Skip to content
The People's CodeSearch
Menu

Changes to the Code

S. 5048 · Hydropower Licensing Affordability Act ·

Introduced · step 1 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

16 U.S.C. § 811 Operation of navigation facilities; rules and regulations; penalties

+1 −1Shown
More for 16 U.S.C. § 811
Read § 811Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 18 of the Federal Power Act (16 U.S.C. 811) is amended, in the first sentence, by inserting , to reasonably mitigate the direct adverse effect of the applicable project on the population of a species of fish in the applicable river system before the period at the end.

§ 811

§ 811. Operation of navigation facilities; rules and regulations; penalties

The Commission shall require the construction, maintenance, and operation by a licensee at its own expense of such lights and signals as may be directed by the Secretary of the Department in which the Coast Guard is operating, and such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce, as appropriate[inserted: , to reasonably mitigate the direct adverse effect of the applicable project on the population of a species of fish in the applicable river system]. The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such fishways. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission. The operation of any navigation facilities which may be constructed as a part of or in connection with any dam or diversion structure built under the provisions of this chapter, whether at the expense of a licensee hereunder or of the United States, shall at all times be controlled by such reasonable rules and regulations in the interest of navigation, including the control of the level of the pool caused by such dam or diversion structure as may be made from time to time by the Secretary of the Army; and for willful failure to comply with any such rule or regulation such licensee shall be deemed guilty of a misdemeanor, and upon conviction thereof shall be punished as provided in section 825o of this title.

16 U.S.C. § 797 General powers of Commission

Couldn't place the change
More for 16 U.S.C. § 797
Read § 797Only this section

The bill's words for this section

  1. Not carried out:

    Section 4(e) of the Federal Power Act (16 U.S.C. 797(e)) is amended, in the first proviso, by inserting to reasonably mitigate the direct adverse effect of the applicable project on such reservation, so as to provide after deem necessary.

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: in the first proviso, by inserting QTEXT after QTEXT.

Step through the changes