Title 16 · ConservationParks and public lands
Changes to 16 U.S.C. § 2622
S. 5159 · STRONG GRID Act of 2026 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
16 U.S.C. § 2622 Obligations to consider and determine
10 changes the bill asks for here, 5 carried out
- Carried out:
by adding at the end the following:
(9) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated electric utility shall commence consideration under section …
- Carried out:
Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following:
In the case of the standards established by paragraphs (22) and (23) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of those paragraphs.
. - Carried out:
in each of subsections (d) through (h), by redesignating paragraphs (1) through (3) as subparagraphs (A) through (C), respectively, and indenting appropriately;
- Not carried out:
in subsections (e) through (h), by striking
enactment of this subsection
and insertingenactment of that paragraph
;“enactment of this subsection” isn't in § 2622(e) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“enactment of this subsection” not found in /us/usc/t16/s2622/e - Carried out:
in subsection (d), in the matter preceding subparagraph (A) (as so redesignated), by striking Subsections and inserting the following:(1) In general.— Subsections;
- Not carried out:
in subsection (e), by striking the subsection designation and heading and all that follows through Subsections in the matter preceding subparagraph (A) (as so redesignated) and inserting the following:
(2) Time-based metering and communications.— Subsections;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the subsection designation and heading and all that follows through QTEXT in the matter preceding subparagraph (X) (as so redesignated) and inserting the following: QCONTENT; - Not carried out:
in subsection (f), by striking the subsection designation and heading and all that follows through Subsections in the matter preceding subparagraph (A) (as so redesignated) and inserting the following:
(3) Interconnection.— Subsections;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the subsection designation and heading and all that follows through QTEXT in the matter preceding subparagraph (X) (as so redesignated) and inserting the following: QCONTENT; - Not carried out:
in subsection (g), by striking the subsection designation and heading and all that follows through Subsections in the matter preceding subparagraph (A) (as so redesignated) and inserting the following:
(4) Demand-response practices.— Subsections;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the subsection designation and heading and all that follows through QTEXT in the matter preceding subparagraph (X) (as so redesignated) and inserting the following: QCONTENT; - Not carried out:
in subsection (h), by striking the subsection designation and heading and all that follows through Subsections in the matter preceding subparagraph (A) (as so redesignated) and inserting the following:
(5) Electric vehicle charging programs.— Subsections; and
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the subsection designation and heading and all that follows through QTEXT in the matter preceding subparagraph (X) (as so redesignated) and inserting the following: QCONTENT; and - Carried out:
in subsection (d) (as so amended) by adding at the end the following:
(6) Interconnection of microgrids; benefits of investments in resilience.— Subsections (b) and (c) shall not apply to the standard established by paragraph (22) or (23), as applicable, of section 111(d) in the case of any electric utility in a State if, before the date of …
§ 2622(b)–(h)
Start of § 2622 to (b)(8) unchanged ·
(A) Not later than 1 year after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 2621 of this title, or set a hearing date for consideration, with respect to the standard established by paragraph (21) of section 2621(d) of this title.
(B) Not later than 2 years after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 2621 of this title with respect to the standard established by paragraph (21) of section 2621(d) of this title.
(9)
(A) [inserted: Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated electric utility shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standards established by paragraphs (22) and (23) of section 111(d).]
(B) [inserted: Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 111 with respect to the standards established by paragraphs (22) and (23) of section 111(d).]
(c) Failure to comply Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall undertake the consideration, and make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title in the first rate proceeding commenced after the date three years after November 9, 1978, respecting the rates of such utility if such State regulatory authority or nonregulated electric utility has not, before such date, complied with subsection (b)(2) with respect to such standard. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standards established by paragraphs (16) through (19) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to December 19, 2007. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021.[inserted: In the case of the standards established by paragraphs (22) and (23) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of those paragraphs.]
(d) Prior State actions relating to standard under certain paragraphs of section 2621(d)
(1) [inserted: In general.—] [inserted: Subsections (b) and (c) of this section shall not apply to the standards established by paragraphs (11) through (13) and paragraphs (16) through (19) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005—]
[struck: Subsections (b) and (c) of this section shall not apply to the standards established by paragraphs (11) through (13) and paragraphs (16) through (19) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005—]
[struck: (1)] [inserted: (A)] the State has implemented for such utility the standard concerned (or a comparable standard);
[struck: (2)] [inserted: (B)] the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility; or
[struck: (3)] [inserted: (C)] the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility.
(6) [inserted: Interconnection of microgrids; benefits of investments in resilience.—] [inserted: Subsections (b) and (c) shall not apply to the standard established by paragraph (22) or (23), as applicable, of section 111(d) in the case of any electric utility in a State if, before the date of enactment of that paragraph—]
(A) [inserted: the State has implemented for the electric utility the applicable standard (or a comparable standard);]
(B) [inserted: the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the applicable standard (or a comparable standard) for the electric utility; or]
(C) [inserted: the State legislature has voted on the implementation of the applicable standard (or a comparable standard) for the electric utility during the 3-year period ending on that date of enactment.]
(e) Prior State actions relating to standard under section 2621(d)(14) Subsections (b) and (c) of this section shall not apply to the standard established by paragraph (14) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005—
[struck: (1)] [inserted: (A)] the State has implemented for such utility the standard concerned (or a comparable standard);
[struck: (2)] [inserted: (B)] the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility within the previous 3 years; or
[struck: (3)] [inserted: (C)] the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility within the previous 3 years.
(f) Prior State actions relating to standard under section 2621(d)(15) Subsections (b) and (c) of this section shall not apply to the standard established by paragraph (15) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005—
[struck: (1)] [inserted: (A)] the State has implemented for such utility the standard concerned (or a comparable standard);
[struck: (2)] [inserted: (B)] the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility; or
[struck: (3)] [inserted: (C)] the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility.
(g) Prior State actions Subsections (b) and (c) shall not apply to the standard established by paragraph (20) of section 2621(d) of this title in the case of any electric utility in a State if, before November 15, 2021—
[struck: (1)] [inserted: (A)] the State has implemented for the electric utility the standard (or a comparable standard);
[struck: (2)] [inserted: (B)] the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or
[struck: (3)] [inserted: (C)] the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility.
(h) Other prior State actions Subsections (b) and (c) shall not apply to the standard established by paragraph (21) of section 2621(d) of this title in the case of any electric utility in a State if, before November 15, 2021—
[struck: (1)] [inserted: (A)] the State has implemented for the electric utility the standard (or a comparable standard);
[struck: (2)] [inserted: (B)] the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or
[struck: (3)] [inserted: (C)] the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on November 15, 2021.