Skip to content
The People's CodeSearch
Menu

Changes to the Code

S. 4944 · American Energy and Mineral Infrastructure Act of 2026 ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

15 U.S.C. § 717r Rehearing and review

+14 −2Shown
More for 15 U.S.C. § 717r
Read § 717rOnly this section
3 changes the bill asks for here, 3 carried out
  1. Carried out:

    in subsection (b), in the eighth sentence, by striking certification and all that follows through the period at the end and inserting certification as provided in section 1254 of title 28, United States Code.; and

  2. Carried out:

    in paragraph (3), in the first sentence, by striking If the Court finds and inserting the following: Except as provided in paragraph (6), if the Court finds; and

  3. Carried out:

    by adding at the end the following:(6) Exception for certain orders or actions.— (A) In general.— Notwithstanding any other provision of this section, for petitions challenging an order or action taken by the Commission under section 3 or section 7, the court may not set aside, vacate, or otherwise void that …

§ 717r(a)–(d)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 717r. Rehearing and review§ 717r. Rehearing and review
(a)(a) Application for rehearing; time(a) Application for rehearing; time
Any person, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this chapter to which such person, State, municipality, or State commission is a party may apply for a rehearing within thirty days after the issuance of such order. The application for rehearing shall set forth specifically the ground or grounds upon which such application is based. Upon such application the Commission shall have power to grant or deny rehearing or to abrogate or modify its order without further hearing. Unless the Commission acts upon the application for rehearing within thirty days after it is filed, such application may be deemed to have been denied. No proceeding to review any order of the Commission shall be brought by any person unless such person shall have made application to the Commission for a rehearing thereon. Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this chapter.Any person, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this chapter to which such person, State, municipality, or State commission is a party may apply for a rehearing within thirty days after the issuance of such order. The application for rehearing shall set forth specifically the ground or grounds upon which such application is based. Upon such application the Commission shall have power to grant or deny rehearing or to abrogate or modify its order without further hearing. Unless the Commission acts upon the application for rehearing within thirty days after it is filed, such application may be deemed to have been denied. No proceeding to review any order of the Commission shall be brought by any person unless such person shall have made application to the Commission for a rehearing thereon. Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this chapter.
(b)(b) Review of Commission order(b) Review of Commission order
Any party to a proceeding under this chapter aggrieved by an order issued by the Commission in such proceeding may obtain a review of such order in the court of appeals of the United States for any circuit wherein the natural-gas company to which the order relates is located or has its principal place of business, or in the United States Court of Appeals for the District of Columbia, by filing in such court, within sixty days after the order of the Commission upon the application for rehearing, a written petition praying that the order of the Commission be modified or set aside in whole or in part. A copy of such petition shall forthwith be transmitted by the clerk of the court to any member of the Commission and thereupon the Commission shall file with the court the record upon which the order complained of was entered, as provided in section 2112 of title 28. Upon the filing of such petition such court shall have jurisdiction, which upon the filing of the record with it shall be exclusive, to affirm, modify, or set aside such order in whole or in part. No objection to the order of the Commission shall be considered by the court unless such objection shall have been urged before the Commission in the application for rehearing unless there is reasonable ground for failure so to do. The finding of the Commission as to the facts, if supported by substantial evidence, shall be conclusive. If any party shall apply to the court for leave to adduce additional evidence, and shall show to the satisfaction of the court that such additional evidence is material and that there were reasonable grounds for failure to adduce such evidence in the proceedings before the Commission, the court may order such additional evidence to be taken before the Commission and to be adduced upon the hearing in such manner and upon such terms and conditions as to the court may seem proper. The Commission may modify its findings as to the facts by reason of the additional evidence so taken, and it shall file with the court such modified or new findings, which is supported by substantial evidence, shall be conclusive, and its recommendation, if any, for the modification or setting aside of the original order. The judgment and decree of the court, affirming, modifying, or setting aside, in whole or in part, any such order of the Commission, shall be final, subject to review by the Supreme Court of the United States upon certiorari or certification as provided in section 1254 of title 28.Any party to a proceeding under this chapter aggrieved by an order issued by the Commission in such proceeding may obtain a review of such order in the court of appeals of the United States for any circuit wherein the natural-gas company to which the order relates is located or has its principal place of business, or in the United States Court of Appeals for the District of Columbia, by filing in such court, within sixty days after the order of the Commission upon the application for rehearing, a written petition praying that the order of the Commission be modified or set aside in whole or in part. A copy of such petition shall forthwith be transmitted by the clerk of the court to any member of the Commission and thereupon the Commission shall file with the court the record upon which the order complained of was entered, as provided in section 2112 of title 28. Upon the filing of such petition such court shall have jurisdiction, which upon the filing of the record with it shall be exclusive, to affirm, modify, or set aside such order in whole or in part. No objection to the order of the Commission shall be considered by the court unless such objection shall have been urged before the Commission in the application for rehearing unless there is reasonable ground for failure so to do. The finding of the Commission as to the facts, if supported by substantial evidence, shall be conclusive. If any party shall apply to the court for leave to adduce additional evidence, and shall show to the satisfaction of the court that such additional evidence is material and that there were reasonable grounds for failure to adduce such evidence in the proceedings before the Commission, the court may order such additional evidence to be taken before the Commission and to be adduced upon the hearing in such manner and upon such terms and conditions as to the court may seem proper. The Commission may modify its findings as to the facts by reason of the additional evidence so taken, and it shall file with the court such modified or new findings, which is supported by substantial evidence, shall be conclusive, and its recommendation, if any, for the modification or setting aside of the original order. The judgment and decree of the court, affirming, modifying, or setting aside, in whole or in part, any such order of the Commission, shall be final, subject to review by the Supreme Court of the United States upon certiorari or certification as provided in section 1254 of title 28[inserted: , United States Code].
(c)(c) Stay of Commission order(c) Stay of Commission order
The filing of an application for rehearing under subsection (a) shall not, unless specifically ordered by the Commission, operate as a stay of the Commission’s order. The commencement of proceedings under subsection (b) of this section shall not, unless specifically ordered by the court, operate as a stay of the Commission’s order.The filing of an application for rehearing under subsection (a) shall not, unless specifically ordered by the Commission, operate as a stay of the Commission’s order. The commencement of proceedings under subsection (b) of this section shall not, unless specifically ordered by the court, operate as a stay of the Commission’s order.
(d)(d) Judicial review(d) Judicial review
(d)(1)(1) In general(1) In general
The United States Court of Appeals for the circuit in which a facility subject to section 717b of this title or section 717f of this title is proposed to be constructed, expanded, or operated shall have original and exclusive jurisdiction over any civil action for the review of an order or action of a Federal agency (other than the Commission) or State administrative agency acting pursuant to Federal law to issue, condition, or deny any permit, license, concurrence, or approval (hereinafter collectively referred to as “permit”) required under Federal law, other than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.).The United States Court of Appeals for the circuit in which a facility subject to section 717b of this title or section 717f of this title is proposed to be constructed, expanded, or operated shall have original and exclusive jurisdiction over any civil action for the review of an order or action of a Federal agency (other than the Commission) or State administrative agency acting pursuant to Federal law to issue, condition, or deny any permit, license, concurrence, or approval (hereinafter collectively referred to as “permit”) required under Federal law, other than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.).
(d)(2)(2) Agency delay(2) Agency delay
The United States Court of Appeals for the District of Columbia shall have original and exclusive jurisdiction over any civil action for the review of an alleged failure to act by a Federal agency (other than the Commission) or State administrative agency acting pursuant to Federal law to issue, condition, or deny any permit required under Federal law, other than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.), for a facility subject to section 717b of this title or section 717f of this title. The failure of an agency to take action on a permit required under Federal law, other than the Coastal Zone Management Act of 1972, in accordance with the Commission schedule established pursuant to section 717n(c) of this title shall be considered inconsistent with Federal law for the purposes of paragraph (3).The United States Court of Appeals for the District of Columbia shall have original and exclusive jurisdiction over any civil action for the review of an alleged failure to act by a Federal agency (other than the Commission) or State administrative agency acting pursuant to Federal law to issue, condition, or deny any permit required under Federal law, other than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.), for a facility subject to section 717b of this title or section 717f of this title. The failure of an agency to take action on a permit required under Federal law, other than the Coastal Zone Management Act of 1972, in accordance with the Commission schedule established pursuant to section 717n(c) of this title shall be considered inconsistent with Federal law for the purposes of paragraph (3).
(d)(3)(3) Court action(3) Court action
[struck: If] the Court finds that such order or action is inconsistent with the Federal law governing such permit and would prevent the construction, expansion, or operation of the facility subject to section 717b of this title or section 717f of this title, the Court shall remand the proceeding to the agency to take appropriate action consistent with the order of the Court. If the Court remands the order or action to the Federal or State agency, the Court shall set a reasonable schedule and deadline for the agency to act on remand.[inserted: Except] [inserted: as provided in paragraph (6), if ]the Court finds that such order or action is inconsistent with the Federal law governing such permit and would prevent the construction, expansion, or operation of the facility subject to section 717b of this title or section 717f of this title, the Court shall remand the proceeding to the agency to take appropriate action consistent with the order of the Court. If the Court remands the order or action to the Federal or State agency, the Court shall set a reasonable schedule and deadline for the agency to act on remand.
(d)(4)(4) Commission action(4) Commission action
For any action described in this subsection, the Commission shall file with the Court the consolidated record of such order or action to which the appeal hereunder relates.For any action described in this subsection, the Commission shall file with the Court the consolidated record of such order or action to which the appeal hereunder relates.
(d)(5)(5) Expedited review(5) Expedited review
The Court shall set any action brought under this subsection for expedited consideration.The Court shall set any action brought under this subsection for expedited consideration.
(d)(6)(6) [inserted: Exception for certain orders or actions.—]
(d)(6)(A)(A) [inserted: In general.—]
[inserted: Notwithstanding any other provision of this section, for petitions challenging an order or action taken by the Commission under section 3 or section 7, the court may not set aside, vacate, or otherwise void that order or action.]
(d)(6)(B)(B) [inserted: Court action.—]
[inserted: Notwithstanding chapter 7 of title 5, United States Code, the Court shall remand the proceeding, without vacatur or injunction, to the applicable Federal or State agency to take appropriate action if the Court finds that an order or action described in paragraph (1)—]
(d)(6)(B)(i)(i) [inserted: ]
[inserted: would prevent the construction, expansion, or operation of the facility subject to section 3 or 7; and]
(d)(6)(B)(ii)(ii) [inserted: ]
(d)(6)(B)(ii)(I)(I) [inserted: ]
[inserted: is inconsistent with applicable Federal law; or]
(d)(6)(B)(ii)(II)(II) [inserted: ]
[inserted: is not supported by clear and convincing evidence.]

30 U.S.C. § 28f Fee

+7 −45 of 8 shown
More for 30 U.S.C. § 28f
Read § 28fOnly this section
8 changes the bill asks for here, 5 carried out
  1. Carried out:

    by striking the Mining Law of 1872 (30 U.S.C. 28–28e) each place it appears and inserting sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.);

  2. Not carried out:

    in the second sentence, by striking Such claim maintenance fee and inserting the following:(B) Fee.— The claim maintenance fee under subparagraph (A); and

    The bill puts these words in a provision numbered (B), which can't be the first one in § 28f(a)(1), so we couldn't tell where it goes.

    Technical detail(B) can't be the first provision of /us/usc/t30/s28f/a/1
  3. Carried out:

    in the first sentence, by striking The holder of and inserting the following:(A) In general.— The holder of; and

  4. Carried out:

    by striking the Mining Law of 1872 (30 U.S.C. 28 to 28e) and inserting sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.); and

  5. Not carried out:

    by striking Such claim maintenance fee and inserting the following:(B) Fee.— The claim maintenance fee under subparagraph (A); and

    The bill puts these words in a provision numbered (B), which can't be the first one in § 28f(a)(2), so we couldn't tell where it goes.

    Technical detail(B) can't be the first provision of /us/usc/t30/s28f/a/2
  6. Carried out:

    in the first sentence, by striking The holder of and inserting the following:(A) In general.— The holder of; and

  7. Not carried out:

    in the second sentence, by striking The location fee and inserting the following:(2) Fee.— The location fee; and

    The bill turns “The location fee” into a provision of its own, but in § 28f(b) the text doesn't begin with those words. The law may have changed since the bill was drafted.

    Technical detail“The location fee” does not open the text of /us/usc/t30/s28f/b
  8. Carried out:

    in the first sentence, by striking The claim main tenance fee and inserting the following:(1) In general.— The claim maintenance fee.

§ 28f(a)–(d)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 28f. Fee§ 28f. Fee
(a)(a) Claim maintenance fee(a) Claim maintenance fee
(a)(1)(1) Lode mining claims, mill sites, and tunnel sites(1) Lode mining claims, mill sites, and tunnel sites
(a)(1)(A)(A) [inserted: In general.—]
[inserted: The holder of each unpatented lode mining claim, mill site, or tunnel site, located pursuant to the mining laws of the United States before, on, or after August 10, 1993, shall pay to the Secretary of the Interior, on or before September 1 of each year, to the extent provided in advance in appropriations Acts, a claim maintenance fee of $100 per claim or site, respectively. Such claim maintenance fee shall be in lieu of the assessment work requirement contained in sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.) and the related filing requirements contained in section 1744(a) and (c) of title 43.]
(a)(1)[struck: The holder of each unpatented lode mining claim, mill site, or tunnel site, located pursuant to the mining laws of the United States before, on, or after August 10, 1993, shall pay to the Secretary of the Interior, on or before September 1 of each year, to the extent provided in advance in appropriations Acts, a claim maintenance fee of $100 per claim or site, respectively. Such claim maintenance fee shall be in lieu of the assessment work requirement contained in the Mining Law of 1872 (30 U.S.C. 28–28e)1 and the related filing requirements contained in section 1744(a) and (c) of title 43.]
(a)(2)(2) Placer mining claims(2) Placer mining claims
(a)(2)(A)(A) [inserted: In general.—]
[inserted: The holder of each unpatented placer mining claim located pursuant to the mining laws of the United States before, on, or after August 10, 1993, shall pay to the Secretary of the Interior, on or before September 1 of each year, the claim maintenance fee described in subsection (a)(1), for each 20 acres of the placer claim or portion thereof. Such claim maintenance fee shall be in lieu of the assessment work requirement contained in sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.) 1 and the related filing requirements contained in section 1744(a) and (c) of title 43.]
(a)(2)[struck: The holder of each unpatented placer mining claim located pursuant to the mining laws of the United States before, on, or after August 10, 1993, shall pay to the Secretary of the Interior, on or before September 1 of each year, the claim maintenance fee described in subsection (a)(1), for each 20 acres of the placer claim or portion thereof. Such claim maintenance fee shall be in lieu of the assessment work requirement contained in the Mining Law of 1872 (30 U.S.C. 28 to 28e) 1 and the related filing requirements contained in section 1744(a) and (c) of title 43.]
(b)(b) Time of payment(b) Time of payment
(b)(1)(1) [inserted: In general.—]
[inserted: The claim maintenance fee under subsection (a) shall be paid for the year in which the location is made, at the time the location notice is recorded with the Bureau of Land Management. The location fee imposed under section 28g of this title shall be payable not later than 90 days after the date of location.]
(b)[struck: The claim main tenance2 fee under subsection (a) shall be paid for the year in which the location is made, at the time the location notice is recorded with the Bureau of Land Management. The location fee imposed under section 28g of this title shall be payable not later than 90 days after the date of location.]
(c)(c) Oil shale claims subject to claim maintenance fees under Energy Policy Act of 1992(c) Oil shale claims subject to claim maintenance fees under Energy Policy Act of 1992
This section shall not apply to any oil shale claims for which a fee is required to be paid under section 2511(e)(2) of the Energy Policy Act of 1992 (Public Law 102–486; 106 Stat. 3111; 30 U.S.C. 242).This section shall not apply to any oil shale claims for which a fee is required to be paid under section 2511(e)(2) of the Energy Policy Act of 1992 (Public Law 102–486; 106 Stat. 3111; 30 U.S.C. 242).
(d)(d) Waiver(d) Waiver
(d)(1)(1) (1)
The claim maintenance fee required under this section may be waived for a claimant who certifies in writing to the Secretary that on the date the payment was due, the claimant and all related parties—The claim maintenance fee required under this section may be waived for a claimant who certifies in writing to the Secretary that on the date the payment was due, the claimant and all related parties—
(d)(1)(A)(A) (A)
held not more than 10 mining claims, mill sites, or tunnel sites, or any combination thereof, on public lands; andheld not more than 10 mining claims, mill sites, or tunnel sites, or any combination thereof, on public lands; and
(d)(1)(B)(B) (B)
have performed assessment work required under [struck: the] [struck: Mining] [struck: Law] of [struck: 1872] (30 U.S.C. [struck: 28–28e]) 1 to maintain the mining claims held by the claimant and such related parties for the assessment year ending on noon of September 1 of the calendar year in which payment of the claim maintenance fee was due.have performed assessment work required under [inserted: sections] [inserted: 2319] [inserted: through] [inserted: 2344 ]of [inserted: the] [inserted: Revised Statutes ](30 U.S.C. [inserted: 22 et seq.]) 1 to maintain the mining claims held by the claimant and such related parties for the assessment year ending on noon of September 1 of the calendar year in which payment of the claim maintenance fee was due.
(d)(2)(2) (2)
For purposes of paragraph (1), with respect to any claimant, the term “related party” means—For purposes of paragraph (1), with respect to any claimant, the term “related party” means—
(d)(2)(A)(A) (A)
the spouse and dependent children (as defined in section 152 of title 26), of the claimant; andthe spouse and dependent children (as defined in section 152 of title 26), of the claimant; and

Rest of § 28f unchanged

30 U.S.C. § 42 Patents for nonmineral lands: application, survey, notice, acreage limitation, payment

+69 −0Shown
More for 30 U.S.C. § 42
Read § 42Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 2337 of the Revised Statutes (30 U.S.C. 42) is amended by adding at the end the following:(c) Additional mill sites.— (1) Definitions.— In this subsection: (A) Mill site.— The term “mill site” means a location of public land that is reasonably necessary for waste rock or tailings disposal or other operations reasonably incident to mineral development on, or …

§ 42(a)–(c)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 42. Patents for nonmineral lands: application, survey, notice, acreage limitation, payment§ 42. Patents for nonmineral lands: application, survey, notice, acreage limitation, payment
(a)(a) Vein or lode and mill site owners eligible(a) Vein or lode and mill site owners eligible
Where nonmineral land not contiguous to the vein or lode is used or occupied by the proprietor of such vein or lode for mining or milling purposes, such nonadjacent surface ground may be embraced and included in an application for a patent for such vein or lode, and the same may be patented therewith, subject to the same preliminary requirements as to survey and notice as are applicable to veins or lodes; but no location made on and after May 10, 1872, of such nonadjacent land shall exceed five acres, and payment for the same must be made at the same rate as fixed by sections 21, 22 to 24, 26 to 28, 29, 30, 33 to 48, 50 to 52, 71 to 76 of this title and section 661 of title 43 for the superficies of the lode. The owner of a quartz mill or reduction works, not owning a mine in connection therewith, may also receive a patent for his mill site, as provided in this section.Where nonmineral land not contiguous to the vein or lode is used or occupied by the proprietor of such vein or lode for mining or milling purposes, such nonadjacent surface ground may be embraced and included in an application for a patent for such vein or lode, and the same may be patented therewith, subject to the same preliminary requirements as to survey and notice as are applicable to veins or lodes; but no location made on and after May 10, 1872, of such nonadjacent land shall exceed five acres, and payment for the same must be made at the same rate as fixed by sections 21, 22 to 24, 26 to 28, 29, 30, 33 to 48, 50 to 52, 71 to 76 of this title and section 661 of title 43 for the superficies of the lode. The owner of a quartz mill or reduction works, not owning a mine in connection therewith, may also receive a patent for his mill site, as provided in this section.
(b)(b) Placer claim owners eligible(b) Placer claim owners eligible
Where nonmineral land is needed by the proprietor of a placer claim for mining, milling, processing, beneficiation, or other operations in connection with such claim, and is used or occupied by the proprietor for such purposes, such land may be included in an application for a patent for such claim, and may be patented therewith subject to the same requirements as to survey and notice as are applicable to placers. No location made of such nonmineral land shall exceed five acres and payment for the same shall be made at the rate applicable to placer claims which do not include a vein or lode.Where nonmineral land is needed by the proprietor of a placer claim for mining, milling, processing, beneficiation, or other operations in connection with such claim, and is used or occupied by the proprietor for such purposes, such land may be included in an application for a patent for such claim, and may be patented therewith subject to the same requirements as to survey and notice as are applicable to placers. No location made of such nonmineral land shall exceed five acres and payment for the same shall be made at the rate applicable to placer claims which do not include a vein or lode.
(c)(c) [inserted: Additional mill sites.—]
(c)(1)(1) [inserted: Definitions.—]
[inserted: In this subsection:]
(c)(1)(A)(A) [inserted: Mill site.—]
[inserted: The term “mill site” means a location of public land that is reasonably necessary for waste rock or tailings disposal or other operations reasonably incident to mineral development on, or production from land included in a plan of operations.]
(c)(1)(B)(B) [inserted: Operations; Operator.—]
[inserted: The terms “operations” and “operator” have the meanings given those terms in section 3809.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection).]
(c)(1)(C)(C) [inserted: Plan of operations.—]
[inserted: The term “plan of operations” means a plan of operations that an operator must submit and the Secretary of the Interior or the Secretary of Agriculture, as applicable, must approve before an operator may begin operations, in accordance with, as applicable—]
(c)(1)(C)(i)(i) [inserted: ]
[inserted: subpart 3809 of title 43, Code of Federal Regulations (or successor regulations establishing application and approval requirements); and]
(c)(1)(C)(ii)(ii) [inserted: ]
[inserted: part 228 of title 36, Code of Federal Regulations (or successor regulations establishing application and approval requirements).]
(c)(1)(D)(D) [inserted: Public land.—]
[inserted: The term “public land” means land owned by the United States that is open to location under sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.), including—]
(c)(1)(D)(i)(i) [inserted: ]
[inserted: land that is mineral-in-character (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection));]
(c)(1)(D)(ii)(ii) [inserted: ]
[inserted: nonmineral land (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection)); and]
(c)(1)(D)(iii)(iii) [inserted: ]
[inserted: land where the mineral character has not been determined.]
(c)(2)(2) [inserted: In general.—]
[inserted: Notwithstanding subsections (a) and (b), where public land is needed by the proprietor of a lode or placer claim for operations in connection with any lode or placer claim within the proposed plan of operations, the proprietor may—]
(c)(2)(A)(A) [inserted: ]
[inserted: locate and include within the plan of operations as many mill site claims under this subsection as are reasonably necessary for its operations; and]
(c)(2)(B)(B) [inserted: ]
[inserted: use or occupy public land in accordance with an approved plan of operations.]
(c)(3)(3) [inserted: Mill sites convey no mineral rights.—]
[inserted: A mill site under this subsection does not convey mineral rights to the locator.]
(c)(4)(4) [inserted: Size of mill sites.—]
[inserted: A location of a single mill site under this subsection shall not exceed 5 acres.]
(c)(5)(5) [inserted: Mill site and lode or placer claims on same tracts of public land.—]
[inserted: A mill site may be located under this subsection on a tract of public land on which the claimant or operator maintains a previously located lode or placer claim.]
(c)(6)(6) [inserted: Effect on mining claims.—]
[inserted: The location of a mill site under this subsection shall not affect the validity of any lode or placer claim, or any rights associated with such a claim.]
(c)(7)(7) [inserted: Patenting.—]
[inserted: A mill site under this section shall not be eligible for patenting.]
(c)(8)(8) [inserted: Savings provisions.—]
[inserted: Nothing in this subsection—]
(c)(8)(A)(A) [inserted: ]
[inserted: diminishes any right (including a right of entry, use, or occupancy) of a claimant;]
(c)(8)(B)(B) [inserted: ]
[inserted: creates or increases any right (including a right of exploration, entry, use, or occupancy) of a claimant on land that is not open to location under the general mining laws;]
(c)(8)(C)(C) [inserted: ]
[inserted: modifies any provision of law or any prior administrative action withdrawing land from location or entry;]
(c)(8)(D)(D) [inserted: ]
[inserted: limits the right of the Federal Government to regulate mining and mining-related activities (including requiring claim validity examinations to establish the discovery of a valuable mineral deposit) in areas withdrawn from mining, including under—]
(c)(8)(D)(i)(i) [inserted: ]
[inserted: the general mining laws;]
(c)(8)(D)(ii)(ii) [inserted: ]
[inserted: the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.);]
(c)(8)(D)(iii)(iii) [inserted: ]
[inserted: the Wilderness Act (16 U.S.C. 1131 et seq.);]
(c)(8)(D)(iv)(iv) [inserted: ]
[inserted: sections 100731 through 100737 of title 54, United States Code;]
(c)(8)(D)(v)(v) [inserted: ]
[inserted: the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.);]
(c)(8)(D)(vi)(vi) [inserted: ]
[inserted: division A of subtitle III of title 54, United States Code (commonly referred to as the ‘National Historic Preservation Act’); or]
(c)(8)(D)(vii)(vii) [inserted: ]
[inserted: section 4 of the Act of July 23, 1955 (commonly known as the “Surface Resources Act of 1955”) (69 Stat. 368, chapter 375; 30 U.S.C. 612);]
(c)(8)(E)(E) [inserted: ]
[inserted: restores any right (including a right of entry, use, or occupancy, or right to conduct operations) of a claimant that—]
(c)(8)(E)(i)(i) [inserted: ]
[inserted: existed prior to the date on which the land was closed to, or withdrawn from, location under the general mining laws; and]
(c)(8)(E)(ii)(ii) [inserted: ]
[inserted: that has been extinguished by such closure or withdrawal; or]
(c)(8)(F)(F) [inserted: ]
[inserted: modifies section 404 of division E of the Consolidated Appropriations Act, 2024 (Public Law 118–42).]

33 U.S.C. § 1341 Certification

+112 −43 of 5 shown
More for 33 U.S.C. § 1341
Read § 1341Only this section
5 changes the bill asks for here, 3 carried out
  1. Not carried out:

    by striking (a)(1) Any applicant and all that follows through No license in the sixth sentence of paragraph (1) and inserting the following:(a) Compliance with applicable requirements.— (1) Certification required.— (A) In general.— Any applicant for a Federal license or permit to conduct any activity, including the construction or operation of facilities, which may result in a discharge directly into the navigable …

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: striking QTEXT and all that follows through QTEXT in the sixth sentence of paragraph (X) and inserting the following: QCONTENT; and
  2. Carried out:

    in paragraph (4), in the first sentence, by striking any discharge into the navigable waters and inserting a discharge directly into the navigable waters;

  3. Not carried out:

    in subsection (b), by striking (b) Nothing and inserting the following:(b) Compliance with other provisions of law setting applicable water quality requirements.— Except as provided in subsection (e), nothing;

    The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.

    Technical detailthe provision inserted says more than a heading and the words struck
  4. Carried out:

    in subsection (c), by striking (c) In order and inserting the following:(c) Authority of Secretary of the Army To permit spoil disposal areas by Federal licensees or permittees.— In order; and

  5. Carried out:

    by striking subsection (d) and inserting the following:(d) Certification request requirements.— (1) Written request required.— A request for certification under subsection (a) shall be made in writing to the State, interstate water pollution control agency, or Administrator, as applicable. (2) Requirements for complete request.— A …

§ 1341(a)–(d)

Start of § 1341 to (a)(2) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(3)(3) (3)
The certification obtained pursuant to paragraph (1) of this subsection with respect to the construction of any facility shall fulfill the requirements of this subsection with respect to certification in connection with any other Federal license or permit required for the operation of such facility unless, after notice to the certifying State, agency, or Administrator, as the case may be, which shall be given by the Federal agency to whom application is made for such operating license or permit, the State, or if appropriate, the interstate agency or the Administrator, notifies such agency within sixty days after receipt of such notice that there is no longer reasonable assurance that there will be compliance with the applicable provisions of sections 1311, 1312, 1313, 1316, and 1317 of this title because of changes since the construction license or permit certification was issued in (A) the construction or operation of the facility, (B) the characteristics of the waters into which such discharge is made, (C) the water quality criteria applicable to such waters or (D) applicable effluent limitations or other requirements. This paragraph shall be inapplicable in any case where the applicant for such operating license or permit has failed to provide the certifying State, or, if appropriate, the interstate agency or the Administrator, with notice of any proposed changes in the construction or operation of the facility with respect to which a construction license or permit has been granted, which changes may result in violation of section 1311, 1312, 1313, 1316, or 1317 of this title.The certification obtained pursuant to paragraph (1) of this subsection with respect to the construction of any facility shall fulfill the requirements of this subsection with respect to certification in connection with any other Federal license or permit required for the operation of such facility unless, after notice to the certifying State, agency, or Administrator, as the case may be, which shall be given by the Federal agency to whom application is made for such operating license or permit, the State, or if appropriate, the interstate agency or the Administrator, notifies such agency within sixty days after receipt of such notice that there is no longer reasonable assurance that there will be compliance with the applicable provisions of sections 1311, 1312, 1313, 1316, and 1317 of this title because of changes since the construction license or permit certification was issued in (A) the construction or operation of the facility, (B) the characteristics of the waters into which such discharge is made, (C) the water quality criteria applicable to such waters or (D) applicable effluent limitations or other requirements. This paragraph shall be inapplicable in any case where the applicant for such operating license or permit has failed to provide the certifying State, or, if appropriate, the interstate agency or the Administrator, with notice of any proposed changes in the construction or operation of the facility with respect to which a construction license or permit has been granted, which changes may result in violation of section 1311, 1312, 1313, 1316, or 1317 of this title.
(a)(4)(4) (4)
Prior to the initial operation of any federally licensed or permitted facility or activity which may result in [struck: any] discharge into the navigable waters and with respect to which a certification has been obtained pursuant to paragraph (1) of this subsection, which facility or activity is not subject to a Federal operating license or permit, the licensee or permittee shall provide an opportunity for such certifying State, or, if appropriate, the interstate agency or the Administrator to review the manner in which the facility or activity shall be operated or conducted for the purposes of assuring that applicable effluent limitations or other limitations or other applicable water quality requirements will not be violated. Upon notification by the certifying State, or if appropriate, the interstate agency or the Administrator that the operation of any such federally licensed or permitted facility or activity will violate applicable effluent limitations or other limitations or other water quality requirements such Federal agency may, after public hearing, suspend such license or permit. If such license or permit is suspended, it shall remain suspended until notification is received from the certifying State, agency, or Administrator, as the case may be, that there is reasonable assurance that such facility or activity will not violate the applicable provisions of section 1311, 1312, 1313, 1316, or 1317 of this title.Prior to the initial operation of any federally licensed or permitted facility or activity which may result in [inserted: a] discharge [inserted: directly ]into the navigable waters and with respect to which a certification has been obtained pursuant to paragraph (1) of this subsection, which facility or activity is not subject to a Federal operating license or permit, the licensee or permittee shall provide an opportunity for such certifying State, or, if appropriate, the interstate agency or the Administrator to review the manner in which the facility or activity shall be operated or conducted for the purposes of assuring that applicable effluent limitations or other limitations or other applicable water quality requirements will not be violated. Upon notification by the certifying State, or if appropriate, the interstate agency or the Administrator that the operation of any such federally licensed or permitted facility or activity will violate applicable effluent limitations or other limitations or other water quality requirements such Federal agency may, after public hearing, suspend such license or permit. If such license or permit is suspended, it shall remain suspended until notification is received from the certifying State, agency, or Administrator, as the case may be, that there is reasonable assurance that such facility or activity will not violate the applicable provisions of section 1311, 1312, 1313, 1316, or 1317 of this title.
(a)(5)(5) (5)
Any Federal license or permit with respect to which a certification has been obtained under paragraph (1) of this subsection may be suspended or revoked by the Federal agency issuing such license or permit upon the entering of a judgment under this chapter that such facility or activity has been operated in violation of the applicable provisions of section 1311, 1312, 1313, 1316, or 1317 of this title.Any Federal license or permit with respect to which a certification has been obtained under paragraph (1) of this subsection may be suspended or revoked by the Federal agency issuing such license or permit upon the entering of a judgment under this chapter that such facility or activity has been operated in violation of the applicable provisions of section 1311, 1312, 1313, 1316, or 1317 of this title.
(a)(6)(6) (6)
Except with respect to a permit issued under section 1342 of this title, in any case where actual construction of a facility has been lawfully commenced prior to April 3, 1970, no certification shall be required under this subsection for a license or permit issued after April 3, 1970, to operate such facility, except that any such license or permit issued without certification shall terminate April 3, 1973, unless prior to such termination date the person having such license or permit submits to the Federal agency which issued such license or permit a certification and otherwise meets the requirements of this section.Except with respect to a permit issued under section 1342 of this title, in any case where actual construction of a facility has been lawfully commenced prior to April 3, 1970, no certification shall be required under this subsection for a license or permit issued after April 3, 1970, to operate such facility, except that any such license or permit issued without certification shall terminate April 3, 1973, unless prior to such termination date the person having such license or permit submits to the Federal agency which issued such license or permit a certification and otherwise meets the requirements of this section.
(b)(b) Compliance with other provisions of law setting applicable water quality requirements(b) Compliance with other provisions of law setting applicable water quality requirements
Nothing in this section shall be construed to limit the authority of any department or agency pursuant to any other provision of law to require compliance with any applicable water quality requirements. The Administrator shall, upon the request of any Federal department or agency, or State or interstate agency, or applicant, provide, for the purpose of this section, any relevant information on applicable effluent limitations, or other limitations, standards, regulations, or requirements, or water quality criteria, and shall, when requested by any such department or agency or State or interstate agency, or applicant, comment on any methods to comply with such limitations, standards, regulations, requirements, or criteria.Nothing in this section shall be construed to limit the authority of any department or agency pursuant to any other provision of law to require compliance with any applicable water quality requirements. The Administrator shall, upon the request of any Federal department or agency, or State or interstate agency, or applicant, provide, for the purpose of this section, any relevant information on applicable effluent limitations, or other limitations, standards, regulations, or requirements, or water quality criteria, and shall, when requested by any such department or agency or State or interstate agency, or applicant, comment on any methods to comply with such limitations, standards, regulations, requirements, or criteria.
(c)(c) Authority of Secretary of the Army [struck: to] permit [struck: use of ]spoil disposal areas by Federal licensees or permittees(c) Authority of Secretary of the Army [inserted: To] permit spoil disposal areas by Federal licensees or permittees[inserted: .—]
In order to implement the provisions of this section, the Secretary of the Army, acting through the Chief of Engineers, is authorized, if he deems it to be in the public interest, to permit the use of spoil disposal areas under his jurisdiction by Federal licensees or permittees, and to make an appropriate charge for such use. Moneys received from such licensees or permittees shall be deposited in the Treasury as miscellaneous receipts.In order to implement the provisions of this section, the Secretary of the Army, acting through the Chief of Engineers, is authorized, if he deems it to be in the public interest, to permit the use of spoil disposal areas under his jurisdiction by Federal licensees or permittees, and to make an appropriate charge for such use. Moneys received from such licensees or permittees shall be deposited in the Treasury as miscellaneous receipts.
(d)(d) [struck: Limitations] [struck: and] [struck: monitoring ]requirements[struck: of certification](d) [inserted: Certification] [inserted: request] requirements[inserted: .—]
(d)(1)(1) [inserted: Written request required.—]
[inserted: A request for certification under subsection (a) shall be made in writing to the State, interstate water pollution control agency, or Administrator, as applicable.]
(d)(2)(2) [inserted: Requirements for complete request.—]
[inserted: A completed request for certification under subsection (a) shall consist of—]
(d)(2)(A)(A) [inserted: ]
[inserted: an identification of each applicant for the Federal license or permit with respect to which certification is requested;]
(d)(2)(B)(B) [inserted: ]
[inserted: a statement that information included in the request for certification is truthful, accurate, and complete, to the best knowledge of each applicant;]
(d)(2)(C)(C) [inserted: ]
[inserted: in the case of a request for certification with respect to an individual permit or license—]
(d)(2)(C)(i)(i) [inserted: ]
[inserted: an identification of the Federal license or permit that is the subject of the application with respect to which the certification is requested;]
(d)(2)(C)(ii)(ii) [inserted: ]
[inserted: an identification, based on the reasonable belief of the applicant at the time the application is submitted, of any activity the conduct of which is subject to the Federal license or permit identified under clause (i);]
(d)(2)(C)(iii)(iii) [inserted: ]
[inserted: an identification of—]
(d)(2)(C)(iii)(I)(I) [inserted: ]
[inserted: the location, point of origin, and characteristics of any discharge that may directly enter the navigable waters; and]
(d)(2)(C)(iii)(II)(II) [inserted: ]
[inserted: the location of the specific navigable waters that would receive such a discharge;]
(d)(2)(C)(iv)(iv) [inserted: ]
[inserted: a description of the means that may be used to monitor, control, or manage a discharge identified under clause (iii); and]
(d)(2)(C)(v)(v) [inserted: ]
[inserted: a list of all other Federal, interstate, Tribal, State, or local agency authorizations required for the conduct of an activity identified under clause (ii), including a description of any authorizations described in that list that are already received; and]
(d)(2)(D)(D) [inserted: ]
[inserted: in the case of a request for certification with respect to the issuance of a general license or a general permit—]
(d)(2)(D)(i)(i) [inserted: ]
[inserted: an identification of the proposed categories of activities to be covered by the general license or general permit;]
(d)(2)(D)(ii)(ii) [inserted: ]
[inserted: a description of the proposed general license or general permit, which may include a draft of the proposed general license or general permit; and]
(d)(2)(D)(iii)(iii) [inserted: ]
[inserted: an estimate of the number of discharges expected to result from the proposed general license or general permit annually.]
(d)(3)(3) [inserted: Prohibition.—]
[inserted: No State or interstate water pollution control agency, nor the Administrator, may, for purposes of a request for certification under subsection (a), require the inclusion of information beyond the information described in paragraph (2).]
(e)(e) [inserted: Certification conditions.—]
(e)(1)(1) [inserted: In general.—]
[inserted: A certification obtained under subsection (a) shall set forth any effluent limitations and other limitations and monitoring requirements necessary to ensure that any discharge subject to a certification under that subsection will comply with the applicable provisions of sections 301, 302, 303, 306, and 307, and any such limitation or requirement shall be imposed by the Federal licensing or permitting agency as a condition on the applicable Federal license or permit subject to the provisions of this section.]
(e)(2)(2) [inserted: Requirements for conditions.—]
[inserted: A certifying State or interstate water pollution control agency, or the Administrator, as applicable, may only include a condition on a certification under subsection (a) that requires the applicant to modify an activity of the applicant which may result in a discharge directly into the navigable waters if the State, interstate water pollution control agency, or Administrator determines, based on clear and convincing evidence, that the modification is—]
(e)(2)(A)(A) [inserted: ]
[inserted: necessary for the activity to avoid violating an applicable provision of section 301, 302, 303, 306, or 307;]
(e)(2)(B)(B) [inserted: ]
[inserted: least burdensome for the applicant, as compared to other possible modifications, taking into account—]
(e)(2)(B)(i)(i) [inserted: ]
[inserted: technical feasibility;]
(e)(2)(B)(ii)(ii) [inserted: ]
[inserted: cost;]
(e)(2)(B)(iii)(iii) [inserted: ]
[inserted: the purpose of the applicant in proposing the activity;]
(e)(2)(B)(iv)(iv) [inserted: ]
[inserted: impacts on the schedule for the activity; and]
(e)(2)(B)(v)(v) [inserted: ]
[inserted: the commercial viability of the proposed condition; and]
(e)(2)(C)(C) [inserted: ]
[inserted: consistent with the requirements for the Federal license or permit for which the certification is sought.]
(e)(3)(3) [inserted: Limitations on conditions for hydroelectric projects.—]
[inserted: A certification obtained under subsection (a) for a hydroelectric project may not include conditions relating to the quantity, timing, or rate of water flow over, through, or around that project.]
(f)(f) [inserted: Requirements for denial.—]
[inserted: A certifying State or interstate water pollution control agency, or the Administrator, as applicable, may only deny a request for certification under subsection (a) if the State, interstate water pollution control agency, or Administrator determines, based on clear and convincing evidence, that there is no modification to or reasonable condition on the activities of the applicant that could make it possible for the activity to avoid violating an applicable provision of section 301, 302, 303, 306, or 307.]
(g)(g) [inserted: Enforcement.—]
[inserted: Notwithstanding section 505, any condition imposed on a Federal license or permit by a Federal licensing or permitting agency under this section may only be enforced by that Federal licensing or permitting agency.]
(h)(h) [inserted: Judicial review.—]
(h)(1)(1) [inserted: Scope.—]
[inserted: This subsection applies to any civil action for the review of a certification under subsection (a).]
(h)(2)(2) [inserted: Jurisdiction.—]
(h)(2)(A)(A) [inserted: In general.—]
[inserted: Notwithstanding section 19(d)(1) of the Natural Gas Act (15 U.S.C. 717r(d)(1)) or any other provision of law, a civil action subject to this subsection shall be filed in a court of appeals of the United States for—]
(h)(2)(A)(i)(i) [inserted: ]
[inserted: the judicial circuit in which the applicant is located or has its principal place of business;]
(h)(2)(A)(ii)(ii) [inserted: ]
[inserted: the judicial circuit for the State in which the project for which the certification under subsection (a) would be issued is or will be located; or]
(h)(2)(A)(iii)(iii) [inserted: ]
[inserted: the District of Columbia Circuit.]
(h)(2)(B)(B) [inserted: Original and exclusive jurisdiction.—]
[inserted: A court of appeals described in subparagraph (A) shall have original and exclusive jurisdiction over the applicable civil action.]
(h)(2)(C)(C) [inserted: Standing.—]
[inserted: Notwithstanding any other provision of law, no court shall have jurisdiction to review a civil action subject to this subsection unless the civil action is filed—]
(h)(2)(C)(i)(i) [inserted: ]
[inserted: not later than 60 days after the date on which final action on the certification under subsection (a) is taken; and]
(h)(2)(C)(ii)(ii) [inserted: ]
[inserted: by—]
(h)(2)(C)(ii)(I)(I) [inserted: ]
[inserted: the applicant; or]
(h)(2)(C)(ii)(II)(II) [inserted: ]
[inserted: a person who has suffered, or likely and imminently will suffer, direct and irreparable economic harm from the certification, subject to the condition that an organization or association shall satisfy the requirement of this clause only if each member of the organization or association satisfies the requirement.]
(h)(3)(3) [inserted: Expedited consideration.—]
(h)(3)(A)(A) [inserted: In general.—]
[inserted: In reviewing a civil action subject to this subsection, a court shall—]
(h)(3)(A)(i)(i) [inserted: ]
[inserted: set any petition for review under that civil action for expedited consideration; and]
(h)(3)(A)(ii)(ii) [inserted: ]
[inserted: subject to subparagraph (B), issue a final decision not later than 120 days after the date on which the civil action is filed.]
(h)(3)(B)(B) [inserted: Extraordinary circumstances.—]
[inserted: If a court finds that there are extraordinary circumstances that apply to a civil action subject to this subsection, the court may extend the 120-day period described in subparagraph (A)(ii) by an additional 60 days.]
(h)(4)(4) [inserted: Standard of review.—]
[inserted: In reviewing the denial of a certification under subsection (a), a court shall find the denial unlawful unless the court finds, based on clear and convincing evidence, that—]
(h)(4)(A)(A) [inserted: ]
[inserted: the certifying State or interstate water pollution control agency or the Administrator, as applicable, has demonstrated that no condition would achieve compliance with the applicable provisions of section 301, 302, 303, 306, or 307; and]
(h)(4)(B)(B) [inserted: ]
[inserted: the certifying State or interstate water pollution control agency or the Administrator, as applicable, considered specific alternative conditions, including alternatives offered by the applicant, and determined that those alternative conditions would not achieve compliance with applicable provisions of section 301, 302, 303, 306, or 307.]
(h)(5)(5) [inserted: Nonapplicant challenges.—]
[inserted: If a party other than the applicant brings a civil action subject to this subsection against a certification obtained under subsection (a), the nonapplicant party shall demonstrate, with clear and convincing evidence, that the project or activity for which the certification was granted fails to achieve compliance with applicable provisions of section 301, 302, 303, 306, or 307.]
(h)(6)(6) [inserted: Remedy.—]
(h)(6)(A)(A) [inserted: No vacatur.—]
[inserted: Notwithstanding any other provision of law, no court shall have the authority to set aside, vacate, nullify, or otherwise render unenforceable any certification under subsection (a).]
(h)(6)(B)(B) [inserted: Limited remedies.—]
[inserted: In a review of a certification under subsection (a), a court may only affirm or modify the certification, and may remand the certification to the State, interstate water pollution control agency, or the Administrator, as applicable, for corrective action.]
(i)(i) [inserted: Description of applicable provisions.—]
[inserted: For purposes of this section, the applicable provisions of sections 301, 302, 303, 306, and 307 are any applicable effluent limitations and other limitations under section 301 or 302, any water quality standard in effect for a State under section 303, any standard of performance under section 306, and any prohibition, effluent standard, or pretreatment standard under section 307.]
(d)[struck: Any certification provided under this section shall set forth any effluent limitations and other limitations, and monitoring requirements necessary to assure that any applicant for a Federal license or permit will comply with any applicable effluent limitations and other limitations, under section 1311 or 1312 of this title, standard of performance under section 1316 of this title, or prohibition, effluent standard, or pretreatment standard under section 1317 of this title, and with any other appropriate requirement of State law set forth in such certification, and shall become a condition on any Federal license or permit subject to the provisions of this section.]

33 U.S.C. § 1342 National pollutant discharge elimination system

+19 −1Shown
More for 33 U.S.C. § 1342
Read § 1342Only this section
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    Section 402(a) of the Federal Water Pollution Control Act (33 U.S.C. 1342(a)) is amended by adding at the end the following:(6) General permits.— (A) Permits authorized.— The Administrator may issue general permits under this section on a State, regional, or nationwide basis, or for a delineated area, for discharges associated with any category of activities the discharges of which are of similar …

  2. Carried out:

    Section 402(b)(1)(B) of the Federal Water Pollution Control Act (33 U.S.C. 1342(b)(1)(B)) is amended by striking five years and inserting 10 years.

§ 1342(a)–(b)

Start of § 1342 to (a)(3) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(4)(4) (4)
All permits for discharges into the navigable waters issued pursuant to section 407 of this title shall be deemed to be permits issued under this subchapter, and permits issued under this subchapter shall be deemed to be permits issued under section 407 of this title, and shall continue in force and effect for their term unless revoked, modified, or suspended in accordance with the provisions of this chapter.All permits for discharges into the navigable waters issued pursuant to section 407 of this title shall be deemed to be permits issued under this subchapter, and permits issued under this subchapter shall be deemed to be permits issued under section 407 of this title, and shall continue in force and effect for their term unless revoked, modified, or suspended in accordance with the provisions of this chapter.
(a)(5)(5) (5)
No permit for a discharge into the navigable waters shall be issued under section 407 of this title after October 18, 1972. Each application for a permit under section 407 of this title, pending on October 18, 1972, shall be deemed to be an application for a permit under this section. The Administrator shall authorize a State, which he determines has the capability of administering a permit program which will carry out the objectives of this chapter to issue permits for discharges into the navigable waters within the jurisdiction of such State. The Administrator may exercise the authority granted him by the preceding sentence only during the period which begins on October 18, 1972, and ends either on the ninetieth day after the date of the first promulgation of guidelines required by section 1314(i)(2) of this title, or the date of approval by the Administrator of a permit program for such State under subsection (b) of this section, whichever date first occurs, and no such authorization to a State shall extend beyond the last day of such period. Each such permit shall be subject to such conditions as the Administrator determines are necessary to carry out the provisions of this chapter. No such permit shall issue if the Administrator objects to such issuance.No permit for a discharge into the navigable waters shall be issued under section 407 of this title after October 18, 1972. Each application for a permit under section 407 of this title, pending on October 18, 1972, shall be deemed to be an application for a permit under this section. The Administrator shall authorize a State, which he determines has the capability of administering a permit program which will carry out the objectives of this chapter to issue permits for discharges into the navigable waters within the jurisdiction of such State. The Administrator may exercise the authority granted him by the preceding sentence only during the period which begins on October 18, 1972, and ends either on the ninetieth day after the date of the first promulgation of guidelines required by section 1314(i)(2) of this title, or the date of approval by the Administrator of a permit program for such State under subsection (b) of this section, whichever date first occurs, and no such authorization to a State shall extend beyond the last day of such period. Each such permit shall be subject to such conditions as the Administrator determines are necessary to carry out the provisions of this chapter. No such permit shall issue if the Administrator objects to such issuance.
(a)(6)(6) [inserted: General permits.—]
(a)(6)(A)(A) [inserted: Permits authorized.—]
[inserted: The Administrator may issue general permits under this section on a State, regional, or nationwide basis, or for a delineated area, for discharges associated with any category of activities the discharges of which are of similar types and from similar sources.]
(a)(6)(B)(B) [inserted: Permit expiration notification.—]
[inserted: If the Administrator does not intend to issue a general permit under this paragraph that covers discharges that are substantially similar to discharges covered by a previously issued general permit, not later than the date that is 2 years before the date on which the previously issued general permit will expire, the Administrator shall publish in the Federal Register a notice of the decision not to reissue the general permit.]
(a)(6)(C)(C) [inserted: Application of permit terms of an expired permit.—]
(a)(6)(C)(i)(i) [inserted: In general.—]
[inserted: If a general permit issued under this paragraph expires and the Administrator has not published a notice under subparagraph (B), the Administrator shall, until the date described in clause (ii)—]
(a)(6)(C)(i)(I)(I) [inserted: ]
[inserted: continue to apply the terms, conditions, and requirements of the expired general permit to any discharge that was covered by the expired general permit; and]
(a)(6)(C)(i)(II)(II) [inserted: ]
[inserted: apply those terms, conditions, and requirements to any discharge that would have been covered by the expired general permit (in accordance with any relevant requirements for that coverage) if the discharge had occurred before that expiration.]
(a)(6)(C)(ii)(ii) [inserted: Date described.—]
[inserted: The date referred to in clause (i) is the date that is the earlier of—]
(a)(6)(C)(ii)(I)(I) [inserted: ]
[inserted: the date on which the Administrator issues a new general permit for discharges substantially similar to those covered by the expired general permit; and]
(a)(6)(C)(ii)(II)(II) [inserted: ]
[inserted: the date that is 2 years after the date on which the Administrator publishes in the Federal Register a notice described in subparagraph (B).]
(b)(b) State permit programs(b) State permit programs
At any time after the promulgation of the guidelines required by subsection (i)(2) of section 1314 of this title, the Governor of each State desiring to administer its own permit program for discharges into navigable waters within its jurisdiction may submit to the Administrator a full and complete description of the program it proposes to establish and administer under State law or under an interstate compact. In addition, such State shall submit a statement from the attorney general (or the attorney for those State water pollution control agencies which have independent legal counsel), or from the chief legal officer in the case of an interstate agency, that the laws of such State, or the interstate compact, as the case may be, provide adequate authority to carry out the described program. The Administrator shall approve each submitted program unless he determines that adequate authority does not exist:At any time after the promulgation of the guidelines required by subsection (i)(2) of section 1314 of this title, the Governor of each State desiring to administer its own permit program for discharges into navigable waters within its jurisdiction may submit to the Administrator a full and complete description of the program it proposes to establish and administer under State law or under an interstate compact. In addition, such State shall submit a statement from the attorney general (or the attorney for those State water pollution control agencies which have independent legal counsel), or from the chief legal officer in the case of an interstate agency, that the laws of such State, or the interstate compact, as the case may be, provide adequate authority to carry out the described program. The Administrator shall approve each submitted program unless he determines that adequate authority does not exist:
(b)(1)(1) (1)
To issue permits which—To issue permits which—
(b)(1)(A)(A) (A)
apply, and insure compliance with, any applicable requirements of sections 1311, 1312, 1316, 1317, and 1343 of this title;apply, and insure compliance with, any applicable requirements of sections 1311, 1312, 1316, 1317, and 1343 of this title;
(b)(1)(B)(B) (B)
are for fixed terms not exceeding [struck: five] years; andare for fixed terms not exceeding [inserted: 10] years; and
(b)(1)(C)(C) (C)
can be terminated or modified for cause including, but not limited to, the following:can be terminated or modified for cause including, but not limited to, the following:
(b)(1)(C)(i)(i) (i)
violation of any condition of the permit;violation of any condition of the permit;

Rest of § 1342 unchanged

33 U.S.C. § 1344 Permits for dredged or fill material

+126 −36 of 13 shown
More for 33 U.S.C. § 1344
Read § 1344Only this section
13 changes the bill asks for here, 6 carried out
  1. Carried out:

    by striking his findings and his reasons and inserting the findings and reasons of the Administrator; and

  2. Carried out:

    by striking The Administrator and inserting the following:(4) Written determination.— The Administrator;

  3. Not carried out:

    in the second sentence, by striking Before making such determination, and inserting the following:(3) Consultation.— Before making a determination under paragraph (1),;

    The bill puts these words in a provision numbered (3), which can't be the first one in § 1344(c), so we couldn't tell where it goes.

    Technical detail(3) can't be the first provision of /us/usc/t33/s1344/c
  4. Not carried out:

    by striking (c) The Administrator and inserting the following:(c) Specification or use of defined area.— (1) In general.— The Administrator;

    The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.

    Technical detailthe provision inserted says more than a heading and the words struck
  5. Not carried out:

    by striking he is authorized; and

    The bill points to paragraph (1) of § 1344(c), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no paragraph (1) in /us/usc/t33/s1344/c
  6. Not carried out:

    by striking he determines, after notice and opportunity for public hearings, and inserting the Administrator determines, during the period described in paragraph (2) and after notice and opportunity for public hearings,; and

    The bill points to paragraph (1) of § 1344(c), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no paragraph (1) in /us/usc/t33/s1344/c
  7. Not carried out:

    by inserting after paragraph (1) (as so designated) the following:(2) Period of prohibition.— The period during which the Administrator may prohibit the specification (including the withdrawal of specification) of a defined area as a disposal site, or deny or restrict the use of a defined area for specification (including the withdrawal of …

    The bill points to paragraph (1) of § 1344(c), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailno paragraph (1) in /us/usc/t33/s1344/c
  8. Not carried out:

    by striking (e)(1) In carrying out his functions and inserting the following:(e) General permits.— (1) Permits authorized.— In carrying out the functions of the Secretary;

    The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.

    Technical detailthe provision inserted says more than a heading and the words struck
  9. Carried out:

    by striking (2) No general and inserting the following:(2) Term.— No general; and

  10. Carried out:

    by striking five years and inserting 10 years; and

  11. Carried out:

    by adding at the end the following:(3) Considerations.— In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary— (A) shall consider only the effects of any discharge of dredged or fill material resulting from the activity; (B) shall consider any effects of a discharge of …

  12. Not carried out:

    in subsection (t), by striking (t) Nothing in the section and inserting the following:(u) Savings provision.— Nothing in this section; and

    The bill puts these words in a provision numbered (u), which can't be the first one in § 1344(t), so we couldn't tell where it goes.

    Technical detail(u) can't be the first provision of /us/usc/t33/s1344/t
  13. Carried out:

    by inserting after subsection (s) the following:(t) Judicial review.— (1) Statute of limitations.— Notwithstanding any applicable provision of law— (A) an action seeking judicial review of the approval by the Administrator of a State permit program pursuant to this section shall be filed not later than 60 days after the date …

    The section already has a provision under this letter or number, so it would have two.

This bill puts a provision under a letter or number this section already uses, so the section would have two. The law has probably changed since the bill was written.

§ 1344(a)–(f)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 1344. Permits for dredged or fill material§ 1344. Permits for dredged or fill material
(a)(a) Discharge into navigable waters at specified disposal sites(a) Discharge into navigable waters at specified disposal sites
The Secretary may issue permits, after notice and opportunity for public hearings for the discharge of dredged or fill material into the navigable waters at specified disposal sites. Not later than the fifteenth day after the date an applicant submits all the information required to complete an application for a permit under this subsection, the Secretary shall publish the notice required by this subsection.The Secretary may issue permits, after notice and opportunity for public hearings for the discharge of dredged or fill material into the navigable waters at specified disposal sites. Not later than the fifteenth day after the date an applicant submits all the information required to complete an application for a permit under this subsection, the Secretary shall publish the notice required by this subsection.
(b)(b) Specification for disposal sites(b) Specification for disposal sites
Subject to subsection (c) of this section, each such disposal site shall be specified for each such permit by the Secretary (1) through the application of guidelines developed by the Administrator, in conjunction with the Secretary, which guidelines shall be based upon criteria comparable to the criteria applicable to the territorial seas, the contiguous zone, and the ocean under section 1343(c) of this title, and (2) in any case where such guidelines under clause (1) alone would prohibit the specification of a site, through the application additionally of the economic impact of the site on navigation and anchorage.Subject to subsection (c) of this section, each such disposal site shall be specified for each such permit by the Secretary (1) through the application of guidelines developed by the Administrator, in conjunction with the Secretary, which guidelines shall be based upon criteria comparable to the criteria applicable to the territorial seas, the contiguous zone, and the ocean under section 1343(c) of this title, and (2) in any case where such guidelines under clause (1) alone would prohibit the specification of a site, through the application additionally of the economic impact of the site on navigation and anchorage.
(c)(c) Denial or restriction of use of defined areas as disposal sites(c) Denial or restriction of use of defined areas as disposal sites
(c)(4)(4) [inserted: Written determination.—]
[inserted: The Administrator is authorized to prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, and he is authorized to deny or restrict the use of any defined area for specification (including the withdrawal of specification) as a disposal site, whenever he determines, after notice and opportunity for public hearings, that the discharge of such materials into such area will have an unacceptable adverse effect on municipal water supplies, shellfish beds and fishery areas (including spawning and breeding areas), wildlife, or recreational areas. Before making such determination, the Administrator shall consult with the Secretary. The Administrator shall set forth in writing and make public the findings and reasons of the Administrator for making any determination under this subsection.]
(c)[struck: The Administrator is authorized to prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, and he is authorized to deny or restrict the use of any defined area for specification (including the withdrawal of specification) as a disposal site, whenever he determines, after notice and opportunity for public hearings, that the discharge of such materials into such area will have an unacceptable adverse effect on municipal water supplies, shellfish beds and fishery areas (including spawning and breeding areas), wildlife, or recreational areas. Before making such determination, the Administrator shall consult with the Secretary. The Administrator shall set forth in writing and make public his findings and his reasons for making any determination under this subsection.]
(d)(d) “Secretary” defined(d) “Secretary” defined
The term “Secretary” as used in this section means the Secretary of the Army, acting through the Chief of Engineers.The term “Secretary” as used in this section means the Secretary of the Army, acting through the Chief of Engineers.
(e)(e) General permits on State, regional, or nationwide basis(e) General permits on State, regional, or nationwide basis
(e)(1)(1) (1)
In carrying out his functions relating to the discharge of dredged or fill material under this section, the Secretary may, after notice and opportunity for public hearing, issue general permits on a State, regional, or nationwide basis for any category of activities involving discharges of dredged or fill material if the Secretary determines that the activities in such category are similar in nature, will cause only minimal adverse environmental effects when performed separately, and will have only minimal cumulative adverse effect on the environment. Any general permit issued under this subsection shall (A) be based on the guidelines described in subsection (b)(1) of this section, and (B) set forth the requirements and standards which shall apply to any activity authorized by such general permit.In carrying out his functions relating to the discharge of dredged or fill material under this section, the Secretary may, after notice and opportunity for public hearing, issue general permits on a State, regional, or nationwide basis for any category of activities involving discharges of dredged or fill material if the Secretary determines that the activities in such category are similar in nature, will cause only minimal adverse environmental effects when performed separately, and will have only minimal cumulative adverse effect on the environment. Any general permit issued under this subsection shall (A) be based on the guidelines described in subsection (b)(1) of this section, and (B) set forth the requirements and standards which shall apply to any activity authorized by such general permit.
(e)(2)(2) (2) [inserted: Term.—]
No general permit issued under this subsection shall be for a period of more than [struck: five] years after the date of its issuance and such general permit may be revoked or modified by the Secretary if, after opportunity for public hearing, the Secretary determines that the activities authorized by such general permit have an adverse impact on the environment or such activities are more appropriately authorized by individual permits.No general permit issued under this subsection shall be for a period of more than [inserted: 10] years after the date of its issuance and such general permit may be revoked or modified by the Secretary if, after opportunity for public hearing, the Secretary determines that the activities authorized by such general permit have an adverse impact on the environment or such activities are more appropriately authorized by individual permits.
(e)(3)(3) [inserted: Considerations.—]
[inserted: In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary—]
(e)(3)(A)(A) [inserted: ]
[inserted: shall consider only the effects of any discharge of dredged or fill material resulting from the activity;]
(e)(3)(B)(B) [inserted: ]
[inserted: shall consider any effects of a discharge of dredged or fill material into less than 3 acres of navigable waters to be a minimal adverse environmental effect; and]
(e)(3)(C)(C) [inserted: ]
[inserted: may consider any effects of a discharge of dredged or fill material into 3 acres or more of navigable waters to be a minimal adverse environmental effect.]
(e)(4)(4) [inserted: Nationwide permits for linear projects.—]
(e)(4)(A)(A) [inserted: Definitions.—]
[inserted: In this paragraph:]
(e)(4)(A)(i)(i) [inserted: Linear infrastructure project.—]
[inserted: The term “linear infrastructure project” means a project to carry out any activity required for—]
(e)(4)(A)(i)(I)(I) [inserted: ]
[inserted: the construction, expansion, maintenance, modification, or removal of infrastructure and associated facilities for the transmission from a point of origin to a terminal point of communications or electricity; or]
(e)(4)(A)(i)(II)(II) [inserted: ]
[inserted: the transportation from a point of origin to a terminal point of people, water, or wastewater.]
(e)(4)(A)(ii)(ii) [inserted: Linear pipeline project.—]
[inserted: The term “linear pipeline project” means a project to carry out any activity required for the construction, expansion, maintenance, modification, or removal of infrastructure and associated facilities for the transportation from a point of origin to a terminal point of carbon dioxide, fuel, or hydrocarbons, in the form of a liquid, liquescent, gaseous, or slurry substance or supercritical fluid, including oil and gas pipeline facilities.]
(e)(4)(A)(iii)(iii) [inserted: Single and complete project.—]
[inserted: The term “single and complete project” has the meaning given the term in section 330.2 of title 33, Code of Federal Regulations (as in effect on the date of enactment of this paragraph).]
(e)(4)(B)(B) [inserted: Rule.—]
[inserted: Notwithstanding any other provision of this section, the Secretary shall issue and maintain general permits on a nationwide basis under this subsection for—]
(e)(4)(B)(i)(i) [inserted: ]
[inserted: linear infrastructure projects that result in a discharge of dredged or fill material into less than 3 acres of navigable waters for each single and complete project; and]
(e)(4)(B)(ii)(ii) [inserted: ]
[inserted: linear pipeline projects that do not result in the loss of navigable waters in an area that is greater than 0.5 acres for each single and complete project.]
(e)(4)(C)(C) [inserted: Pipeline threshold floor.—]
[inserted: Nothing in subparagraph (B)(ii) limits the authority of the Secretary to authorize pipeline-related discharges of dredged or fill material into areas of navigable waters that are greater than 0.5 acres but below the 3-acre threshold described in subparagraph (B)(i).]
(e)(5)(5) [inserted: Reissuance of nationwide permits.—]
[inserted: In determining whether to reissue a general permit issued under this subsection on a nationwide basis—]
(e)(5)(A)(A) [inserted: ]
[inserted: no consultation with an applicable State pursuant to section 6(a) of the Endangered Species Act of 1973 (16 U.S.C. 1535(a)) is required;]
(e)(5)(B)(B) [inserted: ]
[inserted: no consultation with a Federal agency pursuant to section 7(a)(2) of that Act (16 U.S.C. 1536(a)(2)) is required; and]
(e)(5)(C)(C) [inserted: ]
[inserted: the requirements of section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) shall be satisfied by preparing an environmental assessment (as defined in section 111 of that Act (42 U.S.C. 4336e)) with respect to the general permit.]
(f)(f) Non-prohibited discharge of dredged or fill ma­terial(f) Non-prohibited discharge of dredged or fill ma­terial
(f)(1)(1) (1)
Except as provided in paragraph (2) of this subsection, the discharge of dredged or fill material—Except as provided in paragraph (2) of this subsection, the discharge of dredged or fill material—

§ 1344(s)–(t)

(f)(1)(A)–(s)(2) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(s)(3)(3) (3)
The Secretary is authorized to commence a civil action for appropriate relief, including a permanent or temporary injunction for any violation for which he is authorized to issue a compliance order under paragraph (1) of this subsection. Any action under this paragraph may be brought in the district court of the United States for the district in which the defendant is located or resides or is doing business, and such court shall have jurisdiction to restrain such violation and to require compliance. Notice of the commencement of such acton1 shall be given immediately to the appropriate State.The Secretary is authorized to commence a civil action for appropriate relief, including a permanent or temporary injunction for any violation for which he is authorized to issue a compliance order under paragraph (1) of this subsection. Any action under this paragraph may be brought in the district court of the United States for the district in which the defendant is located or resides or is doing business, and such court shall have jurisdiction to restrain such violation and to require compliance. Notice of the commencement of such acton1 shall be given immediately to the appropriate State.
(s)(4)(4) (4)
Any person who violates any condition or limitation in a permit issued by the Secretary under this section, and any person who violates any order issued by the Secretary under paragraph (1) of this subsection, shall be subject to a civil penalty not to exceed $25,000 per day for each violation. In determining the amount of a civil penalty the court shall consider the seriousness of the violation or violations, the economic benefit (if any) resulting from the violation, any history of such violations, any good-faith efforts to comply with the applicable requirements, the economic impact of the penalty on the violator, and such other matters as justice may require.Any person who violates any condition or limitation in a permit issued by the Secretary under this section, and any person who violates any order issued by the Secretary under paragraph (1) of this subsection, shall be subject to a civil penalty not to exceed $25,000 per day for each violation. In determining the amount of a civil penalty the court shall consider the seriousness of the violation or violations, the economic benefit (if any) resulting from the violation, any history of such violations, any good-faith efforts to comply with the applicable requirements, the economic impact of the penalty on the violator, and such other matters as justice may require.
(t)(t) [inserted: Judicial review.—]
(t)(1)(1) [inserted: Statute of limitations.—]
[inserted: Notwithstanding any applicable provision of law—]
(t)(1)(A)(A) [inserted: ]
[inserted: an action seeking judicial review of the approval by the Administrator of a State permit program pursuant to this section shall be filed not later than 60 days after the date on which the approval was issued;]
(t)(1)(B)(B) [inserted: ]
[inserted: an action seeking judicial review of an individual permit or general permit issued under this section shall be filed not later than 60 days after the date on which the permit was issued; and]
(t)(1)(C)(C) [inserted: ]
[inserted: an action seeking judicial review of a verification that an activity involving the discharge of dredged or fill material is authorized by a general permit issued under this section shall be filed not later than 60 days after the date on which the verification was issued.]
(t)(2)(2) [inserted: Limitation on commencement of certain actions.—]
[inserted: Notwithstanding any other provision of law, no action described in subparagraph (A) or (B) of paragraph (1) may be commenced unless the action—]
(t)(2)(A)(A) [inserted: ]
[inserted: is filed by a party that submitted a comment—]
(t)(2)(A)(i)(i) [inserted: ]
[inserted: during the public comment period for the administrative proceedings related to the action; and]
(t)(2)(A)(ii)(ii) [inserted: ]
[inserted: which was sufficiently detailed to put the Administrator, the Secretary, or the State, as applicable, on notice of the issue on which the party seeks judicial review; and]
(t)(2)(B)(B) [inserted: ]
[inserted: is related to that comment.]
(t)(3)(3) [inserted: Jurisdiction.—]
(t)(3)(A)(A) [inserted: In general.—]
[inserted: Unless otherwise provided by law, a civil action subject to this subsection shall be filed in a court of appeals of the United States for—]
(t)(3)(A)(i)(i) [inserted: ]
[inserted: the judicial circuit in which, as applicable—]
(t)(3)(A)(i)(I)(I) [inserted: ]
[inserted: the applicant for the applicable permit is located or has its principal place of business; or]
(t)(3)(A)(i)(II)(II) [inserted: ]
[inserted: the person seeking the applicable verification is located or has its principal place of business;]
(t)(3)(A)(ii)(ii) [inserted: ]
[inserted: the judicial circuit for the State, as applicable—]
(t)(3)(A)(ii)(I)(I) [inserted: ]
[inserted: for which the approval for a State permit program pursuant to this section was sought; or]
(t)(3)(A)(ii)(II)(II) [inserted: ]
[inserted: in which—]
(t)(3)(A)(ii)(II)(aa)(aa) [inserted: ]
[inserted: the activity for which the permit was sought would be carried out; or]
(t)(3)(A)(ii)(II)(bb)(bb) [inserted: ]
[inserted: the activity for which the verification was sought would be carried out; or]
(t)(3)(A)(iii)(iii) [inserted: ]
[inserted: the District of Columbia Circuit.]
(t)(3)(B)(B) [inserted: Original and exclusive jurisdiction.—]
[inserted: A court of appeals described in subparagraph (A) shall have original and exclusive jurisdiction over the applicable civil action.]
(t)(3)(C)(C) [inserted: Standing.—]
[inserted: Notwithstanding any other provision of law, no court shall have jurisdiction to review a civil action subject to this subsection unless the civil action is filed—]
(t)(3)(C)(i)(i) [inserted: ]
[inserted: not later than 60 days after the date on which the challenged action was finalized; and]
(t)(3)(C)(ii)(ii) [inserted: ]
[inserted: by—]
(t)(3)(C)(ii)(I)(I) [inserted: ]
[inserted: the applicant; or]
(t)(3)(C)(ii)(II)(II) [inserted: ]
[inserted: a person who has suffered, or likely and imminently will suffer, direct and irreparable economic harm from the approval, permit, or verification, subject to the condition that an organization or association shall satisfy the requirement of this clause only if each member of the organization or association satisfies the requirement.]
(t)(4)(4) [inserted: Standard of review.—]
[inserted: In reviewing the denial of a permit under this section, a court shall find the denial unlawful unless the court finds, based on clear and convincing evidence, that—]
(t)(4)(A)(A) [inserted: ]
[inserted: the Secretary has demonstrated that no condition on the permit would achieve compliance with the applicable provisions of section 301, 302, 303, 306, or 307; and]
(t)(4)(B)(B) [inserted: ]
[inserted: the Secretary considered specific alternative conditions, including alternatives offered by the applicant, and determined that those alternative conditions would not achieve compliance with this section.]
(t)(5)(5) [inserted: Nonapplicant challenges.—]
[inserted: If a party other than the applicant brings a civil action subject to this subsection seeking review of a permit under this section, the nonapplicant party shall demonstrate, with clear and convincing evidence, that, as applicable, the approval of the State permit program, the project for which the permit was granted, or the project for which verification was provided fails to achieve compliance with this section.]
(t)(6)(6) [inserted: Remedies.—]
(t)(6)(A)(A) [inserted: Actions relating to permit programs.—]
[inserted: If a court determines that the Administrator, in issuing the approval of a State permit program under this section, did not comply with this section—]
(t)(6)(A)(i)(i) [inserted: ]
[inserted: the court shall remand the matter to the Administrator for further proceedings consistent with the determination of the court; and]
(t)(6)(A)(ii)(ii) [inserted: ]
[inserted: the court may not vacate, revoke, enjoin, or otherwise limit the authority of the State to issue permits under that State permit program.]
(t)(6)(B)(B) [inserted: Actions relating to permits.—]
[inserted: If a court determines that the Secretary or a State, as applicable, did not comply with the requirements of this section in issuing an individual or general permit under this section, or in verifying that an activity involving a discharge of dredged or fill material is authorized by a general permit issued under this section, as applicable—]
(t)(6)(B)(i)(i) [inserted: ]
[inserted: the court shall remand the matter to the Secretary or the State, as applicable, for further proceedings consistent with the determination of the court;]
(t)(6)(B)(ii)(ii) [inserted: ]
[inserted: with respect to a determination regarding the issuance of an individual or general permit under this section—]
(t)(6)(B)(ii)(I)(I) [inserted: ]
[inserted: the court may not vacate, revoke, enjoin, or otherwise limit the permit unless the court finds that activities authorized under the permit would present an imminent and substantial danger to human health or the environment for which there is no other equitable remedy available under the law; and]
(t)(6)(B)(ii)(II)(II) [inserted: ]
[inserted: any injunction or other limitation ordered pursuant to subclause (I)—]
(t)(6)(B)(ii)(II)(aa)(aa) [inserted: ]
[inserted: shall be narrowly tailored to the specific crossing, discharge, segment, or activity found to present an imminent and substantial danger; and]
(t)(6)(B)(ii)(II)(bb)(bb) [inserted: ]
[inserted: may not extend to unrelated crossings, spreads, or project segments that are independently authorized and not the source of the alleged harm; and]
(t)(6)(B)(iii)(iii) [inserted: ]
[inserted: with respect to a determination regarding a verification that an activity involving a discharge of dredged or fill material is authorized by a general permit issued under this section, the court may not enjoin or otherwise limit the discharge unless the court finds that activities authorized under the permit would present an imminent and substantial danger to human health or the environment for which there is no other equitable remedy available under the law.]
(t)(7)(7) [inserted: Timeline to act on court order.—]
[inserted: If a court remands a matter under paragraph (6), the court shall set and enforce a reasonable schedule and deadline, which may not exceed 180 days from the date on which the court remands the matter except as otherwise required by law, for the Administrator, the Secretary, or a State, as applicable, to take such actions as the court may order.]
(t)(t) Navigable waters within State jurisdiction(t) Navigable waters within State jurisdiction
Nothing in this section shall preclude or deny the right of any State or interstate agency to control the discharge of dredged or fill material in any portion of the navigable waters within the jurisdiction of such State, including any activity of any Federal agency, and each such agency shall comply with such State or interstate requirements both substantive and procedural to control the discharge of dredged or fill material to the same extent that any person is subject to such requirements. This section shall not be construed as affecting or impairing the authority of the Secretary to maintain navigation.Nothing in this section shall preclude or deny the right of any State or interstate agency to control the discharge of dredged or fill material in any portion of the navigable waters within the jurisdiction of such State, including any activity of any Federal agency, and each such agency shall comply with such State or interstate requirements both substantive and procedural to control the discharge of dredged or fill material to the same extent that any person is subject to such requirements. This section shall not be construed as affecting or impairing the authority of the Secretary to maintain navigation.

42 U.S.C. § 4321 Congressional declaration of purpose

+14 −01 of 2 shown
More for 42 U.S.C. § 4321
Read § 4321Only this section
2 changes the bill asks for here, 1 carried out
  1. Not carried out:

    by striking the section designation and heading and all that follows through are: To and inserting the following:2. Purposes (a) Purposes.— The purposes of this Act are to; and

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: striking the section designation and heading and all that follows through QTEXT and inserting the following: QCONTENT; and
  2. Carried out:

    by adding at the end the following:(b) Intent.— This Act— (1) is a procedural statute intended to ensure Federal agencies consider the environmental impacts of their actions during the decisionmaking process; (2) does not mandate particular results; and (3) only prescribes a purely procedural process. (c) …

§ 4321(b)–(c)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 4321. Congressional declaration of purpose§ 4321. Congressional declaration of purpose
The purposes of this chapter are: To declare a national policy which will encourage productive and enjoyable harmony between man and his environment; to promote efforts which will prevent or eliminate damage to the environment and biosphere and stimulate the health and welfare of man; to enrich the understanding of the ecological systems and natural resources important to the Nation; and to establish a Council on Environmental Quality.The purposes of this chapter are: To declare a national policy which will encourage productive and enjoyable harmony between man and his environment; to promote efforts which will prevent or eliminate damage to the environment and biosphere and stimulate the health and welfare of man; to enrich the understanding of the ecological systems and natural resources important to the Nation; and to establish a Council on Environmental Quality.
(b)(b) [inserted: Intent.—]
[inserted: This Act—]
(b)(1)(1) [inserted: ]
[inserted: is a procedural statute intended to ensure Federal agencies consider the environmental impacts of their actions during the decisionmaking process;]
(b)(2)(2) [inserted: ]
[inserted: does not mandate particular results; and]
(b)(3)(3) [inserted: ]
[inserted: only prescribes a purely procedural process.]
(c)(c) [inserted: Effect.—]
[inserted: Nothing in this Act—]
(c)(1)(1) [inserted: ]
[inserted: mandates any specific environmental outcome or result; or]
(c)(2)(2) [inserted: ]
[inserted: confers substantive rights or imposes substantive duties beyond procedural requirements.]

42 U.S.C. § 4336 Procedure for determination of level of review

+27 −57 of 9 shown
More for 42 U.S.C. § 4336
Read § 4336Only this section
9 changes the bill asks for here, 7 carried out
  1. Carried out:

    in the section heading, by inserting ; scope of review after level of review;

  2. Not carried out:

    in paragraph (2), by striking 109 of this Act, and inserting 109, a categorical exclusion established by Congress,;

    “109 of this Act,” isn't in § 4336(a)(2) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“109 of this Act,” not found in /us/usc/t42/s4336/a/2
  3. Carried out:

    in paragraph (3), by striking or;

  4. Carried out:

    in paragraph (4), by striking the period at the end and inserting a semicolon; and

  5. Carried out:

    by adding at the end the following:(5) the proposed agency action is an action for which such agency’s compliance with another statute’s requirements serve a similar function as the requirements of this Act with respect to such action; or (6) the proposed agency action— (A) relates to a project or action that has …

  6. Carried out:

    by striking does not and inserting is not likely to; and

  7. Not carried out:

    by striking 109 of this Act, and inserting 109, a categorical exclusion established by Congress,; and

    “109 of this Act,” isn't in § 4336(b)(2) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“109 of this Act,” not found in /us/usc/t42/s4336/b/2
  8. Carried out:

    in paragraph (3), by striking subparagraph (B) and inserting the following:(B) is not required to undertake new scientific or technical research— (i) unless the new scientific or technical research is essential to a reasoned choice among alternatives, and the overall costs and time frame of obtaining it are not unreasonable; or (ii) after the receipt …

  9. Carried out:

    by adding at the end the following:(c) Scope of review.— In preparing an environmental document for a proposed agency action, a Federal agency— (1) may only consider effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; …

§ 4336(a)–(b)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 4336. Procedure for determination of level of review§ 4336. Procedure for determination of level of review[inserted: ; scope of review]
(a)(a) Threshold determinations(a) Threshold determinations
An agency is not required to prepare an environmental document with respect to a proposed agency action if—An agency is not required to prepare an environmental document with respect to a proposed agency action if—
(a)(1)(1) (1)
the proposed agency action is not a final agency action within the meaning of such term in chapter 5 of title 5;the proposed agency action is not a final agency action within the meaning of such term in chapter 5 of title 5;
(a)(2)(2) (2)
the proposed agency action is excluded pursuant to one of the agency’s categorical exclusions, another agency’s categorical exclusions consistent with section 4336c of this title, or another provision of law;the proposed agency action is excluded pursuant to one of the agency’s categorical exclusions, another agency’s categorical exclusions consistent with section 4336c of this title, or another provision of law;
(a)(3)(3) (3)
the preparation of such document would clearly and fundamentally conflict with the requirements of another provision of law;[struck: or]the preparation of such document would clearly and fundamentally conflict with the requirements of another provision of law;
(a)(4)(4) (4)
the proposed agency action is a nondiscretionary action with respect to which such agency does not have authority to take environmental factors into consideration in determining whether to take the proposed action[struck: .]the proposed agency action is a nondiscretionary action with respect to which such agency does not have authority to take environmental factors into consideration in determining whether to take the proposed action[inserted: ;]
(a)(5)(5) [inserted: ]
[inserted: the proposed agency action is an action for which such agency’s compliance with another statute’s requirements serve a similar function as the requirements of this Act with respect to such action; or]
(a)(6)(6) [inserted: ]
[inserted: the proposed agency action—]
(a)(6)(A)(A) [inserted: ]
[inserted: relates to a project or action that has already been reviewed pursuant to a State or Tribal environmental review statute, ordinance, resolution, regulation, or formally adopted policy; and]
(a)(6)(B)(B) [inserted: ]
[inserted: the lead agency determines such review meets the requirements of this Act.]
(b)(b) Levels of review(b) Levels of review
(b)(1)(1) Environmental impact statement(1) Environmental impact statement
An agency shall issue an environmental impact statement with respect to a proposed agency action requiring an environmental document that has a reasonably foreseeable significant effect on the quality of the human environment.An agency shall issue an environmental impact statement with respect to a proposed agency action requiring an environmental document that has a reasonably foreseeable significant effect on the quality of the human environment.
(b)(2)(2) Environmental assessment(2) Environmental assessment
An agency shall prepare an environmental assessment with respect to a proposed agency action that [struck: does] not have a reasonably foreseeable significant effect on the quality of the human environment, or if the significance of such effect is unknown, unless the agency finds that the proposed agency action is excluded pursuant to one of the agency’s categorical exclusions, another agency’s categorical exclusions consistent with section 4336c of this title, or another provision of law. Such environmental assessment shall be a concise public document prepared by a Federal agency to set forth the basis of such agency’s finding of no significant impact or determination that an environmental impact statement is necessary.An agency shall prepare an environmental assessment with respect to a proposed agency action that [inserted: is] not [inserted: likely to ]have a reasonably foreseeable significant effect on the quality of the human environment, or if the significance of such effect is unknown, unless the agency finds that the proposed agency action is excluded pursuant to one of the agency’s categorical exclusions, another agency’s categorical exclusions consistent with section 4336c of this title, or another provision of law. Such environmental assessment shall be a concise public document prepared by a Federal agency to set forth the basis of such agency’s finding of no significant impact or determination that an environmental impact statement is necessary.
(b)(3)(3) Sources of information(3) Sources of information
In making a determination under this subsection, an agency—In making a determination under this subsection, an agency—
(b)(3)(A)(A) (A)
may make use of any reliable data source; andmay make use of any reliable data source; and
(b)(3)(B)(B) (B)
[inserted: is not required to undertake new scientific or technical research—]
(b)(3)(B)(i)(i) [inserted: ]
[inserted: unless the new scientific or technical research is essential to a reasoned choice among alternatives, and the overall costs and time frame of obtaining it are not unreasonable; or]
(b)(3)(B)(ii)(ii) [inserted: ]
[inserted: after the receipt of an application, as applicable, with respect to such proposed agency action.]
(c)(c) [inserted: Scope of review.—]
[inserted: In preparing an environmental document for a proposed agency action, a Federal agency—]
(c)(1)(1) [inserted: ]
[inserted: may only consider effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and]
(c)(2)(2) [inserted: ]
[inserted: may not consider effects that are speculative, attenuated from the project or action, separate in time or place from the project or action, or in relation to separate existing or potential future projects or actions.]
(d)(d) [inserted: Presumption of negative impacts of taking no action relating to tribal trust resources.—]
[inserted: For any proposed agency action carried out on, or directly affecting, Tribal trust resources (including land and minerals) that is initiated by the federally recognized Indian Tribe for which the United States holds the affected resources in trust, and for which an environmental document was prepared that included consideration of a no action alternative, there shall be a presumption that the effects of taking no action will be negative for the federally recognized Indian Tribe.]
(e)(e) [inserted: Effect of threshold determinations on other agencies.—]
[inserted: If a lead agency determines that an environmental document is not required to be prepared with respect to a proposed agency action under subsection (a), no other Federal agency may prepare an environmental document with respect to the proposed agency action.]
(b)(3)(B)[struck: is not required to undertake new scientific or technical research unless the new scientific or technical research is essential to a reasoned choice among alternatives, and the overall costs and time frame of obtaining it are not unreasonable.]

42 U.S.C. § 4336a Timely and unified Federal reviews

+97 −31Shown
More for 42 U.S.C. § 4336a
Read § 4336aOnly this section
19 changes the bill asks for here, 19 carried out
  1. Carried out:

    in subparagraph (B), by striking at the earliest practicable time and inserting in accordance with subsection (g)(2);

  2. Carried out:

    in subparagraph (D), by striking carry out the proposed agency action and inserting carry out the proposed agency action in accordance with the deadlines described in subsection (g); and

  3. Carried out:

    by striking a review and inserting an environmental review; and

  4. Carried out:

    by striking such review and inserting such environmental review; and

  5. Carried out:

    in the first sentence, by inserting (including counties, boroughs, parishes, and other political subdivisions of a State) after local agency; and

  6. Carried out:

    by adding at the end the following: Such comments from Federal cooperating agencies shall be limited to matters relating to the proposed agency action with respect to which the Federal cooperating agency has jurisdiction by law..

  7. Carried out:

    by striking To the extent practicable, and inserting the following:(1) Document.— To the extent practicable,; and

  8. Carried out:

    by adding at the end the following:(2) Consideration timing.— (A) In general.— In preparing an environmental document for a proposed agency action, no Federal agency shall be required to consider any scientific or technical research that becomes publicly available after the earlier of, as applicable— (i) the date …

  9. Carried out:

    Section 107(d) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(d)) is amended by striking the period at the end and inserting , which shall, where applicable, meet the goals of the applicant..

  10. Carried out:

    by redesignating paragraphs (1), (2), and (3) as paragraphs (3), (5), and (6), respectively;

  11. Carried out:

    by inserting before paragraph (3) (as so redesignated) the following:(1) Applications for authorizations.— (A) Notification of complete or incomplete application.— Unless a shorter deadline is specified by law, in connection with a proposed agency action for which an applicant submitted an application for an authorization to an agency, not later …

  12. Carried out:

    in the paragraph heading, by striking In general and inserting Review timeline; and

  13. Carried out:

    in the matter preceding subparagraph (A), by striking paragraph (2) and inserting paragraph (5);

  14. Carried out:

    by inserting after paragraph (3) (as so redesignated) the following:(4) Deadline for final agency action.— (A) In general.— For any proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 30 days after completing an environmental impact statement or an environmental assessment for …

  15. Carried out:

    by striking the deadline described in paragraph (1) and inserting a deadline described in this subsection; and

  16. Carried out:

    by striking , in consultation with the applicant, to and inserting if the applicant approves such extension. If the applicant approves such extension, the lead agency shall;

  17. Carried out:

    in subparagraph (A), by striking A project sponsor may and inserting Except as provided in subparagraph (C), a project sponsor may; and

  18. Carried out:

    by adding at the end the following:(C) Exception.— A project sponsor that approved an extension of a deadline under paragraph (5) may not obtain judicial review of a failure to act in accordance with such deadline under subparagraph (A) unless the lead agency fails to meet the new deadline or is delaying for …

  19. Carried out:

    by adding at the end the following:(7) Concurrent review.— In carrying out an environmental review, the lead agency and each cooperating agency shall carry out the obligations of that agency under other applicable laws concurrently, and in conjunction, with other required reviews for the proposed agency action, …

§ 4336a(a)Lead agency(2)–(5)

Start of § 4336a to (a)(2) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(2)(A)(A) (A)
supervise the preparation of an environmental document if, with respect to such proposed agency action, there is more than one participating Federal agency;supervise the preparation of an environmental document if, with respect to such proposed agency action, there is more than one participating Federal agency;
(2)(B)(B) (B)
request the participation of each cooperating agency [struck: at] [struck: the] [struck: earliest] [struck: practicable] [struck: time];request the participation of each cooperating agency [inserted: in] [inserted: accordance] [inserted: with] [inserted: subsection] [inserted: (g)(2)];
(2)(C)(C) (C)
in preparing an environmental document, give consideration to any analysis or proposal created by a cooperating agency;in preparing an environmental document, give consideration to any analysis or proposal created by a cooperating agency;
(2)(D)(D) (D)
develop a schedule, in consultation with each cooperating agency, the applicant, and such other entities as the lead agency determines appropriate, for completion of any environmental review, permit, or authorization required to carry out the proposed agency action;develop a schedule, in consultation with each cooperating agency, the applicant, and such other entities as the lead agency determines appropriate, for completion of any environmental review, permit, or authorization required to carry out the proposed agency action[inserted: in accordance with the deadlines described in subsection (g)];
(2)(E)(E) (E)
if the lead agency determines that [struck: a] review, permit, or authorization will not be completed in accordance with the schedule developed under subparagraph (D), notify the agency responsible for issuing such review, permit, or authorization of the discrepancy and request that such agency take such measures as such agency determines appropriate to comply with such schedule; andif the lead agency determines that [inserted: an] [inserted: environmental ]review, permit, or authorization will not be completed in accordance with the schedule developed under subparagraph (D), notify the agency responsible for issuing such [inserted: environmental ]review, permit, or authorization of the discrepancy and request that such agency take such measures as such agency determines appropriate to comply with such schedule; and
(2)(F)(F) (F)
meet with a cooperating agency that requests such a meeting.meet with a cooperating agency that requests such a meeting.
(3)(3) Cooperating agency(3) Cooperating agency
The lead agency may, with respect to a proposed agency action, designate any Federal, State, Tribal, or local agency that has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposal to serve as a cooperating agency. A cooperating agency may, not later than a date specified in the schedule established by the lead agency, submit comments to the lead agency.The lead agency may, with respect to a proposed agency action, designate any Federal, State, Tribal, or local agency [inserted: (including counties, boroughs, parishes, and other political subdivisions of a State) ]that has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposal to serve as a cooperating agency. A cooperating agency may, not later than a date specified in the schedule established by the lead agency, submit comments to the lead agency.[inserted: Such comments from Federal cooperating agencies shall be limited to matters relating to the proposed agency action with respect to which the Federal cooperating agency has jurisdiction by law.]
(4)(4) Request for designation(4) Request for designation
Any Federal, State, Tribal, or local agency or person that is substantially affected by the lack of a designation of a lead agency with respect to a proposed agency action under paragraph (1) may submit a written request for such a designation to a participating Federal agency. An agency that receives a request under this paragraph shall transmit such request to each participating Federal agency and to the Council.Any Federal, State, Tribal, or local agency or person that is substantially affected by the lack of a designation of a lead agency with respect to a proposed agency action under paragraph (1) may submit a written request for such a designation to a participating Federal agency. An agency that receives a request under this paragraph shall transmit such request to each participating Federal agency and to the Council.
(5)(5) Council designation(5) Council designation

§ 4336a(a)–(e)

(a)(5)(A)–(C) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(5)(D)(D) Designation(D) Designation
Not later than 40 days after the date of the submission of a request under subparagraph (A), the Council shall designate the lead agency with respect to the relevant proposed agency action.Not later than 40 days after the date of the submission of a request under subparagraph (A), the Council shall designate the lead agency with respect to the relevant proposed agency action.
(b)(b) One document(b) One document
(b)(1)(1) [inserted: Document.—]
[inserted: To the extent practicable, if a proposed agency action will require action by more than one Federal agency and the lead agency has determined that it requires preparation of an environmental document, the lead and cooperating agencies shall evaluate the proposal in a single environmental document.]
(b)(2)(2) [inserted: Consideration timing.—]
(b)(2)(A)(A) [inserted: In general.—]
[inserted: In preparing an environmental document for a proposed agency action, no Federal agency shall be required to consider any scientific or technical research that becomes publicly available after the earlier of, as applicable—]
(b)(2)(A)(i)(i) [inserted: ]
[inserted: the date of receipt of an application with respect to such proposed agency action; and]
(b)(2)(A)(ii)(ii) [inserted: ]
[inserted: the date of publication of a notice of intent or decision to prepare such environmental document for such proposed agency action.]
(b)(2)(B)(B) [inserted: Applicability to other law.—]
[inserted: Nothing in this paragraph affects any review of information required under subchapter II of chapter 5 of title 5, United States Code, with respect to comments received during the public comment period as applicable.]
(b)(2)(C)(C) [inserted: Delay.—]
[inserted: A Federal agency may not delay the issuance of an environmental document or a final agency action, including any decision or determination, on the basis of awaiting new scientific or technical research or information that was not available as of the earlier of the dates described in subparagraph (A).]
(b)[struck: To the extent practicable, if a proposed agency action will require action by more than one Federal agency and the lead agency has determined that it requires preparation of an environmental document, the lead and cooperating agencies shall evaluate the proposal in a single environmental document.]
(c)(c) Request for public comment(c) Request for public comment
Each notice of intent to prepare an environmental impact statement under section 4332 of this title shall include a request for public comment on alternatives or impacts and on relevant information, studies, or analyses with respect to the proposed agency action.Each notice of intent to prepare an environmental impact statement under section 4332 of this title shall include a request for public comment on alternatives or impacts and on relevant information, studies, or analyses with respect to the proposed agency action.
(d)(d) Statement of purpose and need(d) Statement of purpose and need
Each environmental document shall include a statement of purpose and need that briefly summarizes the underlying purpose and need for the proposed agency action.Each environmental document shall include a statement of purpose and need that briefly summarizes the underlying purpose and need for the proposed agency action[inserted: , which shall, where applicable, meet the goals of the applicant].
(e)(e) Page limits(e) Page limits
(e)(1)(1) Environmental impact statements(1) Environmental impact statements
(e)(1)(A)(A) In general(A) In general
Except as provided in subparagraph (B), an environmental impact statement shall not exceed 150 pages, not including any citations or appendices.Except as provided in subparagraph (B), an environmental impact statement shall not exceed 150 pages, not including any citations or appendices.

§ 4336a(f)–(h)

(e)(1)(B)–(2) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(f)(f) Sponsor preparation(f) Sponsor preparation
A lead agency shall prescribe procedures to allow a project sponsor to prepare an environmental assessment or an environmental impact statement under the supervision of the agency. Such agency may provide such sponsor with appropriate guidance and assist in the preparation. The lead agency shall independently evaluate the environmental document and shall take responsibility for the contents.A lead agency shall prescribe procedures to allow a project sponsor to prepare an environmental assessment or an environmental impact statement under the supervision of the agency. Such agency may provide such sponsor with appropriate guidance and assist in the preparation. The lead agency shall independently evaluate the environmental document and shall take responsibility for the contents.
(g)(g) Deadlines(g) Deadlines
(g)(1)(1) [inserted: Applications for authorizations.—]
(g)(1)(A)(A) [inserted: Notification of complete or incomplete application.—]
[inserted: Unless a shorter deadline is specified by law, in connection with a proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 60 days after the date on which the applicant submits the application to the agency, the agency shall document receipt of the application and—]
(g)(1)(A)(i)(i) [inserted: ]
[inserted: notify the applicant that the application is complete; or]
(g)(1)(A)(ii)(ii) [inserted: ]
[inserted: notify the applicant that the application is incomplete and request, in writing, any additional information that the agency needs—]
(g)(1)(A)(ii)(I)(I) [inserted: ]
[inserted: to determine that the application is complete; and]
(g)(1)(A)(ii)(II)(II) [inserted: ]
[inserted: to begin preparation of an environmental document.]
(g)(1)(B)(B) [inserted: Agency determination.—]
(g)(1)(B)(i)(i) [inserted: Complete determination.—]
[inserted: If an agency determines that an application is complete under subparagraph (A)(i), the agency shall, not later than 60 days after the date on which the agency makes such determination—]
(g)(1)(B)(i)(I)(I) [inserted: ]
[inserted: notify the applicant that the agency has determined that—]
(g)(1)(B)(i)(I)(aa)(aa) [inserted: ]
[inserted: the proposed agency action is excluded pursuant to 1 of the agency’s categorical exclusions;]
(g)(1)(B)(i)(I)(bb)(bb) [inserted: ]
[inserted: the proposed agency action is not a major Federal action; or]
(g)(1)(B)(i)(I)(cc)(cc) [inserted: ]
[inserted: no further agency action is required;]
(g)(1)(B)(i)(II)(II) [inserted: ]
[inserted: issue a notice of intent to prepare an environmental impact statement for the proposed agency action; or]
(g)(1)(B)(i)(III)(III) [inserted: ]
[inserted: notify the applicant that the agency has determined that preparation of an environmental assessment is necessary.]
(g)(1)(B)(ii)(ii) [inserted: Incomplete determination.—]
[inserted: If an agency requests additional information under subparagraph (A)(ii), the deadline described in clause (i) shall be based on the date on which the agency receives the additional information instead of the date on which the determination is made.]
(g)(2)(2) [inserted: Cooperating agencies.—]
(g)(2)(A)(A) [inserted: In general.—]
[inserted: Not later than 21 days after the date on which a lead agency issues a notice of intent under paragraph (1)(B)(i)(II) or notifies an applicant under paragraph (1)(B)(i)(III) with respect to a proposed agency action, the lead agency shall—]
(g)(2)(A)(i)(i) [inserted: ]
[inserted: identify all agencies that are likely to have environmental review, authorization, or other responsibilities with respect to the proposed agency action; and]
(g)(2)(A)(ii)(ii) [inserted: ]
[inserted: invite each agency to become a cooperating agency.]
(g)(2)(B)(B) [inserted: Deadline to accept invitation.—]
[inserted: Not later than 21 days after the date on which an agency receives an invitation to become a cooperating agency under subparagraph (A)(ii), the agency shall accept or deny the invitation.]
(g)(2)(C)(C) [inserted: Convening of cooperating agencies.—]
[inserted: Not later than 7 days after the deadline described in subparagraph (B) has passed for each agency that received an invitation to become a cooperating agency under subparagraph (A)(ii), the lead agency that sent each invitation shall convene each agency that accepts such an invitation to coordinate on developing the schedule under subsection (a)(2)(D) for the applicable proposed agency action.]
(g)(2)(D)(D) [inserted: Unidentified agencies.—]
[inserted: If an agency that has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposed agency action is not identified under subparagraph (A)(i), the lead agency with respect to the proposed agency action shall—]
(g)(2)(D)(i)(i) [inserted: ]
[inserted: invite such unidentified agency to become a cooperating agency by not later than 7 days after the date on which the lead agency becomes aware that the agency has jurisdiction by law or special expertise; and]
(g)(2)(D)(ii)(ii) [inserted: ]
[inserted: if such agency accepts the invitation, incorporate such agency into the schedule developed under subsection (a)(2)(D) and update such schedule accordingly by not later than 14 days after the date on which the agency accepts the invitation.]
(g)(3)[struck: (1)] [struck: In] [struck: general][inserted: (3)] [inserted: Review] [inserted: timeline]
Except as provided in paragraph ([struck: 2]), with respect to a proposed agency action, a lead agency shall complete, as applicable—Except as provided in paragraph ([inserted: 5]), with respect to a proposed agency action, a lead agency shall complete, as applicable—
(g)(3)(A)(A) (A)
the environmental impact statement not later than the date that is 2 years after the sooner of, as applicable—the environmental impact statement not later than the date that is 2 years after the sooner of, as applicable—
(g)(3)(A)(i)(i) (i)
the date on which such agency determines that section 4332(2)(C) of this title requires the issuance of an environmental impact statement with respect to such action;the date on which such agency determines that section 4332(2)(C) of this title requires the issuance of an environmental impact statement with respect to such action;
(g)(3)(A)(ii)(ii) (ii)
the date on which such agency notifies the applicant that the application to establish a right-of-way for such action is complete; andthe date on which such agency notifies the applicant that the application to establish a right-of-way for such action is complete; and
(g)(3)(A)(iii)(iii) (iii)
the date on which such agency issues a notice of intent to prepare the environmental impact statement for such action; andthe date on which such agency issues a notice of intent to prepare the environmental impact statement for such action; and
(g)(3)(B)(B) (B)
the environmental assessment not later than the date that is 1 year after the sooner of, as applicable—the environmental assessment not later than the date that is 1 year after the sooner of, as applicable—
(g)(3)(B)(i)(i) (i)
the date on which such agency determines that section 4336(b)(2) of this title requires the preparation of an environmental assessment with respect to such action;the date on which such agency determines that section 4336(b)(2) of this title requires the preparation of an environmental assessment with respect to such action;
(g)(3)(B)(ii)(ii) (ii)
the date on which such agency notifies the applicant that the application to establish a right-of-way for such action is complete; andthe date on which such agency notifies the applicant that the application to establish a right-of-way for such action is complete; and
(g)(3)(B)(iii)(iii) (iii)
the date on which such agency issues a notice of intent to prepare the environmental assessment for such action.the date on which such agency issues a notice of intent to prepare the environmental assessment for such action.
(g)(4)(4) [inserted: Deadline for final agency action.—]
(g)(4)(A)(A) [inserted: In general.—]
[inserted: For any proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 30 days after completing an environmental impact statement or an environmental assessment for the proposed agency action, the lead agency, and any cooperating agency, shall issue a final agency action.]
(g)(4)(B)(B) [inserted: Performance schedule.—]
[inserted: The agency issuing the final agency action under subparagraph (A) shall include, in the final agency action, a performance schedule for the completion of any other outstanding authorizations.]
(g)(5)[struck: (2)] Delay[inserted: (5)] Delay
A lead agency that determines it is not able to meet [struck: the] deadline described in [struck: paragraph] [struck: (1)] may extend such [struck: deadline,] [struck: in] [struck: consultation] [struck: with] the applicant, [struck: to] establish a new deadline that provides only so much additional time as is necessary to complete such environmental impact statement or environmental assessment.A lead agency that determines it is not able to meet [inserted: a] deadline described in [inserted: this] [inserted: subsection] may extend such [inserted: deadlineif] [inserted: the] [inserted: applicant] [inserted: approves] [inserted: such extension. If ]the applicant[inserted: approves such extension], [inserted: the] [inserted: lead agency shall ]establish a new deadline that provides only so much additional time as is necessary to complete such environmental impact statement or environmental assessment.
(g)(6)[struck: (3)] Petition to court[inserted: (6)] Petition to court
(g)(6)(A)(A) Right to petition(A) Right to petition
[struck: A] project sponsor may obtain a review of an alleged failure by an agency to act in accordance with an applicable deadline under this section by filing a written petition with a court of competent jurisdiction seeking an order under subparagraph (B).[inserted: Except] [inserted: as provided in subparagraph (C), a ]project sponsor may obtain a review of an alleged failure by an agency to act in accordance with an applicable deadline under this section by filing a written petition with a court of competent jurisdiction seeking an order under subparagraph (B).
(g)(6)(B)(B) Court order(B) Court order
If a court of competent jurisdiction finds that an agency has failed to act in accordance with an applicable deadline, the court shall set a schedule and deadline for the agency to act as soon as practicable, which shall not exceed 90 days from the date on which the order of the court is issued, unless the court determines a longer time period is necessary to comply with applicable law.If a court of competent jurisdiction finds that an agency has failed to act in accordance with an applicable deadline, the court shall set a schedule and deadline for the agency to act as soon as practicable, which shall not exceed 90 days from the date on which the order of the court is issued, unless the court determines a longer time period is necessary to comply with applicable law.
(g)(6)(C)(C) [inserted: Exception.—]
[inserted: A project sponsor that approved an extension of a deadline under paragraph (5) may not obtain judicial review of a failure to act in accordance with such deadline under subparagraph (A) unless the lead agency fails to meet the new deadline or is delaying for reasons other than those necessary to complete its review.]
(g)(7)(7) [inserted: Concurrent review.—]
[inserted: In carrying out an environmental review, the lead agency and each cooperating agency shall carry out the obligations of that agency under other applicable laws concurrently, and in conjunction, with other required reviews for the proposed agency action, pursuant to the requirements of applicable law, including, if applicable, this Act.]
(h)(h) Report(h) Report
(h)(1)(1) In general(1) In general
The head of each lead agency shall annually submit to the Committee on Natural Resources of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that—The head of each lead agency shall annually submit to the Committee on Natural Resources of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that—

Rest of § 4336a unchanged

42 U.S.C. § 4336b Programmatic environmental document

+18 −5Shown
More for 42 U.S.C. § 4336b
Read § 4336bOnly this section
4 changes the bill asks for here, 4 carried out
  1. Carried out:

    in the matter preceding paragraph (1), by striking When an agency prepares and inserting the following:(a) Programmatic environmental documents.— When an agency prepares;'

  2. Carried out:

    in paragraph (1), by striking 5 and inserting 10; and

  3. Carried out:

    in paragraph (2), by striking 5 and inserting 10; and

  4. Carried out:

    by adding at the end the following:(b) Reliance on previously completed environmental reviews.— (1) Actions that are substantially the same.— A lead agency may satisfy the requirements of this Act with respect to a major Federal action by relying on an environmental assessment, environmental impact statement, or …

§ 4336b(a)–(b)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 4336b. Programmatic environmental document§ 4336b. Programmatic environmental document
(a)(a) [inserted: Programmatic environmental documents.—]
[inserted: When an agency prepares a programmatic environmental document for which judicial review was available, the agency may rely on the analysis included in the programmatic environmental document in a subsequent environmental document for related actions as follows:]
[struck: When an agency prepares a programmatic environmental document for which judicial review was available, the agency may rely on the analysis included in the programmatic environmental document in a subsequent environmental document for related actions as follows:]
(a)(1)(1) (1)
Within [struck: 5] years and without additional review of the analysis in the programmatic environmental document, unless there are substantial new circumstances or information about the significance of adverse effects that bear on the analysis.Within [inserted: 10] years and without additional review of the analysis in the programmatic environmental document, unless there are substantial new circumstances or information about the significance of adverse effects that bear on the analysis.
(a)(2)(2) (2)
After [struck: 5] years, so long as the agency reevaluates the analysis in the programmatic environmental document and any underlying assumption to ensure reliance on the analysis remains valid.After [inserted: 10] years, so long as the agency reevaluates the analysis in the programmatic environmental document and any underlying assumption to ensure reliance on the analysis remains valid.
(b)(b) [inserted: Reliance on previously completed environmental reviews.—]
(b)(1)(1) [inserted: Actions that are substantially the same.—]
[inserted: A lead agency may satisfy the requirements of this Act with respect to a major Federal action by relying on an environmental assessment, environmental impact statement, or a categorical exclusion determination that the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency completed for another major Federal action if the lead agency determines that—]
(b)(1)(A)(A) [inserted: ]
[inserted: the new major Federal action is substantially the same as the other major Federal action or, if applicable, an alternative analyzed in such environmental assessment or environmental impact statement; and]
(b)(1)(B)(B) [inserted: ]
[inserted: if applicable, the effects of the new major Federal action are substantially the same as the effects analyzed in such environmental assessment or environmental impact statement.]
(b)(2)(2) [inserted: Actions that are not substantially the same.—]
(b)(2)(A)(A) [inserted: In general.—]
[inserted: If a new major Federal action is not substantially the same as another major Federal action or an alternative analyzed in an environmental assessment or environmental impact statement completed by the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency, the lead agency may modify or augment any such previously completed environmental assessment or environmental impact statement as necessary to satisfy the requirements of this Act with respect to the new major Federal action.]
(b)(2)(B)(B) [inserted: Public availability.—]
[inserted: The lead agency shall make any environmental assessment or environmental impact statement modified under subparagraph (A) publicly available as a new environmental assessment or environmental impact statement.]

42 U.S.C. § 4336c Adoption of categorical exclusions

+3 −3Shown
More for 42 U.S.C. § 4336c
Read § 4336cOnly this section

42 U.S.C. § 4336e Definitions

+52 −3112 of 13 shown
More for 42 U.S.C. § 4336e
Read § 4336eOnly this section

42 U.S.C. § 4344 Duties and functions

+1 −1Shown
More for 42 U.S.C. § 4344
Read § 4344Only this section
Step through the changes