Changes to the Code
S. 5159 · STRONG GRID Act of 2026 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
16 U.S.C. § 2621 Consideration and determination respecting certain ratemaking standards
1 change the bill asks for here, 1 carried out
- Carried out:
Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:
(22) Interconnection of microgrids.— (A) Definition of microgrid.— In this paragraph, the term “microgrid” means a group of interconnected loads and distributed energy resources (which may include energy generation resources, energy storage, energy efficiency resources, district …
§ 2621(d)Establishment(21)–(23)
Start of § 2621 to (d)(21)(B) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (21)(C) | (C) | (C) | ||
| accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and | accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and | |||
| (21)(D) | (D) | (D) | ||
| appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure. | appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure. | |||
| (22) | (22) [inserted: Interconnection of microgrids.—] | |||
| (22)(A) | (A) [inserted: Definition of microgrid.—] | |||
| [inserted: In this paragraph, the term “microgrid” means a group of interconnected loads and distributed energy resources (which may include energy generation resources, energy storage, energy efficiency resources, district heating and cooling, combined heat and power, demand response and load control tools, and other management, forecasting, and analytical tools) within clearly defined electrical boundaries that—] | ||||
| (22)(A)(i) | (i) [inserted: ] | |||
| [inserted: acts as a single controllable entity with respect to the electric grid; and] | ||||
| (22)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: has the ability—] | ||||
| (22)(A)(ii)(I) | (I) [inserted: ] | |||
| [inserted: to connect to the electric grid;] | ||||
| (22)(A)(ii)(II) | (II) [inserted: ] | |||
| [inserted: to disconnect from the electric grid; or] | ||||
| (22)(A)(ii)(III) | (III) [inserted: ] | |||
| [inserted: to run in parallel to the electric grid, whether connected to or disconnected from the electric grid.] | ||||
| (22)(B) | (B) [inserted: Interconnection.—] | |||
| [inserted: Each State shall consider establishing a regulatory framework for the interconnection of microgrids, which may include revising existing interconnection requirements for distributed energy resources to better account for islanding, resource availability and scheduling, resource protection, and controls.] | ||||
| (23) | (23) [inserted: Quantifying benefits of investments in resilience.—] | |||
| (23)(A) | (A) [inserted: In general.—] | |||
| [inserted: Each State shall consider establishing—] | ||||
| (23)(A)(i) | (i) [inserted: ] | |||
| [inserted: standards for evaluating and quantifying the benefits of investments in the resilience of the electric grid, including—] | ||||
| (23)(A)(i)(I) | (I) [inserted: ] | |||
| [inserted: the events, circumstances, and essential services for which resilience is required;] | ||||
| (23)(A)(i)(II) | (II) [inserted: ] | |||
| [inserted: the level and duration of service required to achieve resilience; and] | ||||
| (23)(A)(i)(III) | (III) [inserted: ] | |||
| [inserted: consideration of—] | ||||
| (23)(A)(i)(III)(aa) | (aa) [inserted: ] | |||
| [inserted: whether critical customers have on-site or behind-the-meter generation capacity; and] | ||||
| (23)(A)(i)(III)(bb) | (bb) [inserted: ] | |||
| [inserted: whether information relating to that capacity has been shared with the applicable utility and relevant regional entities, as necessary; and] | ||||
| (23)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: a valuation methodology to quantify the value of measures to improve the resilience of the electric grid in order to determine whether such investments are justifiable, including a mechanism to determine—] | ||||
| (23)(A)(ii)(I) | (I) [inserted: ] | |||
| [inserted: the distribution of resilience benefits to ratepayers; and] | ||||
| (23)(A)(ii)(II) | (II) [inserted: ] | |||
| [inserted: the scope over which resilience benefits accrue.] | ||||
| (23)(B) | (B) [inserted: Defense installations.—] | |||
| [inserted: Military installations (as defined in section 2801(c) of title 10, United States Code) and other defense installations and infrastructure operated by the Department of Defense shall not be subject to any standards or methodologies established pursuant to subparagraph (A).] | ||||
16 U.S.C. § 2622 Obligations to consider and determine
10 changes the bill asks for here, 5 carried out
- Carried out:
by adding at the end the following:
(9) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated electric utility shall commence consideration under section …
- Carried out:
Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following:
In the case of the standards established by paragraphs (22) and (23) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of those paragraphs.
. - Carried out:
in each of subsections (d) through (h), by redesignating paragraphs (1) through (3) as subparagraphs (A) through (C), respectively, and indenting appropriately;
- Not carried out:
in subsections (e) through (h), by striking
enactment of this subsection
and insertingenactment of that paragraph
;“enactment of this subsection” isn't in § 2622(e) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“enactment of this subsection” not found in /us/usc/t16/s2622/e - Carried out:
in subsection (d), in the matter preceding subparagraph (A) (as so redesignated), by striking Subsections and inserting the following:(1) In general.— Subsections;
- Not carried out:
in subsection (e), by striking the subsection designation and heading and all that follows through Subsections in the matter preceding subparagraph (A) (as so redesignated) and inserting the following:
(2) Time-based metering and communications.— Subsections;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the subsection designation and heading and all that follows through QTEXT in the matter preceding subparagraph (X) (as so redesignated) and inserting the following: QCONTENT; - Not carried out:
in subsection (f), by striking the subsection designation and heading and all that follows through Subsections in the matter preceding subparagraph (A) (as so redesignated) and inserting the following:
(3) Interconnection.— Subsections;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the subsection designation and heading and all that follows through QTEXT in the matter preceding subparagraph (X) (as so redesignated) and inserting the following: QCONTENT; - Not carried out:
in subsection (g), by striking the subsection designation and heading and all that follows through Subsections in the matter preceding subparagraph (A) (as so redesignated) and inserting the following:
(4) Demand-response practices.— Subsections;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the subsection designation and heading and all that follows through QTEXT in the matter preceding subparagraph (X) (as so redesignated) and inserting the following: QCONTENT; - Not carried out:
in subsection (h), by striking the subsection designation and heading and all that follows through Subsections in the matter preceding subparagraph (A) (as so redesignated) and inserting the following:
(5) Electric vehicle charging programs.— Subsections; and
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking the subsection designation and heading and all that follows through QTEXT in the matter preceding subparagraph (X) (as so redesignated) and inserting the following: QCONTENT; and - Carried out:
in subsection (d) (as so amended) by adding at the end the following:
(6) Interconnection of microgrids; benefits of investments in resilience.— Subsections (b) and (c) shall not apply to the standard established by paragraph (22) or (23), as applicable, of section 111(d) in the case of any electric utility in a State if, before the date of …
§ 2622(b)–(h)
Start of § 2622 to (b)(8) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (b)(8)(A) | (A) | (A) | ||
| Not later than 1 year after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 2621 of this title, or set a hearing date for consideration, with respect to the standard established by paragraph (21) of section 2621(d) of this title. | Not later than 1 year after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 2621 of this title, or set a hearing date for consideration, with respect to the standard established by paragraph (21) of section 2621(d) of this title. | |||
| (b)(8)(B) | (B) | (B) | ||
| Not later than 2 years after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 2621 of this title with respect to the standard established by paragraph (21) of section 2621(d) of this title. | Not later than 2 years after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 2621 of this title with respect to the standard established by paragraph (21) of section 2621(d) of this title. | |||
| (b)(9) | (9) [inserted: ] | |||
| (b)(9)(A) | (A) [inserted: ] | |||
| [inserted: Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated electric utility shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standards established by paragraphs (22) and (23) of section 111(d).] | ||||
| (b)(9)(B) | (B) [inserted: ] | |||
| [inserted: Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 111 with respect to the standards established by paragraphs (22) and (23) of section 111(d).] | ||||
| (c) | (c) Failure to comply | (c) Failure to comply | ||
| Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall undertake the consideration, and make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title in the first rate proceeding commenced after the date three years after November 9, 1978, respecting the rates of such utility if such State regulatory authority or nonregulated electric utility has not, before such date, complied with subsection (b)(2) with respect to such standard. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standards established by paragraphs (16) through (19) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to December 19, 2007. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021. | Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall undertake the consideration, and make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title in the first rate proceeding commenced after the date three years after November 9, 1978, respecting the rates of such utility if such State regulatory authority or nonregulated electric utility has not, before such date, complied with subsection (b)(2) with respect to such standard. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standards established by paragraphs (16) through (19) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to December 19, 2007. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021.[inserted: In the case of the standards established by paragraphs (22) and (23) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of those paragraphs.] | |||
| (d) | (d) Prior State actions relating to standard under certain paragraphs of section 2621(d) | (d) Prior State actions relating to standard under certain paragraphs of section 2621(d) | ||
| (d)(1) | (1) [inserted: In general.—] | |||
| [inserted: Subsections (b) and (c) of this section shall not apply to the standards established by paragraphs (11) through (13) and paragraphs (16) through (19) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005—] | ||||
| (d) | ||||
| (d)(1)(A) | [inserted: (A)] | |||
| the State has implemented for such utility the standard concerned (or a comparable standard); | the State has implemented for such utility the standard concerned (or a comparable standard); | |||
| (d)(1)(B) | [inserted: (B)] | |||
| the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility; or | the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility; or | |||
| (d)(1)(C) | [inserted: (C)] | |||
| the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility. | the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility. | |||
| (d)(6) | (6) [inserted: Interconnection of microgrids; benefits of investments in resilience.—] | |||
| [inserted: Subsections (b) and (c) shall not apply to the standard established by paragraph (22) or (23), as applicable, of section 111(d) in the case of any electric utility in a State if, before the date of enactment of that paragraph—] | ||||
| (d)(6)(A) | (A) [inserted: ] | |||
| [inserted: the State has implemented for the electric utility the applicable standard (or a comparable standard);] | ||||
| (d)(6)(B) | (B) [inserted: ] | |||
| [inserted: the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the applicable standard (or a comparable standard) for the electric utility; or] | ||||
| (d)(6)(C) | (C) [inserted: ] | |||
| [inserted: the State legislature has voted on the implementation of the applicable standard (or a comparable standard) for the electric utility during the 3-year period ending on that date of enactment.] | ||||
| (e) | (e) Prior State actions relating to standard under section 2621(d)(14) | (e) Prior State actions relating to standard under section 2621(d)(14) | ||
| Subsections (b) and (c) of this section shall not apply to the standard established by paragraph (14) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005— | Subsections (b) and (c) of this section shall not apply to the standard established by paragraph (14) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005— | |||
| (e)(A) | [inserted: (A)] | |||
| the State has implemented for such utility the standard concerned (or a comparable standard); | the State has implemented for such utility the standard concerned (or a comparable standard); | |||
| (e)(B) | [inserted: (B)] | |||
| the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility within the previous 3 years; or | the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility within the previous 3 years; or | |||
| (e)(C) | [inserted: (C)] | |||
| the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility within the previous 3 years. | the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility within the previous 3 years. | |||
| (f) | (f) Prior State actions relating to standard under section 2621(d)(15) | (f) Prior State actions relating to standard under section 2621(d)(15) | ||
| Subsections (b) and (c) of this section shall not apply to the standard established by paragraph (15) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005— | Subsections (b) and (c) of this section shall not apply to the standard established by paragraph (15) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005— | |||
| (f)(A) | [inserted: (A)] | |||
| the State has implemented for such utility the standard concerned (or a comparable standard); | the State has implemented for such utility the standard concerned (or a comparable standard); | |||
| (f)(B) | [inserted: (B)] | |||
| the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility; or | the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility; or | |||
| (f)(C) | [inserted: (C)] | |||
| the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility. | the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility. | |||
| (g) | (g) Prior State actions | (g) Prior State actions | ||
| Subsections (b) and (c) shall not apply to the standard established by paragraph (20) of section 2621(d) of this title in the case of any electric utility in a State if, before November 15, 2021— | Subsections (b) and (c) shall not apply to the standard established by paragraph (20) of section 2621(d) of this title in the case of any electric utility in a State if, before November 15, 2021— | |||
| (g)(A) | [inserted: (A)] | |||
| the State has implemented for the electric utility the standard (or a comparable standard); | the State has implemented for the electric utility the standard (or a comparable standard); | |||
| (g)(B) | [inserted: (B)] | |||
| the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or | the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or | |||
| (g)(C) | [inserted: (C)] | |||
| the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility. | the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility. | |||
| (h) | (h) Other prior State actions | (h) Other prior State actions | ||
| Subsections (b) and (c) shall not apply to the standard established by paragraph (21) of section 2621(d) of this title in the case of any electric utility in a State if, before November 15, 2021— | Subsections (b) and (c) shall not apply to the standard established by paragraph (21) of section 2621(d) of this title in the case of any electric utility in a State if, before November 15, 2021— | |||
| (h)(A) | [inserted: (A)] | |||
| the State has implemented for the electric utility the standard (or a comparable standard); | the State has implemented for the electric utility the standard (or a comparable standard); | |||
| (h)(B) | [inserted: (B)] | |||
| the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or | the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or | |||
| (h)(C) | [inserted: (C)] | |||
| the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on November 15, 2021. | the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on November 15, 2021. | |||
16 U.S.C. § 2634 Prior and pending proceedings
1 change the bill asks for here, 1 carried out
- Carried out:
Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by adding at the end the following:
In the case of the standards established by paragraphs (22) and (23) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of those paragraphs.
.
§ 2634
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 2634. Prior and pending proceedings | § 2634. Prior and pending proceedings | |||
| For purposes of subchapters I and II, and this subchapter, proceedings commenced by State regulatory authorities (with respect to electric utilities for which it has ratemaking authority) and nonregulated electric utilities before November 9, 1978, and actions taken before such date in such proceedings shall be treated as complying with the requirements of subchapters I and II, and this subchapter if such proceedings and actions substantially conform to such requirements. For purposes of subchapters I and II, and this subchapter, any such proceeding or action commenced before November 9, 1978, but not completed before such date, shall comply with the requirements of subchapters I and II, and this subchapter, to the maximum extent practicable, with respect to so much of such proceeding or action as takes place after such date, except as otherwise provided in section 2631(c) of this title. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of each standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. | For purposes of subchapters I and II, and this subchapter, proceedings commenced by State regulatory authorities (with respect to electric utilities for which it has ratemaking authority) and nonregulated electric utilities before November 9, 1978, and actions taken before such date in such proceedings shall be treated as complying with the requirements of subchapters I and II, and this subchapter if such proceedings and actions substantially conform to such requirements. For purposes of subchapters I and II, and this subchapter, any such proceeding or action commenced before November 9, 1978, but not completed before such date, shall comply with the requirements of subchapters I and II, and this subchapter, to the maximum extent practicable, with respect to so much of such proceeding or action as takes place after such date, except as otherwise provided in section 2631(c) of this title. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of each standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021.[inserted: In the case of the standards established by paragraphs (22) and (23) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of those paragraphs.] |
42 U.S.C. § 6322 State energy conservation plans
2 changes the bill asks for here, 2 carried out
- Carried out:
in subsection (c)(7)(B), by inserting
, including microgrids (as defined in section 367(a))
before the semicolon at the end;
and - Carried out:
in subsection (d)(10), by inserting
, such as distributed energy resources and virtual power plants
before the semicolon at the end.
§ 6322(c)(7)the mandatory conduct of activities to support transmission and distribution planning, including—(A)–(D)
Start of § 6322 to (c)(7) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (A) | (A) | (A) | ||
| support for local governments and Indian Tribes; | support for local governments and Indian Tribes; | |||
| (B) | (B) | (B) | ||
| feasibility studies for transmission line routes and alternatives; | feasibility studies for transmission line routes and alternatives[inserted: , including microgrids (as defined in section 367(a))]; | |||
| (C) | (C) | (C) | ||
| preparation of necessary project design and permits; and | preparation of necessary project design and permits; and | |||
| (D) | (D) | (D) | ||
| outreach to affected stakeholders. | outreach to affected stakeholders. |
§ 6322(d)Optional features of plans(9)–(12)
(d) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (9) | (9) | (9) | ||
| programs to identify unfair or deceptive acts or practices which relate to the implementation of energy efficiency measures and renewable resource energy measures and to educate consumers concerning such acts or practices; | programs to identify unfair or deceptive acts or practices which relate to the implementation of energy efficiency measures and renewable resource energy measures and to educate consumers concerning such acts or practices; | |||
| (10) | (10) | (10) | ||
| programs to modify patterns of energy consumption so as to reduce peak demands for energy and improve the efficiency of energy supply systems, including electricity supply systems; | programs to modify patterns of energy consumption so as to reduce peak demands for energy and improve the efficiency of energy supply systems, including electricity supply systems[inserted: , such as distributed energy resources and virtual power plants]; | |||
| (11) | (11) | (11) | ||
| programs to promote energy efficiency as an integral component of economic development planning conducted by State, local, or other governmental entities or by energy utilities; | programs to promote energy efficiency as an integral component of economic development planning conducted by State, local, or other governmental entities or by energy utilities; | |||
| (12) | (12) | (12) | ||
| in accordance with subsection (f)(2), programs to implement the Energy Technology Commercialization Services Program; | in accordance with subsection (f)(2), programs to implement the Energy Technology Commercialization Services Program; |
Rest of § 6322 unchanged