any prior administrative action withdrawing land from location or entry;] | ||||
| (c)(8)(D) | (D) [inserted: ] | |||
| [inserted: limits the right of the Federal Government to regulate mining and mining-related activities (including requiring claim validity examinations to establish the discovery of a valuable mineral deposit) in areas withdrawn from mining, including under—] | ||||
| (c)(8)(D)(i) | (i) [inserted: ] | |||
| [inserted: the general mining laws;] | ||||
| (c)(8)(D)(ii) | (ii) [inserted: ] | |||
| [inserted: the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.);] | ||||
| (c)(8)(D)(iii) | (iii) [inserted: ] | |||
| [inserted: the Wilderness Act (16 U.S.C. 1131 et seq.);] | ||||
| (c)(8)(D)(iv) | (iv) [inserted: ] | |||
| [inserted: sections 100731 through 100737 of title 54, United States Code;] | ||||
| (c)(8)(D)(v) | (v) [inserted: ] | |||
| [inserted: the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.);] | ||||
| (c)(8)(D)(vi) | (vi) [inserted: ] | |||
| [inserted: division A of subtitle III of title 54, United States Code (commonly referred to as the ‘National Historic Preservation Act’); or] | ||||
| (c)(8)(D)(vii) | (vii) [inserted: ] | |||
| [inserted: section 4 of the Act of July 23, 1955 (commonly known as the “Surface Resources Act of 1955”) (69 Stat. 368, chapter 375; 30 U.S.C. 612);] | ||||
| (c)(8)(E) | (E) [inserted: ] | |||
| [inserted: restores any right (including a right of entry, use, or occupancy, or right to conduct operations) of a claimant that—] | ||||
| (c)(8)(E)(i) | (i) [inserted: ] | |||
| [inserted: existed prior to the date on which the land was closed to, or withdrawn from, location under the general mining laws; and] | ||||
| (c)(8)(E)(ii) | (ii) [inserted: ] | |||
| [inserted: has been extinguished by such closure or withdrawal; or] | ||||
| (c)(8)(F) | (F) [inserted: ] | |||
| [inserted: modifies section 404 of division E of the Consolidated Appropriations Act, 2024 (Public Law 118–42; 138 Stat. 284).] | ||||
30 U.S.C. § 1001 Definitions
13 changes the bill asks for here, 9 carried out
- Not carried out:
by striking the section designation and heading and all that follows through the term— in the matter preceding subsection (a) and inserting the following:
2. Definitions In this Act:;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the section designation and heading and all that follows through QTEXT in the matter preceding subsection (X) and inserting the following: QCONTENT; - Carried out:
in each of subsections (a) through (d), by striking the semicolon at the end and inserting a period
;
- Carried out:
in subsection (c), by striking
resources
and insertingresource
; - Carried out:
by striking subsection (e);
- Carried out:
in paragraph (1), by striking
Section
and insertingsection
; - Carried out:
by redesignating paragraphs (1) through (4) as subparagraphs (A) through (D), respectively, and indenting appropriately; and
- Not carried out:
by striking the subsection designation and all that follows through limited to, in the matter preceding subparagraph (A) (as so redesignated) and inserting the following:
(f) “significant thermal feature within a unit of the National Park System” includes;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the subsection designation and all that follows through QTEXT in the matter preceding subparagraph (X) (as so redesignated) and inserting the following: QCONTENT; - Carried out:
in subsection (g), by striking
; and
at the end and inserting a period; - Carried out:
by redesignating subsections (a), (b), (c), (d), (f), and (g) as paragraphs (7), (4), (5), (1), (8), and (2), respectively, indenting the paragraphs appropriately, and moving the paragraphs so as to appear in numerical order;
- Not carried out:
by inserting
The term
after the paragraph designation; andWe can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: inserting QTEXT after the paragraph designation; and - Not carried out:
by adding a paragraph heading, the text of which comprises the term defined in the paragraph;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: adding a paragraph heading, the text of which comprises the term defined in the paragraph; - Carried out:
by inserting after paragraph (2) (as so redesignated) the following:
(3) Geothermal electric generating facility.— (A) In general.— The term “geothermal electric generating facility” means a facility, including all necessary equipment and structures (including turbines and cooling equipment), that produces electricity using geothermal resources. …
- Carried out:
by inserting after paragraph (5) (as so redesignated) the following:
(6) In-service date.— The term “in-service date”, with respect to a geothermal electric generating facility, means the date on which the geothermal electric generating facility commences operation..
§ 1001(7)–(3)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 1001. Definitions | § 1001. Definitions | |||
| As used in this chapter, the term— | As used in this chapter, the term— | |||
| (7) | [inserted: (7)] | |||
| “Secretary” means the Secretary of the Interior | “Secretary” means the Secretary of the Interior[inserted: .] | |||
| (4) | [inserted: (4)] | |||
| “geothermal lease” means a lease issued under authority of this chapter | “geothermal lease” means a lease issued under authority of this chapter[inserted: .] | |||
| (5) | [inserted: (5)] | |||
| “geothermal | “geothermal [inserted: resource]” means (i) all products of geothermal processes, embracing indigenous steam, hot water and hot brines; (ii) steam and other gases, hot water and hot brines resulting from water, gas, or other fluids artificially introduced into geothermal formations; (iii) heat or other associated energy found in geothermal formations; and (iv) any byproduct derived from them[inserted: .] | |||
| (6) | (6) [inserted: In-service date.—] | |||
| [inserted: The term “in-service date”, with respect to a geothermal electric generating facility, means the date on which the geothermal electric generating facility commences operation.] | ||||
| (1) | [inserted: (1)] | |||
| “byproduct” means any mineral or minerals (exclusive of oil, hydrocarbon gas, and helium) which are found in solution or in association with geothermal steam and which have a value of less than 75 per centum of the value of the geothermal steam or are not, because of quantity, quality, or technical difficulties in extraction and production, of sufficient value to warrant extraction and production by themselves | “byproduct” means any mineral or minerals (exclusive of oil, hydrocarbon gas, and helium) which are found in solution or in association with geothermal steam and which have a value of less than 75 per centum of the value of the geothermal steam or are not, because of quantity, quality, or technical difficulties in extraction and production, of sufficient value to warrant extraction and production by themselves[inserted: .] | |||
| (e) | (e) | |||
| (8) | [inserted: (8)] | |||
| “Significant1 thermal features within units of the National Park System” shall include, but not be limited to, the following: | “Significant1 thermal features within units of the National Park System” shall include, but not be limited to, the following: | |||
| (8)(A) | [inserted: (A)] | |||
| Thermal features within units of the National Park System listed in | Thermal features within units of the National Park System listed in [inserted: section] 1 1026(a)(1) of this title and designated as significant in the Federal Register notice of August 3, 1987 (Vol. 52, No. 148 Fed. Reg. 28790). | |||
| (8)(B) | [inserted: (B)] | |||
| Crater Lake National Park. | Crater Lake National Park. | |||
| (8)(C) | [inserted: (C)] | |||
| Thermal features within Big Bend National Park and Lake Mead National Recreation Area proposed as significant in the Federal Register notice of February 13, 1987 (Vol. 52, No. 30 Fed. Reg. 4700). | Thermal features within Big Bend National Park and Lake Mead National Recreation Area proposed as significant in the Federal Register notice of February 13, 1987 (Vol. 52, No. 30 Fed. Reg. 4700). | |||
| (8)(D) | [inserted: (D)] | |||
| Thermal features within units of the National Park System added to the significant thermal features list pursuant to section 1026(a)(2) of this title. | Thermal features within units of the National Park System added to the significant thermal features list pursuant to section 1026(a)(2) of this title. | |||
| (2) | [inserted: (2)] | |||
| “direct use” means utilization of geothermal resources for commercial, residential, agricultural, public facilities, or other energy needs other than the commercial production of electricity | “direct use” means utilization of geothermal resources for commercial, residential, agricultural, public facilities, or other energy needs other than the commercial production of electricity[inserted: .] | |||
| (3) | (3) [inserted: Geothermal electric generating facility.—] | |||
| (3)(A) | (A) [inserted: In general.—] | |||
| [inserted: The term “geothermal electric generating facility” means a facility, including all necessary equipment and structures (including turbines and cooling equipment), that produces electricity using geothermal resources.] | ||||
| (3)(B) | (B) [inserted: Treatment.—] | |||
| [inserted: For purposes of section 5(a)(1), a facility described in subparagraph (A) shall be considered to be a separate facility from any other such facility unless the facility shares a turbine with the other facility.] | ||||
30 U.S.C. § 1003 Leasing procedures
1 change the bill asks for here, 1 carried out
- Carried out:
Section 4 of the Geothermal Steam Act of 1970 (30 U.S.C. 1003) is amended by adding at the end the following:
(h) Effect of pending civil actions on processing applications relating to geothermal leasing.— (1) Definition of authorization.— In this subsection, the term “authorization” means any license, permit, approval, finding, determination, or other administrative decision issued by …
§ 1003(g)–(h)
Start of § 1003 to (g) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (g)(1) | (1) In general | (1) In general | ||
| Subject to paragraph (2), a geothermal lease for the direct use of geothermal resources shall cover not more than the quantity of acreage determined by the Secretary to be reasonably necessary for the proposed use. | Subject to paragraph (2), a geothermal lease for the direct use of geothermal resources shall cover not more than the quantity of acreage determined by the Secretary to be reasonably necessary for the proposed use. | |||
| (g)(2) | (2) Limitations | (2) Limitations | ||
| The quantity of acreage covered by the lease shall not exceed the limitations established under section 1006 of this title. | The quantity of acreage covered by the lease shall not exceed the limitations established under section 1006 of this title. | |||
| (h) | (h) [inserted: Effect of pending civil actions on processing applications relating to geothermal leasing.—] | |||
| (h)(1) | (1) [inserted: Definition of authorization.—] | |||
| [inserted: In this subsection, the term “authorization” means any license, permit, approval, finding, determination, or other administrative decision issued by a Federal agency, or any interagency consultation, that is required or authorized under Federal law (including regulations) in order to site, construct, reconstruct, or commence operation of a geothermal project administered by a Federal agency.] | ||||
| (h)(2) | (2) [inserted: Requirement to process applications.—] | |||
| [inserted: Notwithstanding any pending civil action that affects an application for a geothermal drilling permit, sundry notice, notice to proceed, right-of-way, or any other authorization under a valid existing geothermal lease, the Secretary shall, unless a Federal court vacates or provides injunctive relief for the applicable geothermal lease, geothermal drilling permit, sundry notice, notice to proceed, right-of-way, or other authorization, approve and issue, or deny, each such application not later than 60 days after completing all requirements under applicable Federal laws (including regulations), including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.), and division A of subtitle III of title 54, United States Code.] | ||||
| (h)(3) | (3) [inserted: No new authority for Federal courts.—] | |||
| [inserted: Nothing in this subsection modifies any existing authority of a Federal court to vacate or provide injunctive relief for a geothermal lease, geothermal drilling permit, sundry notice, notice to proceed, right-of-way, or other authorization.] | ||||
30 U.S.C. § 1004 Rents and royalties
1 change the bill asks for here, 1 carried out
- Carried out:
Section 5(a) of the Geothermal Steam Act of 1970 (30 U.S.C. 1004(a)) is amended by striking paragraph (1) and inserting the following:
(1) a royalty on electricity produced using geothermal resources, other than direct use of geothermal resources, in an amount equal to, with respect to a geothermal electric generating facility producing electricity from geothermal resources— (A) not less than 1 percent, and not …
§ 1004(a)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 1004. Rents and royalties | § 1004. Rents and royalties | |||
| (a) | (a) In general | (a) In general | ||
| Geothermal leases shall provide for— | Geothermal leases shall provide for— | |||
| (a)(1) | (1) | (1) | ||
| a royalty on electricity produced using geothermal resources, other than direct use of geothermal resources, | a royalty on electricity produced using geothermal resources, other than direct use of geothermal resources, [inserted: in] [inserted: an] [inserted: amount equal to, with respect to a geothermal electric generating facility producing electricity from geothermal resources]— | |||
| (a)(1)(A) | (A) | (A) | ||
| not less than 1 percent and not more than 2.5 percent of the gross proceeds from the sale of electricity produced from | not less than 1 percent[inserted: ,] and not more than 2.5 percent[inserted: ,] of the gross proceeds from the sale of electricity produced [inserted: by the geothermal electric generating facility ]from [inserted: those] [inserted: geothermal ]resources during [inserted: each] [inserted: year] [inserted: of the ]10[inserted: -year] [inserted: period] [inserted: beginning] [inserted: on] [inserted: the] [inserted: in-service date of ]the [inserted: geothermal electric generating facility]; and | |||
| (a)(1)(B) | (B) | (B) | ||
| not less than 2 and not more than 5 percent of the gross proceeds from the sale of electricity produced from | not less than 2 [inserted: percent, ]and not more than 5 percent[inserted: ,] of the gross proceeds from the sale of electricity produced [inserted: by the geothermal electric generating facility ]from [inserted: those] [inserted: geothermal ]resources during each year after [inserted: the] 10-year period[inserted: described in subparagraph (A)]; | |||
| (a)(2) | (2) | (2) | ||
| a royalty on any byproduct that is a mineral specified in the first section of the Mineral Leasing Act (30 U.S.C. 181), and that is derived from production under the lease, at the rate of the royalty that applies under that Act [30 U.S.C. 181 et seq.] to production of the mineral under a lease under that Act; and | a royalty on any byproduct that is a mineral specified in the first section of the Mineral Leasing Act (30 U.S.C. 181), and that is derived from production under the lease, at the rate of the royalty that applies under that Act [30 U.S.C. 181 et seq.] to production of the mineral under a lease under that Act; and | |||
| (a)(3) | (3) | (3) | ||
| payment in advance of an annual rental of not less than— | payment in advance of an annual rental of not less than— |
Rest of § 1004 unchanged
30 U.S.C. § 1005 Lease term and work commitment requirements
2 changes the bill asks for here, 1 carried out
- Carried out:
Section 6 of the Geothermal Steam Act of 1970 (30 U.S.C. 1005) is amended by adding at the end the following:
(j) Cost recovery.— (1) In general.— During the period beginning on the date of enactment of the FREEDOM Act and ending on September 30, 2033, the Secretary may require an applicant for, or holder of, a geothermal lease to reimburse the United States for all reasonable …
- Not carried out:
Section 6(i) of the Geothermal Steam Act of 1970 (30 U.S.C. 1005(i)) is amended by striking
as defined in section 2(c) herein
.“as defined in section 2(c) herein” isn't in § 1005(i) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“as defined in section 2(c) herein” not found in /us/usc/t30/s1005/i
§ 1005(h)–(j)
Start of § 1005 to (g) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (h) | (h) “Produced or utilized in commercial quantities” defined | (h) “Produced or utilized in commercial quantities” defined | ||
| Except as otherwise provided for in this section, for purposes of this section the term “produced or utilized in commercial quantities” means the completion of a well producing geothermal steam in commercial quantities. Such term shall also include the completion of a well capable of producing geothermal steam in commercial quantities so long as the Secretary determines that diligent efforts are being made toward the utilization of the geothermal steam. | Except as otherwise provided for in this section, for purposes of this section the term “produced or utilized in commercial quantities” means the completion of a well producing geothermal steam in commercial quantities. Such term shall also include the completion of a well capable of producing geothermal steam in commercial quantities so long as the Secretary determines that diligent efforts are being made toward the utilization of the geothermal steam. | |||
| (i) | (i) Principles for location of minerals under mining laws when minerals are not associated with geothermal resources | (i) Principles for location of minerals under mining laws when minerals are not associated with geothermal resources | ||
| Minerals locatable under the mining laws of the United States in lands subject to a geothermal lease issued under the provisions of this chapter which are not associated with the geothermal resources of such lands as defined in section 1001(c) of this title shall be locatable under said mining laws in accordance with the principles of the Multiple Mineral Development Act (68 Stat. 708; found in 30 U.S.C. 521 et seq.). | Minerals locatable under the mining laws of the United States in lands subject to a geothermal lease issued under the provisions of this chapter which are not associated with the geothermal resources of such lands as defined in section 1001(c) of this title shall be locatable under said mining laws in accordance with the principles of the Multiple Mineral Development Act (68 Stat. 708; found in 30 U.S.C. 521 et seq.). | |||
| (j) | (j) [inserted: Cost recovery.—] | |||
| (j)(1) | (1) [inserted: In general.—] | |||
| [inserted: During the period beginning on the date of enactment of the FREEDOM Act and ending on September 30, 2033, the Secretary may require an applicant for, or holder of, a geothermal lease to reimburse the United States for all reasonable administrative and other costs incurred by the United States from—] | ||||
| (j)(1)(A) | (A) [inserted: ] | |||
| [inserted: processing the application for the geothermal lease, including any application for an operations plan, geothermal drilling permit, utilization plan, site license, facility construction permit, commercial use permit, and any other approval associated with a geothermal lease; and] | ||||
| (j)(1)(B) | (B) [inserted: ] | |||
| [inserted: inspecting and monitoring—] | ||||
| (j)(1)(B)(i) | (i) [inserted: ] | |||
| [inserted: geophysical exploration activities;] | ||||
| (j)(1)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: the drilling, plugging, or abandonment of wells; and] | ||||
| (j)(1)(B)(iii) | (iii) [inserted: ] | |||
| [inserted: the construction, operation, termination, or reclamation of any well site or facility for the utilization of geothermal resources pursuant to the geothermal lease.] | ||||
| (j)(2) | (2) [inserted: Factor for consideration.—] | |||
| [inserted: In determining whether to require reimbursement under paragraph (1), the Secretary shall take into consideration whether there is in effect a cooperative cost-share agreement between the United States and the holder of a geothermal lease.] | ||||
| (j)(3) | (3) [inserted: Adjustments.—] | |||
| [inserted: The Secretary may reduce the amount required to be reimbursed under paragraph (1) if the Secretary determines that—] | ||||
| (j)(3)(A) | (A) [inserted: ] | |||
| [inserted: full reimbursement would impose on the applicant an economic hardship; or] | ||||
| (j)(3)(B) | (B) [inserted: ] | |||
| [inserted: a less-than-full reimbursement is necessary to promote the greatest use of geothermal resources.] | ||||
| (j)(4) | (4) [inserted: Use.—] | |||
| [inserted: The amounts reimbursed under this subsection shall be—] | ||||
| (j)(4)(A) | (A) [inserted: ] | |||
| [inserted: credited to the currently applicable appropriation, account, or fund of the Department of the Interior as discretionary offsetting collections; and] | ||||
| (j)(4)(B) | (B) [inserted: ] | |||
| [inserted: available only to the extent provided in advance in appropriations Acts for—] | ||||
| (j)(4)(B)(i) | (i) [inserted: ] | |||
| [inserted: processing applications for geothermal leases, including any applications for operations plans, geothermal drilling permits, utilization plans, site licenses, facility construction permits, commercial use permits, and any other approval associated with geothermal leases; and] | ||||
| (j)(4)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: inspecting and monitoring—] | ||||
| (j)(4)(B)(ii)(I) | (I) [inserted: ] | |||
| [inserted: geophysical exploration activities;] | ||||
| (j)(4)(B)(ii)(II) | (II) [inserted: ] | |||
| [inserted: the drilling, plugging, or abandonment of wells; and] | ||||
| (j)(4)(B)(ii)(III) | (III) [inserted: ] | |||
| [inserted: the construction, operation, termination, or reclamation of any well site or facility for the utilization of geothermal resources pursuant to geothermal leases.] | ||||
30 U.S.C. § 1026 Significant thermal features
1 change the bill asks for here, 1 carried out
- Carried out:
Section 28(a)(1) of the Geothermal Steam Act of 1970 (30 U.S.C. 1026(a)(1)) is amended, in the matter preceding subparagraph (A), by striking
, as defined in section 2(f),
.
§ 1026(a)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 1026. Significant thermal features | § 1026. Significant thermal features | |||
| (a) | (a) Units of National Park System | (a) Units of National Park System | ||
| (a)(1) | (1) | (1) | ||
| The Secretary shall maintain a list of significant thermal features | The Secretary shall maintain a list of significant thermal features within units of the National Park System, including but not limited to the following units: | |||
| (a)(1)(A) | (A) | (A) | ||
| Mount Rainier National Park. | Mount Rainier National Park. | |||
| (a)(1)(B) | (B) | (B) | ||
| Crater Lake National Park. | Crater Lake National Park. |
Rest of § 1026 unchanged
42 U.S.C. § 15942 NEPA review
5 changes the bill asks for here, 5 carried out
- Carried out:
by striking
(NEPA)
and inserting(42 U.S.C. 4321 et seq.) (referred to in this section as NEPA)
; - Carried out:
by inserting
(30 U.S.C. 181 et seq.)
afterMineral Leasing Act
; and - Carried out:
by inserting
or the Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) for the purpose of exploration or development of geothermal resources
before the period at the end; and - Carried out:
in paragraph (2), by striking
oil or gas
and insertingoil, gas, or geothermal resources
; and - Carried out:
in paragraph (3), by striking
oil or gas
and insertingoil, gas, or geothermal resources
.
§ 15942(a)–(b)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 15942. NEPA review | § 15942. NEPA review | |||
| (a) | (a) NEPA review | (a) NEPA review | ||
| Action by the Secretary of the Interior in managing the public lands, or the Secretary of Agriculture in managing National Forest System Lands, with respect to any of the activities described in subsection (b) shall be subject to a rebuttable presumption that the use of a categorical exclusion under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] (NEPA) would apply if the activity is conducted pursuant to the Mineral Leasing Act [30 U.S.C. 181 et seq.] for the purpose of exploration or development of oil or gas. | Action by the Secretary of the Interior in managing the public lands, or the Secretary of Agriculture in managing National Forest System Lands, with respect to any of the activities described in subsection (b) shall be subject to a rebuttable presumption that the use of a categorical exclusion under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] ([inserted: 42 U.S.C. 4321 et seq.) (referred to in this section as ]NEPA) would apply if the activity is conducted pursuant to the Mineral Leasing Act [inserted: (30 U.S.C. 181 et seq.) ][30 U.S.C. 181 et seq.] for the purpose of exploration or development of oil or gas[inserted: or the Geothermal Steam Act of 1970 (30 U].[inserted: S.C. 1001 et seq.) for the purpose of exploration or development of geothermal resources.] | |||
| (b) | (b) Activities described | (b) Activities described | ||
| The activities referred to in subsection (a) are the following: | The activities referred to in subsection (a) are the following: | |||
| (b)(1) | (1) | (1) | ||
| Individual surface disturbances of less than 5 acres so long as the total surface disturbance on the lease is not greater than 150 acres and site-specific analysis in a document prepared pursuant to NEPA has been previously completed. | Individual surface disturbances of less than 5 acres so long as the total surface disturbance on the lease is not greater than 150 acres and site-specific analysis in a document prepared pursuant to NEPA has been previously completed. | |||
| (b)(2) | (2) | (2) | ||
| Drilling an oil or | Drilling an oil[inserted: ,] [inserted: gas, ]or [inserted: geothermal] [inserted: resources ]well at a location or well pad site at which drilling has occurred previously within 5 years prior to the date of spudding the well. | |||
| (b)(3) | (3) | (3) | ||
| Drilling an oil or | Drilling an oil[inserted: ,] [inserted: gas, ]or [inserted: geothermal] [inserted: resources ]well within a developed field for which an approved land use plan or any environmental document prepared pursuant to NEPA analyzed such drilling as a reasonably foreseeable activity, so long as such plan or document was approved within 5 years prior to the date of spudding the well. | |||
| (b)(4) | (4) | (4) | ||
| Placement of a pipeline in an approved right-of-way corridor, so long as the corridor was approved within 5 years prior to the date of placement of the pipeline. | Placement of a pipeline in an approved right-of-way corridor, so long as the corridor was approved within 5 years prior to the date of placement of the pipeline. | |||
| (b)(5) | (5) | (5) | ||
| Maintenance of a minor activity, other than any construction or major renovation or a building or facility. | Maintenance of a minor activity, other than any construction or major renovation or a building or facility. |