Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

33 U.S.C. § 1341 Certification

+112 −43 of 5 shown
More for 33 U.S.C. § 1341
Read § 1341
5 changes the bill asks for here, 3 carried out
  1. Not carried out:

    by striking (a)(1) Any applicant and all that follows through No license in the sixth sentence of paragraph (1) and inserting the following:(a) Compliance with applicable requirements.— (1) Certification required.— (A) In general.— Any applicant for a Federal license or permit to conduct any activity, including the construction or operation of facilities, which may result in a discharge directly into the navigable …

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: striking QTEXT and all that follows through QTEXT in the sixth sentence of paragraph (X) and inserting the following: QCONTENT; and
  2. Carried out:

    in paragraph (4), in the first sentence, by striking any discharge into the navigable waters and inserting a discharge directly into the navigable waters;

  3. Not carried out:

    in subsection (b), by striking (b) Nothing and inserting the following:(b) Compliance with other provisions of law setting applicable water quality requirements.— Except as provided in subsection (e), nothing;

    The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.

    Technical detailthe provision inserted says more than a heading and the words struck
  4. Carried out:

    in subsection (c), by striking (c) In order and inserting the following:(c) Authority of Secretary of the Army To permit spoil disposal areas by Federal licensees or permittees.— In order; and

  5. Carried out:

    by striking subsection (d) and inserting the following:(d) Certification request requirements.— (1) Written request required.— A request for certification under subsection (a) shall be made in writing to the State, interstate water pollution control agency, or Administrator, as applicable. (2) Requirements for complete request.— A …

§ 1341(a)–(d)

Start of § 1341 to (a)(2) unchanged ·

(3) The certification obtained pursuant to paragraph (1) of this subsection with respect to the construction of any facility shall fulfill the requirements of this subsection with respect to certification in connection with any other Federal license or permit required for the operation of such facility unless, after notice to the certifying State, agency, or Administrator, as the case may be, which shall be given by the Federal agency to whom application is made for such operating license or permit, the State, or if appropriate, the interstate agency or the Administrator, notifies such agency within sixty days after receipt of such notice that there is no longer reasonable assurance that there will be compliance with the applicable provisions of sections 1311, 1312, 1313, 1316, and 1317 of this title because of changes since the construction license or permit certification was issued in (A) the construction or operation of the facility, (B) the characteristics of the waters into which such discharge is made, (C) the water quality criteria applicable to such waters or (D) applicable effluent limitations or other requirements. This paragraph shall be inapplicable in any case where the applicant for such operating license or permit has failed to provide the certifying State, or, if appropriate, the interstate agency or the Administrator, with notice of any proposed changes in the construction or operation of the facility with respect to which a construction license or permit has been granted, which changes may result in violation of section 1311, 1312, 1313, 1316, or 1317 of this title.

(4) Prior to the initial operation of any federally licensed or permitted facility or activity which may result in [struck: any][inserted: a] discharge [inserted: directly ]into the navigable waters and with respect to which a certification has been obtained pursuant to paragraph (1) of this subsection, which facility or activity is not subject to a Federal operating license or permit, the licensee or permittee shall provide an opportunity for such certifying State, or, if appropriate, the interstate agency or the Administrator to review the manner in which the facility or activity shall be operated or conducted for the purposes of assuring that applicable effluent limitations or other limitations or other applicable water quality requirements will not be violated. Upon notification by the certifying State, or if appropriate, the interstate agency or the Administrator that the operation of any such federally licensed or permitted facility or activity will violate applicable effluent limitations or other limitations or other water quality requirements such Federal agency may, after public hearing, suspend such license or permit. If such license or permit is suspended, it shall remain suspended until notification is received from the certifying State, agency, or Administrator, as the case may be, that there is reasonable assurance that such facility or activity will not violate the applicable provisions of section 1311, 1312, 1313, 1316, or 1317 of this title.

(5) Any Federal license or permit with respect to which a certification has been obtained under paragraph (1) of this subsection may be suspended or revoked by the Federal agency issuing such license or permit upon the entering of a judgment under this chapter that such facility or activity has been operated in violation of the applicable provisions of section 1311, 1312, 1313, 1316, or 1317 of this title.

(6) Except with respect to a permit issued under section 1342 of this title, in any case where actual construction of a facility has been lawfully commenced prior to April 3, 1970, no certification shall be required under this subsection for a license or permit issued after April 3, 1970, to operate such facility, except that any such license or permit issued without certification shall terminate April 3, 1973, unless prior to such termination date the person having such license or permit submits to the Federal agency which issued such license or permit a certification and otherwise meets the requirements of this section.

(b) Compliance with other provisions of law setting applicable water quality requirements Nothing in this section shall be construed to limit the authority of any department or agency pursuant to any other provision of law to require compliance with any applicable water quality requirements. The Administrator shall, upon the request of any Federal department or agency, or State or interstate agency, or applicant, provide, for the purpose of this section, any relevant information on applicable effluent limitations, or other limitations, standards, regulations, or requirements, or water quality criteria, and shall, when requested by any such department or agency or State or interstate agency, or applicant, comment on any methods to comply with such limitations, standards, regulations, requirements, or criteria.

(c) Authority of Secretary of the Army [struck: to][inserted: To] permit [struck: use of ]spoil disposal areas by Federal licensees or permittees[inserted: .—] In order to implement the provisions of this section, the Secretary of the Army, acting through the Chief of Engineers, is authorized, if he deems it to be in the public interest, to permit the use of spoil disposal areas under his jurisdiction by Federal licensees or permittees, and to make an appropriate charge for such use. Moneys received from such licensees or permittees shall be deposited in the Treasury as miscellaneous receipts.

(d) [struck: Limitations][inserted: Certification] [struck: and][inserted: request] [struck: monitoring ]requirements[struck: of certification][inserted: .—]

(1) [inserted: Written request required.—] [inserted: A request for certification under subsection (a) shall be made in writing to the State, interstate water pollution control agency, or Administrator, as applicable.]

(2) [inserted: Requirements for complete request.—] [inserted: A completed request for certification under subsection (a) shall consist of—]

(A) [inserted: an identification of each applicant for the Federal license or permit with respect to which certification is requested;]

(B) [inserted: a statement that information included in the request for certification is truthful, accurate, and complete, to the best knowledge of each applicant;]

(C) [inserted: in the case of a request for certification with respect to an individual permit or license—]

(i) [inserted: an identification of the Federal license or permit that is the subject of the application with respect to which the certification is requested;]

(ii) [inserted: an identification, based on the reasonable belief of the applicant at the time the application is submitted, of any activity the conduct of which is subject to the Federal license or permit identified under clause (i);]

(iii) [inserted: an identification of—]

(I) [inserted: the location, point of origin, and characteristics of any discharge that may directly enter the navigable waters; and]

(II) [inserted: the location of the specific navigable waters that would receive such a discharge;]

(iv) [inserted: a description of the means that may be used to monitor, control, or manage a discharge identified under clause (iii); and]

(v) [inserted: a list of all other Federal, interstate, Tribal, State, or local agency authorizations required for the conduct of an activity identified under clause (ii), including a description of any authorizations described in that list that are already received; and]

(D) [inserted: in the case of a request for certification with respect to the issuance of a general license or a general permit—]

(i) [inserted: an identification of the proposed categories of activities to be covered by the general license or general permit;]

(ii) [inserted: a description of the proposed general license or general permit, which may include a draft of the proposed general license or general permit; and]

(iii) [inserted: an estimate of the number of discharges expected to result from the proposed general license or general permit annually.]

(3) [inserted: Prohibition.—] [inserted: No State or interstate water pollution control agency, nor the Administrator, may, for purposes of a request for certification under subsection (a), require the inclusion of information beyond the information described in paragraph (2).]

(e) [inserted: Certification conditions.—]

(1) [inserted: In general.—] [inserted: A certification obtained under subsection (a) shall set forth any effluent limitations and other limitations and monitoring requirements necessary to ensure that any discharge subject to a certification under that subsection will comply with the applicable provisions of sections 301, 302, 303, 306, and 307, and any such limitation or requirement shall be imposed by the Federal licensing or permitting agency as a condition on the applicable Federal license or permit subject to the provisions of this section.]

(2) [inserted: Requirements for conditions.—] [inserted: A certifying State or interstate water pollution control agency, or the Administrator, as applicable, may only include a condition on a certification under subsection (a) that requires the applicant to modify an activity of the applicant which may result in a discharge directly into the navigable waters if the State, interstate water pollution control agency, or Administrator determines, based on clear and convincing evidence, that the modification is—]

(A) [inserted: necessary for the activity to avoid violating an applicable provision of section 301, 302, 303, 306, or 307;]

(B) [inserted: least burdensome for the applicant, as compared to other possible modifications, taking into account—]

(i) [inserted: technical feasibility;]

(ii) [inserted: cost;]

(iii) [inserted: the purpose of the applicant in proposing the activity;]

(iv) [inserted: impacts on the schedule for the activity; and]

(v) [inserted: the commercial viability of the proposed condition; and]

(C) [inserted: consistent with the requirements for the Federal license or permit for which the certification is sought.]

(3) [inserted: Limitations on conditions for hydroelectric projects.—] [inserted: A certification obtained under subsection (a) for a hydroelectric project may not include conditions relating to the quantity, timing, or rate of water flow over, through, or around that project.]

(f) [inserted: Requirements for denial.—] [inserted: A certifying State or interstate water pollution control agency, or the Administrator, as applicable, may only deny a request for certification under subsection (a) if the State, interstate water pollution control agency, or Administrator determines, based on clear and convincing evidence, that there is no modification to or reasonable condition on the activities of the applicant that could make it possible for the activity to avoid violating an applicable provision of section 301, 302, 303, 306, or 307.]

(g) [inserted: Enforcement.—] [inserted: Notwithstanding section 505, any condition imposed on a Federal license or permit by a Federal licensing or permitting agency under this section may only be enforced by that Federal licensing or permitting agency.]

(h) [inserted: Judicial review.—]

(1) [inserted: Scope.—] [inserted: This subsection applies to any civil action for the review of a certification under subsection (a).]

(2) [inserted: Jurisdiction.—]

(A) [inserted: In general.—] [inserted: Notwithstanding section 19(d)(1) of the Natural Gas Act (15 U.S.C. 717r(d)(1)) or any other provision of law, a civil action subject to this subsection shall be filed in a court of appeals of the United States for—]

(i) [inserted: the judicial circuit in which the applicant is located or has its principal place of business;]

(ii) [inserted: the judicial circuit for the State in which the project for which the certification under subsection (a) would be issued is or will be located; or]

(iii) [inserted: the District of Columbia Circuit.]

(B) [inserted: Original and exclusive jurisdiction.—] [inserted: A court of appeals described in subparagraph (A) shall have original and exclusive jurisdiction over the applicable civil action.]

(C) [inserted: Standing.—] [inserted: Notwithstanding any other provision of law, no court shall have jurisdiction to review a civil action subject to this subsection unless the civil action is filed—]

(i) [inserted: not later than 60 days after the date on which final action on the certification under subsection (a) is taken; and]

(ii) [inserted: by—]

(I) [inserted: the applicant; or]

(II) [inserted: a person who has suffered, or likely and imminently will suffer, direct and irreparable economic harm from the certification, subject to the condition that an organization or association shall satisfy the requirement of this clause only if each member of the organization or association satisfies the requirement.]

(3) [inserted: Expedited consideration.—]

(A) [inserted: In general.—] [inserted: In reviewing a civil action subject to this subsection, a court shall—]

(i) [inserted: set any petition for review under that civil action for expedited consideration; and]

(ii) [inserted: subject to subparagraph (B), issue a final decision not later than 120 days after the date on which the civil action is filed.]

(B) [inserted: Extraordinary circumstances.—] [inserted: If a court finds that there are extraordinary circumstances that apply to a civil action subject to this subsection, the court may extend the 120-day period described in subparagraph (A)(ii) by an additional 60 days.]

(4) [inserted: Standard of review.—] [inserted: In reviewing the denial of a certification under subsection (a), a court shall find the denial unlawful unless the court finds, based on clear and convincing evidence, that—]

(A) [inserted: the certifying State or interstate water pollution control agency or the Administrator, as applicable, has demonstrated that no condition would achieve compliance with the applicable provisions of section 301, 302, 303, 306, or 307; and]

(B) [inserted: the certifying State or interstate water pollution control agency or the Administrator, as applicable, considered specific alternative conditions, including alternatives offered by the applicant, and determined that those alternative conditions would not achieve compliance with applicable provisions of section 301, 302, 303, 306, or 307.]

(5) [inserted: Nonapplicant challenges.—] [inserted: If a party other than the applicant brings a civil action subject to this subsection against a certification obtained under subsection (a), the nonapplicant party shall demonstrate, with clear and convincing evidence, that the project or activity for which the certification was granted fails to achieve compliance with applicable provisions of section 301, 302, 303, 306, or 307.]

(6) [inserted: Remedy.—]

(A) [inserted: No vacatur.—] [inserted: Notwithstanding any other provision of law, no court shall have the authority to set aside, vacate, nullify, or otherwise render unenforceable any certification under subsection (a).]

(B) [inserted: Limited remedies.—] [inserted: In a review of a certification under subsection (a), a court may only affirm or modify the certification, and may remand the certification to the State, interstate water pollution control agency, or the Administrator, as applicable, for corrective action.]

(i) [inserted: Description of applicable provisions.—] [inserted: For purposes of this section, the applicable provisions of sections 301, 302, 303, 306, and 307 are any applicable effluent limitations and other limitations under section 301 or 302, any water quality standard in effect for a State under section 303, any standard of performance under section 306, and any prohibition, effluent standard, or pretreatment standard under section 307.]

[struck: Any certification provided under this section shall set forth any effluent limitations and other limitations, and monitoring requirements necessary to assure that any applicant for a Federal license or permit will comply with any applicable effluent limitations and other limitations, under section 1311 or 1312 of this title, standard of performance under section 1316 of this title, or prohibition, effluent standard, or pretreatment standard under section 1317 of this title, and with any other appropriate requirement of State law set forth in such certification, and shall become a condition on any Federal license or permit subject to the provisions of this section.]

Step through the changes