Skip to content
The People's CodeSearch
Menu

Changes to the Code

S. 5368 · Water Cyber Shield Act of 2026 ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

6 U.S.C. § 681 Definitions

+10 −2Shown
More for 6 U.S.C. § 681
Read § 681Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    in section 2240 (6 U.S.C. 681), by striking paragraph (4) and inserting the following:(4) Covered entity.— The term “covered entity”— (A) means an entity in a critical infrastructure sector, as defined in Presidential Policy Directive 21, that satisfies the definition established by the Director in the final rule issued pursuant to section 2242(b); and (B) …

§ 681(2)–(5)

Start of § 681 to (1) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(2)(2) Council(2) Council
The term “Council” means the Cyber Incident Reporting Council described in section 681f of this title.The term “Council” means the Cyber Incident Reporting Council described in section 681f of this title.
(3)(3) Covered cyber incident(3) Covered cyber incident
The term “covered cyber incident” means a substantial cyber incident experienced by a covered entity that satisfies the definition and criteria established by the Director in the final rule issued pursuant to section 681b(b) of this title.The term “covered cyber incident” means a substantial cyber incident experienced by a covered entity that satisfies the definition and criteria established by the Director in the final rule issued pursuant to section 681b(b) of this title.
(4)(4) Covered entity(4) Covered entity[inserted: .—]
[inserted: The term “covered entity”—]
(4)(A)(A) [inserted: ]
[inserted: means an entity in a critical infrastructure sector, as defined in Presidential Policy Directive 21, that satisfies the definition established by the Director in the final rule issued pursuant to section 2242(b); and]
(4)(B)(B) [inserted: ]
[inserted: includes—]
(4)(B)(i)(i) [inserted: ]
[inserted: a community water system (as defined in section 1401 of the Safe Drinking Water Act (42 U.S.C. 300f)) that serves a population of greater than 3,300 persons; and]
(4)(B)(ii)(ii) [inserted: ]
[inserted: a covered treatment works (as defined in section 228(a) of the Federal Water Pollution Control Act).]
(4)[struck: The term “covered entity” means an entity in a critical infrastructure sector, as defined in Presidential Policy Directive 21, that satisfies the definition established by the Director in the final rule issued pursuant to section 681b(b) of this title.]
(5)(5) Cyber incident(5) Cyber incident
The term “cyber incident”—The term “cyber incident”—
(5)(A)(A) (A)
has the meaning given the term “incident” in section 6591 of this title; andhas the meaning given the term “incident” in section 6591 of this title; and

Rest of § 681 unchanged

6 U.S.C. § 681b Required reporting of certain cyber incidents

+2 −0Shown
More for 6 U.S.C. § 681b
Read § 681bOnly this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    in section 2242(a) (6 U.S.C. 681b(a)), by adding at the end the following:(8) Transmission to EPA.— The Agency shall submit to the Administrator of the Environmental Protection Agency a copy of each report submitted to the Agency under paragraph (1), (2), or (3).; and

§ 681b(a)–(b)

Start of § 681b to (a)(5)(C) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(6)(6) Manner, timing, and form of reports(6) Manner, timing, and form of reports
Reports made under paragraphs (1), (2), and (3) shall be made in the manner and form, and within the time period in the case of reports made under paragraph (3), prescribed in the final rule issued pursuant to subsection (b).Reports made under paragraphs (1), (2), and (3) shall be made in the manner and form, and within the time period in the case of reports made under paragraph (3), prescribed in the final rule issued pursuant to subsection (b).
(a)(7)(7) Effective date(7) Effective date
Paragraphs (1) through (4) shall take effect on the dates prescribed in the final rule issued pursuant to subsection (b).Paragraphs (1) through (4) shall take effect on the dates prescribed in the final rule issued pursuant to subsection (b).
(a)(8)(8) [inserted: Transmission to EPA.—]
[inserted: The Agency shall submit to the Administrator of the Environmental Protection Agency a copy of each report submitted to the Agency under paragraph (1), (2), or (3).]
(b)(b) Rulemaking(b) Rulemaking
(b)(1)(1) Notice of proposed rulemaking(1) Notice of proposed rulemaking
Not later than 24 months after March 15, 2022, the Director, in consultation with Sector Risk Management Agencies, the Department of Justice, and other Federal agencies, shall publish in the Federal Register a notice of proposed rulemaking to implement subsection (a).Not later than 24 months after March 15, 2022, the Director, in consultation with Sector Risk Management Agencies, the Department of Justice, and other Federal agencies, shall publish in the Federal Register a notice of proposed rulemaking to implement subsection (a).

Rest of § 681b unchanged

6 U.S.C. § 681d Noncompliance with required reporting

+4 −1Shown
More for 6 U.S.C. § 681d
Read § 681dOnly this section
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    by striking This section and inserting the following:(1) In general.— Except as provided in paragraph (2), this section; and

  2. Carried out:

    by adding at the end the following:(2) Exception.— This section shall apply to a State, local, Tribal, or territorial government entity that is required to submit a report under section 2242(a) with respect to a community water system or covered treatment works, as defined in clauses (i) and (ii), respectively, …

§ 681d(e)–(g)

Start of § 681d to (e)(1) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(e)(2)(2) (2)
prior interaction with the Agency or awareness of the covered entity of the policies and procedures of the Agency for reporting covered cyber incidents and ransom payments.prior interaction with the Agency or awareness of the covered entity of the policies and procedures of the Agency for reporting covered cyber incidents and ransom payments.
(f)(f) Exclusions(f) Exclusions
(f)(1)(1) [inserted: In general.—]
[inserted: Except as provided in paragraph (2), this section shall not apply to a State, local, Tribal, or territorial government entity.]
(f)(2)(2) [inserted: Exception.—]
[inserted: This section shall apply to a State, local, Tribal, or territorial government entity that is required to submit a report under section 2242(a) with respect to a community water system or covered treatment works, as defined in clauses (i) and (ii), respectively, of section 2240(4)(B), that is owned or operated by the State, local, Tribal or territorial government entity.]
(f)[struck: This section shall not apply to a State, local, Tribal, or territorial government entity.]
(g)(g) Report to Congress(g) Report to Congress
The Director shall submit to Congress an annual report on the number of times the Director—The Director shall submit to Congress an annual report on the number of times the Director—
(g)(1)(1) (1)
issued an initial request for information pursuant to subsection (b);issued an initial request for information pursuant to subsection (b);

Rest of § 681d unchanged

33 U.S.C. § 1318 Records and reports; inspections

+1 −11 of 2 shown
More for 33 U.S.C. § 1318
Read § 1318Only this section
2 changes the bill asks for here, 1 carried out
  1. Carried out:

    by striking or (4) carrying and inserting (4) carrying; and

  2. Not carried out:

    by striking 504 of this Act— and inserting 504; or (5) carrying out requirements under section 229—.

    “504 of this Act—” isn't in § 1318(a) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“504 of this Act—” not found in /us/usc/t33/s1318/a

§ 1318(a)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 1318. Records and reports; inspections§ 1318. Records and reports; inspections
(a)(a) Maintenance; monitoring equipment; entry; access to information(a) Maintenance; monitoring equipment; entry; access to information
Whenever required to carry out the objective of this chapter, including but not limited to (1) developing or assisting in the development of any effluent limitation, or other limitation, prohibition, or effluent standard, pretreatment standard, or standard of performance under this chapter; (2) determining whether any person is in violation of any such effluent limitation, or other limitation, prohibition or effluent standard, pretreatment standard, or standard of performance; (3) any requirement established under this section; [struck: or ](4) carrying out sections 1315, 1321, 1342, 1344 (relating to State permit programs), 1345, and 1364 of this title—Whenever required to carry out the objective of this chapter, including but not limited to (1) developing or assisting in the development of any effluent limitation, or other limitation, prohibition, or effluent standard, pretreatment standard, or standard of performance under this chapter; (2) determining whether any person is in violation of any such effluent limitation, or other limitation, prohibition or effluent standard, pretreatment standard, or standard of performance; (3) any requirement established under this section; (4) carrying out sections 1315, 1321, 1342, 1344 (relating to State permit programs), 1345, and 1364 of this title—
(a)(A)(A) (A)
the Administrator shall require the owner or operator of any point source to (i) establish and maintain such records, (ii) make such reports, (iii) install, use, and maintain such monitoring equipment or methods (including where appropriate, biological monitoring methods), (iv) sample such effluents (in accordance with such methods, at such locations, at such intervals, and in such manner as the Administrator shall prescribe), and (v) provide such other information as he may reasonably require; andthe Administrator shall require the owner or operator of any point source to (i) establish and maintain such records, (ii) make such reports, (iii) install, use, and maintain such monitoring equipment or methods (including where appropriate, biological monitoring methods), (iv) sample such effluents (in accordance with such methods, at such locations, at such intervals, and in such manner as the Administrator shall prescribe), and (v) provide such other information as he may reasonably require; and
(a)(B)(B) (B)
the Administrator or his authorized representative (including an authorized contractor acting as a representative of the Administrator), upon presentation of his credentials—the Administrator or his authorized representative (including an authorized contractor acting as a representative of the Administrator), upon presentation of his credentials—

Rest of § 1318 unchanged

42 U.S.C. § 300i–2 Community water system risk and resilience

+78 −5211 of 16 shown
More for 42 U.S.C. § 300i–2
Read § 300i–2Only this section
16 changes the bill asks for here, 11 carried out
  1. Carried out:

    in clause (ii), by striking storage and distribution facilities, electronic, computer, or other automated systems (including the security of such systems) which and inserting and storage and distribution facilities that;

  2. Carried out:

    in clause (v), by striking and at the end; and

  3. Carried out:

    by adding at the end the following:(vii) using a method approved by the applicable State, the risks to electronic, computer, or other automated systems for the purpose of identifying significant cybersecurity risks that have the potential to cause the impacts described in subparagraph (A) or (B) of paragraph (2); and; and

  4. Carried out:

    by striking paragraphs (3) through (5) and inserting the following:(3) Review and revision.— (A) In general.— Each community water system described in paragraph (1) shall, not less frequently than once every 5 years, review and, if necessary, revise the assessment. (B) Certification to the Administrator or State.— On completion of the review …

  5. Carried out:

    by redesignating paragraphs (1) through (4) as subparagraphs (A) through (D), and indenting appropriately;

  6. Not carried out:

    in the matter preceding subparagraph (A) (as so redesignated), by striking Each community water system in the first sentence and all that follows through The emergency response plan in the third sentence and inserting the following:(1) In general.— Each community water system serving a population greater than 3,300 shall prepare an emergency response plan that incorporates findings of the assessment conducted under subsection (a) for that community water system (or any revisions to that assessment). (2) …

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: striking QTEXT in the first sentence and all that follows through QTEXT in the third sentence and inserting the following: QCONTENT;
  7. Not carried out:

    in subparagraph (A) (as so redesignated), by striking and cybersecurity;

    The bill points to paragraph (2) of § 300i–2(b), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no paragraph (2) in /us/usc/t42/s300i–2/b
  8. Not carried out:

    in subparagraph (C) (as so redesignated), by striking and at the end;

    The bill points to paragraph (2) of § 300i–2(b), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no paragraph (2) in /us/usc/t42/s300i–2/b
  9. Not carried out:

    in subparagraph (D) (as so redesignated), by striking the period at the end and inserting ; and; and

    The bill points to paragraph (2) of § 300i–2(b), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no paragraph (2) in /us/usc/t42/s300i–2/b
  10. Not carried out:

    by adding at the end the following:(E) countermeasures that the system intends to adopt or, if already in use, maintain to mitigate the significant cybersecurity risks identified under subsection (a)(1)(A)(vii), including a schedule the system intends to follow to adopt any countermeasures not already in use by the system.; and

    The bill points to paragraph (2) of § 300i–2(b), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no paragraph (2) in /us/usc/t42/s300i–2/b
  11. Carried out:

    by adding at the end the following:(3) Review; revision.— A community water system serving a population greater than 3,300 shall review and, as necessary, revise the emergency response plan prepared under this subsection not less frequently than once every 5 years.;

  12. Carried out:

    by striking subsection (f);

  13. Carried out:

    by redesignating subsections (c), (d), and (e) as subsections (d), (e), and (f), respectively;

  14. Carried out:

    by inserting after subsection (b) the following:(c) Submission and approval of assessments and plans.— (1) Submission.— (A) In general.— Each community water system subject to subsections (a) and (b) shall, during a cybersecurity assessment pursuant to section 1433A(b)(1)(A), provide to the applicable State— (i) the portion …

  15. Carried out:

    in subsection (e) (as so redesignated), by striking a certification of such assessment or plan is submitted to the Administrator and inserting an assessment or plan is submitted to the applicable State,; and

  16. Carried out:

    by striking subsection (h) and inserting the following:(h) Definitions.— In this section: (1) Natural hazard.— The term “natural hazard” means a natural event that threatens the functioning of a community water system, including an earthquake, tornado, flood, hurricane, wildfire, and hydrologic changes. (2) Resilience.— The term …

§ 300i–2(a)–(g)

Start of § 300i–2 to (a)(1)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(1)(A)(i)(i) (i)
the risk to the system from malevolent acts and natural hazards;the risk to the system from malevolent acts and natural hazards;
(a)(1)(A)(ii)(ii) (ii)
the resilience of the pipes and constructed conveyances, physical barriers, source water, water collection and intake, pretreatment, treatment, storage and distribution facilities[struck: ,] [struck: electronic,] [struck: computer, or other automated systems (including the security of such systems) which ]are utilized by the system;the resilience of the pipes and constructed conveyances, physical barriers, source water, water collection and intake, pretreatment, treatment, [inserted: and ]storage and distribution facilities [inserted: that] are utilized by the system;
(a)(1)(A)(iii)(iii) (iii)
the monitoring practices of the system;the monitoring practices of the system;
(a)(1)(A)(iv)(iv) (iv)
the financial infrastructure of the system;the financial infrastructure of the system;
(a)(1)(A)(v)(v) (v)
the use, storage, or handling of various chemicals by the system;[struck: and]the use, storage, or handling of various chemicals by the system;
(a)(1)(A)(vi)(vi) (vi)
the operation and maintenance of the system; andthe operation and maintenance of the system; and
(a)(1)(A)(vii)(vii) [inserted: ]
[inserted: using a method approved by the applicable State, the risks to electronic, computer, or other automated systems for the purpose of identifying significant cybersecurity risks that have the potential to cause the impacts described in subparagraph (A) or (B) of paragraph (2); and]
(a)(1)(B)(B) (B)
may include an evaluation of capital and operational needs for risk and resilience management for the system.may include an evaluation of capital and operational needs for risk and resilience management for the system.
(a)(2)(2) Baseline information(2) Baseline information
The Administrator, not later than August 1, 2019, after consultation with appropriate departments and agencies of the Federal Government and with State and local governments, shall provide baseline information on malevolent acts of relevance to community water systems, which shall include consideration of acts that may—The Administrator, not later than August 1, 2019, after consultation with appropriate departments and agencies of the Federal Government and with State and local governments, shall provide baseline information on malevolent acts of relevance to community water systems, which shall include consideration of acts that may—
(a)(2)(A)(A) (A)
substantially disrupt the ability of the system to provide a safe and reliable supply of drinking water; orsubstantially disrupt the ability of the system to provide a safe and reliable supply of drinking water; or
(a)(2)(B)(B) (B)
otherwise present significant public health or economic concerns to the community served by the system.otherwise present significant public health or economic concerns to the community served by the system.
(a)(3)(3) [struck: Certification](3) [inserted: Review and revision.—]
(a)(3)(A)(A) [struck: Certification](A) [inserted: In general.—]
[inserted: Each community water system described in paragraph (1) shall, not less frequently than once every 5 years, review and, if necessary, revise the assessment.]
[struck: Each community water system described in paragraph (1) shall submit to the Administrator a certification that the system has conducted an assessment complying with paragraph (1). Such certification shall be made prior to—]
(a)(3)(A)(i)(i) [struck: ]
[struck: March 31, 2020, in the case of systems serving a population of 100,000 or more;]
(a)(3)(A)(ii)(ii) [struck: ]
[struck: December 31, 2020, in the case of systems serving a population of 50,000 or more but less than 100,000; and]
(a)(3)(A)(iii)(iii) [struck: ]
[struck: June 30, 2021, in the case of systems serving a population greater than 3,300 but less than 50,000.]
(a)(3)(B)(B) [struck: Review] [struck: and] [struck: revision](B) [inserted: Certification] [inserted: to] [inserted: the Administrator or State.—]
[struck: Each] [struck: community] [struck: water system described in paragraph (1) shall review the assessment ]of [struck: such system conducted under such paragraph at least once every 5 years after ]the [struck: applicable] [struck: deadline for submission of its certification ]under subparagraph (A) [struck: to determine whether such assessment should be revised. Upon completion of such ]a [struck: review, the ]community water system shall submit to the [struck: Administrator] a certification that the system has reviewed [struck: its assessment ]and, if applicable, revised [struck: such] assessment.[inserted: On] [inserted: completion] of the [inserted: review] under subparagraph (A)[inserted: ,] a community water system [inserted: described in paragraph (1) ]shall submit to the [inserted: applicable] [inserted: State ]a certification that the [inserted: community water ]system has reviewed and, if applicable, revised [inserted: the] assessment.
(a)(4)(4) [struck: Contents of certifications]
[struck: A certification required under paragraph (3) shall contain only—]
(a)(4)(A)(A) [struck: ]
[struck: information that identifies the community water system submitting the certification;]
(a)(4)(B)(B) [struck: ]
[struck: the date of the certification; and]
(a)(4)(C)(C) [struck: ]
[struck: a statement that the community water system has conducted, reviewed, or revised the assessment, as applicable.]
(a)(5)(5) [struck: Provision to other entities]
[struck: No community water system shall be required under State or local law to provide an assessment described in this section (or revision thereof) to any State, regional, or local governmental entity solely by reason of the requirement set forth in paragraph (3) that the system submit a certification to the Administrator.]
(b)(b) Emergency response plan(b) Emergency response plan
Each community water system serving a population greater than 3,300 shall prepare or revise, where necessary, an emergency response plan that incorporates findings of the assessment conducted under subsection (a) for such system (and any revisions thereto). Each community water system shall certify to the Administrator, as soon as reasonably possible after October 23, 2018, but not later than 6 months after completion of the assessment under subsection (a), that the system has completed such plan. The emergency response plan shall include—Each community water system serving a population greater than 3,300 shall prepare or revise, where necessary, an emergency response plan that incorporates findings of the assessment conducted under subsection (a) for such system (and any revisions thereto). Each community water system shall certify to the Administrator, as soon as reasonably possible after October 23, 2018, but not later than 6 months after completion of the assessment under subsection (a), that the system has completed such plan. The emergency response plan shall include—
(b)(A)[struck: (1)] [inserted: (A)]
strategies and resources to improve the resilience of the system, including the physical security and cybersecurity of the system;strategies and resources to improve the resilience of the system, including the physical security and cybersecurity of the system;
(b)(B)[struck: (2)] [inserted: (B)]
plans and procedures that can be implemented, and identification of equipment that can be utilized, in the event of a malevolent act or natural hazard that threatens the ability of the community water system to deliver safe drinking water;plans and procedures that can be implemented, and identification of equipment that can be utilized, in the event of a malevolent act or natural hazard that threatens the ability of the community water system to deliver safe drinking water;
(b)(C)[struck: (3)] [inserted: (C)]
actions, procedures, and equipment which can obviate or significantly lessen the impact of a malevolent act or natural hazard on the public health and the safety and supply of drinking water provided to communities and individuals, including the development of alternative source water options, relocation of water intakes, and construction of flood protection barriers; andactions, procedures, and equipment which can obviate or significantly lessen the impact of a malevolent act or natural hazard on the public health and the safety and supply of drinking water provided to communities and individuals, including the development of alternative source water options, relocation of water intakes, and construction of flood protection barriers; and
(b)(D)[struck: (4)] [inserted: (D)]
strategies that can be used to aid in the detection of malevolent acts or natural hazards that threaten the security or resilience of the system.strategies that can be used to aid in the detection of malevolent acts or natural hazards that threaten the security or resilience of the system.
(b)(3)(3) [inserted: Review; revision.—]
[inserted: A community water system serving a population greater than 3,300 shall review and, as necessary, revise the emergency response plan prepared under this subsection not less frequently than once every 5 years.]
(c)(c) [inserted: Submission and approval of assessments and plans.—]
(c)(1)(1) [inserted: Submission.—]
(c)(1)(A)(A) [inserted: In general.—]
[inserted: Each community water system subject to subsections (a) and (b) shall, during a cybersecurity assessment pursuant to section 1433A(b)(1)(A), provide to the applicable State—]
(c)(1)(A)(i)(i) [inserted: ]
[inserted: the portion of the assessment prepared under subsection (a) that is described in paragraph (1)(A)(vii) of that subsection (including any revision to that portion of the assessment); and]
(c)(1)(A)(ii)(ii) [inserted: ]
[inserted: the portion of the emergency response plan prepared under subsection (b) that is described in paragraph (2)(E) of that subsection (including any revision to that portion of the emergency response plan).]
(c)(1)(B)(B) [inserted: Limitation.—]
[inserted: Neither the Administrator nor a State may require the submission of any portion of an assessment under subsection (a) or an emergency response plan under subsection (b) that is not described in subparagraph (A).]
(c)(2)(2) [inserted: Review; approval.—]
(c)(2)(A)(A) [inserted: In general.—]
[inserted: A State shall—]
(c)(2)(A)(i)(i) [inserted: ]
[inserted: review the portions of the assessments and emergency response plans of community water systems submitted pursuant to paragraph (1)(A) for conformity with the requirements of this section and section 1433A; and]
(c)(2)(A)(ii)(ii) [inserted: ]
(c)(2)(A)(ii)(I)(I) [inserted: ]
[inserted: approve of the portions of an assessment and emergency response plan submitted pursuant to paragraph (1)(A); or]
(c)(2)(A)(ii)(II)(II) [inserted: ]
[inserted: disapprove of the portions of an assessment and emergency response plan submitted pursuant to paragraph (1)(A) if the Administrator or State, as applicable, determines that—]
(c)(2)(A)(ii)(II)(aa)(aa) [inserted: ]
[inserted: the submitted portions of the assessment or emergency response plan are missing, incomplete, or fail to conform with the requirements of this section or section 1433A; or]
(c)(2)(A)(ii)(II)(bb)(bb) [inserted: ]
[inserted: the submitted portions of the assessment or emergency response plan fail to provide for cybersecurity resilience in accordance with the baseline cybersecurity standards established by the Administrator under section 1433A(c).]
(c)(2)(B)(B) [inserted: Enforcement.—]
[inserted: A State may use appropriate enforcement mechanisms under this title or the appropriate State authority to remedy noncompliance, as described in items (aa) and (bb) of subparagraph (A)(ii)(II), under this subsection.]
(c)(3)(3) [inserted: Submitted documentation.—]
(c)(3)(A)(A) [inserted: Applicability of FOIA.—]
[inserted: Any information submitted under this subsection shall be exempt from disclosure under section 552(b)(3) of title 5, United States Code (commonly known as the “Freedom of Information Act”), and any provision of State, Tribal, or local freedom of information law, open government law, open meetings law, open records law, sunshine law, or similar law requiring disclosure of information or records.]
(c)(3)(B)(B) [inserted: Treatment of documentation.—]
(c)(3)(B)(i)(i) [inserted: Protocol development.—]
[inserted: Not later than 180 days after the date of enactment of the Water Cyber Shield Act of 2026 and before any cybersecurity assessments are carried out pursuant to section 1433A(b)(1)(A), the Administrator, in consultation with appropriate Federal law enforcement and intelligence officials, shall develop such protocols as are necessary to protect any information provided under paragraph (1)(A) to the State.]
(c)(3)(B)(ii)(ii) [inserted: Requirements for protocol.—]
[inserted: The protocol developed under clause (i) shall ensure that—]
(c)(3)(B)(ii)(I)(I) [inserted: ]
[inserted: each copy of the portions of an assessment and emergency response plan submitted pursuant to paragraph (1)(A) are kept in a secure location;]
(c)(3)(B)(ii)(II)(II) [inserted: ]
[inserted: only individuals designated by the applicable State may have access to copies of the portions of the assessment and emergency response plan submitted pursuant to paragraph (1)(A); and]
(c)(3)(B)(ii)(III)(III) [inserted: ]
[inserted: no copy of the portions of the assessment and emergency response plan submitted pursuant to paragraph (1)(A) shall be made available to anyone other than an individual designated by the applicable State.]
(c)(3)(B)(iii)(iii) [inserted: Savings provision.—]
[inserted: Nothing in this subparagraph authorizes any person to withhold any information from Congress or from a committee or subcommittee of Congress.]
(d)[struck: (c)] Coordination[inserted: (d)] Coordination
Community water systems shall, to the extent possible, coordinate with existing local emergency planning committees established pursuant to the Emergency Planning and Community Right-To-Know Act of 1986 (42 U.S.C. 11001 et seq.) when preparing or revising an assessment or emergency response plan under this section.Community water systems shall, to the extent possible, coordinate with existing local emergency planning committees established pursuant to the Emergency Planning and Community Right-To-Know Act of 1986 (42 U.S.C. 11001 et seq.) when preparing or revising an assessment or emergency response plan under this section.
(e)[struck: (d)] Record maintenance[inserted: (e)] Record maintenance
Each community water system shall maintain a copy of the assessment conducted under subsection (a) and the emergency response plan prepared under subsection (b) (including any revised assessment or plan) for 5 years after the date on which [struck: a] [struck: certification of such ]assessment or plan is submitted to the [struck: Administrator] under this section.Each community water system shall maintain a copy of the assessment conducted under subsection (a) and the emergency response plan prepared under subsection (b) (including any revised assessment or plan) for 5 years after the date on which [inserted: an] assessment or plan is submitted to the [inserted: applicable] [inserted: State, ]under this section.
(f)[struck: (e)] Guidance to small public water systems[inserted: (f)] Guidance to small public water systems
The Administrator shall provide guidance and technical assistance to community water systems serving a population of less than 3,300 persons on how to conduct resilience assessments, prepare emergency response plans, and address threats from malevolent acts and natural hazards that threaten to disrupt the provision of safe drinking water or significantly affect the public health or significantly affect the safety or supply of drinking water provided to communities and individuals.The Administrator shall provide guidance and technical assistance to community water systems serving a population of less than 3,300 persons on how to conduct resilience assessments, prepare emergency response plans, and address threats from malevolent acts and natural hazards that threaten to disrupt the provision of safe drinking water or significantly affect the public health or significantly affect the safety or supply of drinking water provided to communities and individuals.
(f) [struck: Alternative preparedness and operational resilience programs]
(f)(1)(1) [struck: Satisfaction of requirement]
[struck: A community water system that is required to comply with the requirements of subsections (a) and (b) may satisfy such requirements by—]
(f)(1)(A)(A) [struck: ]
[struck: using and complying with technical standards that the Administrator has recognized under paragraph (2); and]
(f)(1)(B)(B) [struck: ]
[struck: submitting to the Administrator a certification that the community water system is complying with subparagraph (A).]
(f)(2)(2) [struck: Authority to recognize]
[struck: Consistent with section 12(d) of the National Technology Transfer and Advancement Act of 1995, the Administrator shall recognize technical standards that are developed or adopted by third-party organizations or voluntary consensus standards bodies that carry out the objectives or activities required by this section as a means of satisfying the requirements under subsection (a) or (b).]
(g)(g) Technical assistance and grants(g) Technical assistance and grants
(g)(1)(1) In general(1) In general
The Administrator shall establish and implement a program, to be known as the Drinking Water Infrastructure Risk and Resilience Program, under which the Administrator may award grants in each of fiscal years 2020 and 2021 to owners or operators of community water systems for the purpose of increasing the resilience of such community water systems.The Administrator shall establish and implement a program, to be known as the Drinking Water Infrastructure Risk and Resilience Program, under which the Administrator may award grants in each of fiscal years 2020 and 2021 to owners or operators of community water systems for the purpose of increasing the resilience of such community water systems.

§ 300i–2(g)–(h)

(g)(2)–(4) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(g)(5)(5) Grants for small systems(5) Grants for small systems
For each fiscal year, the Administrator may use not more than $10,000,000 from the funds made available to carry out this subsection to make grants to community water systems serving a population of less than 3,300 persons, or nonprofit organizations receiving assistance under section 300j–1(e) of this title, for activities and projects undertaken in accordance with the guidance provided to such systems under subsection (e) of this section.For each fiscal year, the Administrator may use not more than $10,000,000 from the funds made available to carry out this subsection to make grants to community water systems serving a population of less than 3,300 persons, or nonprofit organizations receiving assistance under section 300j–1(e) of this title, for activities and projects undertaken in accordance with the guidance provided to such systems under subsection (e) of this section.
(g)(6)(6) Authorization of appropriations(6) Authorization of appropriations
To carry out this subsection, there are authorized to be appropriated $25,000,000 for each of fiscal years 2020 and 2021.To carry out this subsection, there are authorized to be appropriated $25,000,000 for each of fiscal years 2020 and 2021.
(h)(h) Definitions(h) Definitions[inserted: .—]
In this section[struck: —]In this section[inserted: :]
(h)(1)(1) (1) [inserted: Natural hazard.—]
[struck: the] term “[struck: resilience]” means [struck: the ability of ]a [struck: community] [struck: water] [struck: system] [struck: or] [struck: an] [struck: asset] of a community water system [struck: to] [struck: adapt] [struck: to] [struck: or] [struck: withstand] [struck: the effects of a malevolent act or natural hazard without interruption to the asset’s or system’s function], [struck: or if the function is interrupted], [struck: to] [struck: rapidly] [struck: return to a normal operating condition; and][inserted: The] term “[inserted: natural hazard]” means a [inserted: natural] [inserted: event] [inserted: that] [inserted: threatens] [inserted: the] [inserted: functioning] of a community water system[inserted: ,] [inserted: including] [inserted: an] [inserted: earthquake,] [inserted: tornado,] [inserted: flood,] [inserted: hurricane], [inserted: wildfire], [inserted: and] [inserted: hydrologic] [inserted: changes.]
(h)(2)(2) (2) [inserted: Resilience.—]
[struck: the] term “[struck: natural hazard]” means a [struck: natural] [struck: event] [struck: that] [struck: threatens] [struck: the] [struck: functioning] of a community water system[struck: ,] [struck: including] [struck: an] [struck: earthquake,] [struck: tornado,] [struck: flood,] [struck: hurricane], [struck: wildfire], [struck: and] [struck: hydrologic] [struck: changes].[inserted: The] term “[inserted: resilience]” means [inserted: the ability of ]a [inserted: community] [inserted: water] [inserted: system] [inserted: or] [inserted: an] [inserted: asset] of a community water system [inserted: to] [inserted: adapt] [inserted: to] [inserted: or] [inserted: withstand] [inserted: the effects of a malevolent act or natural hazard without interruption to the asset's or system's function], [inserted: or if the function is interrupted], [inserted: to] [inserted: rapidly] [inserted: return to a normal operating condition].
(h)(3)(3) [inserted: State.—]
(h)(3)(A)(A) [inserted: In general.—]
[inserted: The term “State” means a State that has assumed primary enforcement responsibility pursuant to section 1433A(e).]
(h)(3)(B)(B) [inserted: Enforcement by the Administrator.—]
[inserted: If a State has not assumed primary enforcement responsibility pursuant to section 1433A(e), the term “State” shall, for purposes of obligations of the State under this subsection, be considered to be a reference to the Administrator.]

42 U.S.C. § 300j–4 Records and inspections

+1 −1Shown
More for 42 U.S.C. § 300j–4
Read § 300j–4Only this section
3 changes the bill asks for here, 3 carried out
  1. Carried out:

    by striking or (C) any and inserting (C) any;

  2. Carried out:

    by inserting or (D) a requirement to undergo an inspection under section 1433A(a)(2)(D), after subsection (a),; and

  3. Carried out:

    by striking or (C), is and inserting (C), or (D), is.

§ 300j–4(a)–(c)

Start of § 300j–4 to (a)(2)(G) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(2)(H)(H) Authorization of appropriations.—(H) Authorization of appropriations.—
There are authorized to be appropriated to carry out this paragraph $10,000,000 for each of the fiscal years 2019 through 2021.There are authorized to be appropriated to carry out this paragraph $10,000,000 for each of the fiscal years 2019 through 2021.
(b)(b) Entry of establishments, facilities, or other property; inspections; conduct of certain tests; audit and examination of records; entry restrictions; prohibition against informing of a proposed entry(b) Entry of establishments, facilities, or other property; inspections; conduct of certain tests; audit and examination of records; entry restrictions; prohibition against informing of a proposed entry
(b)(1)(1) (1)
Except as provided in paragraph (2), the Administrator, or representatives of the Administrator duly designated by him, upon presenting appropriate credentials and a written notice to any supplier of water or other person subject to (A) a national primary drinking water regulation prescribed under section 300g–1 of this title, (B) an applicable underground injection control program, [struck: or ](C) any requirement to monitor an unregulated contaminant pursuant to subsection (a), or person in charge of any of the property of such supplier or other person referred to in clause (A), (B), or ([struck: C]), is authorized to enter any establishment, facility, or other property of such supplier or other person in order to determine whether such supplier or other person has acted or is acting in compliance with this subchapter, including for this purpose, inspection, at reasonable times, of records, files, papers, processes, controls, and facilities, or in order to test any feature of a public water system, including its raw water source. The Administrator or the Comptroller General (or any representative designated by either) shall have access for the purpose of audit and examination to any rec­ords, reports, or information of a grantee which are required to be maintained under subsection (a) or which are pertinent to any financial assistance under this subchapter.Except as provided in paragraph (2), the Administrator, or representatives of the Administrator duly designated by him, upon presenting appropriate credentials and a written notice to any supplier of water or other person subject to (A) a national primary drinking water regulation prescribed under section 300g–1 of this title, (B) an applicable underground injection control program, (C) any requirement to monitor an unregulated contaminant pursuant to subsection (a), or [inserted: (D) a requirement to undergo an inspection under section 1433A(a)(2)(D), or ]person in charge of any of the property of such supplier or other person referred to in clause (A), (B), [inserted: (C), ]or ([inserted: D]), is authorized to enter any establishment, facility, or other property of such supplier or other person in order to determine whether such supplier or other person has acted or is acting in compliance with this subchapter, including for this purpose, inspection, at reasonable times, of records, files, papers, processes, controls, and facilities, or in order to test any feature of a public water system, including its raw water source. The Administrator or the Comptroller General (or any representative designated by either) shall have access for the purpose of audit and examination to any rec­ords, reports, or information of a grantee which are required to be maintained under subsection (a) or which are pertinent to any financial assistance under this subchapter.
(b)(2)(2) (2)
No entry may be made under the first sentence of paragraph (1) in an establishment, facility, or other property of a supplier of water or other person subject to a national primary drinking water regulation if the establishment, facility, or other property is located in a State which has primary enforcement responsibility for public water systems unless, before written notice of such entry is made, the Administrator (or his representative) notifies the State agency charged with responsibility for safe drinking water of the reasons for such entry. The Administrator shall, upon a showing by the State agency that such an entry will be detrimental to the administration of the State’s program of primary enforcement responsibility, take such showing into consideration in determining whether to make such entry. No State agency which receives notice under this paragraph of an entry proposed to be made under paragraph (1) may use the information contained in the notice to inform the person whose property is proposed to be entered of the proposed entry; and if a State agency so uses such information, notice to the agency under this paragraph is not required until such time as the Administrator determines the agency has provided him satisfactory assurances that it will no longer so use information contained in a notice under this paragraph.No entry may be made under the first sentence of paragraph (1) in an establishment, facility, or other property of a supplier of water or other person subject to a national primary drinking water regulation if the establishment, facility, or other property is located in a State which has primary enforcement responsibility for public water systems unless, before written notice of such entry is made, the Administrator (or his representative) notifies the State agency charged with responsibility for safe drinking water of the reasons for such entry. The Administrator shall, upon a showing by the State agency that such an entry will be detrimental to the administration of the State’s program of primary enforcement responsibility, take such showing into consideration in determining whether to make such entry. No State agency which receives notice under this paragraph of an entry proposed to be made under paragraph (1) may use the information contained in the notice to inform the person whose property is proposed to be entered of the proposed entry; and if a State agency so uses such information, notice to the agency under this paragraph is not required until such time as the Administrator determines the agency has provided him satisfactory assurances that it will no longer so use information contained in a notice under this paragraph.
(c)(c) Penalty(c) Penalty
Whoever fails or refuses to comply with any requirement of subsection (a) or to allow the Administrator, the Comptroller General, or representatives of either, to enter and conduct any audit or inspection authorized by subsection (b) shall be subject to a civil penalty of not to exceed $25,000.Whoever fails or refuses to comply with any requirement of subsection (a) or to allow the Administrator, the Comptroller General, or representatives of either, to enter and conduct any audit or inspection authorized by subsection (b) shall be subject to a civil penalty of not to exceed $25,000.

Rest of § 300j–4 unchanged

33 U.S.C. § 1319 Enforcement

Couldn't place 2 changes
More for 33 U.S.C. § 1319
Read § 1319Only this section

The bill's words for this section

  1. Not carried out:

    Section 309 of the Federal Water Pollution Control Act (33 U.S.C. 1319) is amended in each of subsections (a), (c), (d), and (g) by inserting 228(d), before 301, each place it appears.

    “301,” isn't in § 1319(a) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“301,” not found in /us/usc/t33/s1319/a
  2. Not carried out:

    Section 309 of the Federal Water Pollution Control Act (33 U.S.C. 1319) (as amended by section 201(b)) is amended in each of subsections (a), (c), (d), and (g) by inserting 229, before 301, each place it appears.

    “301,” isn't in § 1319(a) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“301,” not found in /us/usc/t33/s1319/a

42 U.S.C. § 300g–2 State primary enforcement responsibility

Couldn't place the change
More for 42 U.S.C. § 300g–2
Read § 300g–2Only this section

The bill's words for this section

  1. Not carried out:

    Section 1413(a) of the Safe Drinking Water Act (42 U.S.C. 300g–2(a)) is amended, in the matter preceding paragraph (1), by inserting (except for sections 1433 and 1433A) after this title.

    “this title” isn't in § 300g–2(a) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“this title” not found in /us/usc/t42/s300g–2/a

42 U.S.C. § 300g–3 Enforcement of drinking water regulations

Couldn't place the change
More for 42 U.S.C. § 300g–3
Read § 300g–3Only this section

The bill's words for this section

  1. Not carried out:

    Section 1414(i)(1) of the Safe Drinking Water Act (42 U.S.C. 300g–3(i)(1)) is amended by inserting 1433A, after 1433,.

    “1433,” isn't in § 300g–3(i)(1) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“1433,” not found in /us/usc/t42/s300g–3/i/1

Step through the changes