Title 33 · Navigation and Navigable Waters
Changes to 33 U.S.C. § 891b
S. 524 · Coast Guard Authorization Act of 2025 · Engrossed The official text as one chamber (House or Senate) passed it.
Passed the Senate · step 3 of 5
33 U.S.C. § 891b Fleet replacement and modernization Plan
13 changes the bill asks for here, 6 carried out
- Carried out:
in subsection (a), by striking
Secretary
and all that follows and insertingSecretary, acting through the Assistant Administrator of NOAA for Marine and Aviation Operations, shall develop and submit to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Natural Resources and the Committee on Science, Space, and Technology of the House of Representatives a replacement and modernization plan for the NOAA fleet not later than 180 days after the date of the enactment of the Coast Guard Authorization Act of 2025, and every 2 years thereafter.
; - Not carried out:
by striking subsections (b) and (d);
The bill points to subsection (d) of § 891b, which isn't there in the Code as we have it. It was there before, as of Public Law 119-1: the law has changed since the bill was written.
Technical detail
no subsection (d) in /us/usc/t33/s891b - Carried out:
by redesignating subsection (c) as subsection (b);
The section already has a provision under this letter or number, so it would have two.
- Not carried out:
in paragraph (1), by striking
proposed
and all that follows and inserting the following:in operation in the NOAA fleet as of the date of submission of the Plan, a description of the status of those vessels, and a statement of the planned and anticipated service life of those vessels;
;“proposed” isn't in § 891b(b)(1) in the Code as we have it. It was there before, as of Public Law 119-1: the law has changed since the bill was written.
Technical detail
“proposed” not found in /us/usc/t33/s891b/b/1 - Carried out:
by striking paragraph (6);
- Carried out:
by redesignating paragraphs (2), (3), (4), and (5) as paragraphs (4), (5), (6), and (7), respectively;
The section already has a provision under this letter or number, so it would have two.
- Carried out:
by inserting after paragraph (1) the following:
(2) a plan with respect to operation, maintenance, and replacement of vessels described in paragraph (1), including the schedule for maintenance or replacement and anticipated funding requirements; (3) the number of vessels proposed to be constructed by NOAA;;
- Not carried out:
in paragraph (4), as so redesignated, by striking
constructed, leased, or chartered
and insertingacquired, leased, or chartered by NOAA
;“constructed, leased, or chartered” isn't in § 891b(b)(4) in the Code as we have it. It was there before, as of Public Law 119-1: the law has changed since the bill was written.
Technical detail
“constructed, leased, or chartered” not found in /us/usc/t33/s891b/b/4 - Not carried out:
by striking
or any other federal official
and insertingthe Director of the National Science Foundation, or any other Federal official
; and“or any other federal official” isn't in § 891b(b)(6) in the Code as we have it. It was there before, as of Public Law 119-1: the law has changed since the bill was written.
Technical detail
“or any other federal official” not found in /us/usc/t33/s891b/b/6 - Not carried out:
by striking
their availability
and insertingthe availability of those vessels
;“their availability” isn't in § 891b(b)(6) in the Code as we have it. It was there before, as of Public Law 119-1: the law has changed since the bill was written.
Technical detail
“their availability” not found in /us/usc/t33/s891b/b/6 - Not carried out:
in paragraph (7), as so redesignated, by striking
; and
and inserting a semicolon;
and“; and” isn't in § 891b(b)(7) in the Code as we have it. It was there before, as of Public Law 119-1: the law has changed since the bill was written.
Technical detail
“; and” not found in /us/usc/t33/s891b/b/7~2 - Not carried out:
by adding at the end the following:
(8) a plan for using small vessels, uncrewed systems, and partnerships to augment the requirements of NOAA for days at sea; (9) the number of officers of the NOAA commissioned officer corps and professional wage mariners needed to operate and maintain the NOAA fleet, including …
The law already reads this way: § 891b(b)(8) is already as the bill would have it.
Technical detail
already there: /us/usc/t33/s891b/b/8 reads as the bill would have it - Carried out:
by adding at the end the following:
(c) Vessel procurement approval.— The National Oceanic and Atmospheric Administration may not procure vessels that are more than 65 feet in length without the approval of the Assistant Administrator of NOAA for Marine and Aviation Operations.;
This bill puts a provision under a letter or number this section already uses, so the section would have two. The law has probably changed since the bill was written.
1 of the 13 changes this bill asks for here is already in the law as it stands, and was not made a second time. The bill, or another making the same changes, has probably become law since.
6 of the 13 changes this bill asks for here name words or provisions the section had before but doesn't now: the law has changed since the bill was written, so they are not marked.
§ 891b(a)–(c)
§ 891b. Fleet replacement and modernization Plan
(a) In general To carry out the program authorized in section 891a of this title, the Secretary, acting through the Assistant Administrator of NOAA for Marine and Aviation Operations, shall develop and submit to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Natural Resources and the Committee on Science, Space, and Technology of the House of Representatives a replacement and modernization plan for the NOAA fleet not later than 180 days after [struck: December][inserted: the] [struck: 18,][inserted: date] [inserted: of the enactment of the Coast Guard Authorization Act of ]2025, and every 2 years thereafter.
(b) Plan elements The Plan required in subsection (a) shall include the following—
(1) the number of vessels in operation in the NOAA fleet as of the date of submission of the Plan, a description of the status of those vessels, and a statement of the planned and anticipated service life of those vessels;
(2) [inserted: a plan with respect to operation, maintenance, and replacement of vessels described in paragraph (1), including the schedule for maintenance or replacement and anticipated funding requirements;]
(3) [inserted: the number of vessels proposed to be constructed by NOAA;]
[struck: (2)] [inserted: (4)] a plan with respect to operation, maintenance, and replacement of vessels described in paragraph (1), including the schedule for maintenance or replacement and anticipated funding requirements;
[struck: (3)] [inserted: (5)] the number of vessels proposed to be constructed by NOAA;
[struck: (4)] [inserted: (6)] the number of vessels proposed to be acquired, leased, or chartered by NOAA;
[struck: (5)] [inserted: (7)] the number of vessels, or days at sea, that can be obtained by using the vessels of the UNOLS;
[struck: (6)] [struck: the number of vessels that will be made available to NOAA by the Secretary of the Navy, the Director of the National Science Foundation, or any other Federal official, and the terms and conditions for the availability of those vessels;]
(7) the proposed acquisition of modern scientific instrumentation for the NOAA fleet, including acoustic systems, data transmission positioning and communication systems, physical, chemical, and meteorological oceanographic systems, and data acquisition and processing systems;
(8) a plan for using small vessels, uncrewed systems, and partnerships to augment the requirements of NOAA for days at sea;
(9) the number of officers of the NOAA commissioned officer corps and professional wage mariners needed to operate and maintain the NOAA fleet, including the vessels identified under paragraph (3); and
(10) current and potential challenges with meeting the requirements under paragraph (9) and proposed solutions to those challenges.
[struck: (c)] [inserted: (b)] Vessel procurement approval The National Oceanic and Atmospheric Administration may not procure vessels that are more than 65 feet in length without the approval of the Assistant Administrator of NOAA for Marine and Aviation Operations.
(c) [inserted: Vessel procurement approval.—] [inserted: The National Oceanic and Atmospheric Administration may not procure vessels that are more than 65 feet in length without the approval of the Assistant Administrator of NOAA for Marine and Aviation Operations.]