15 U.S.C. § 717f Construction, extension, or abandonment of facilities

+27 −0Shown
More for 15 U.S.C. § 717f
Read § 717f
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 7 of the Natural Gas Act (15 U.S.C. 717f) is amended by adding at the end the following:(i) Covered pipeline activities.— (1) Definitions.— In this subsection: (A) Covered activity.— The term “covered activity” means any repair, maintenance, replacement, upgrade, rebuilding, modification, optimization, minor relocation, looping, compression, capacity-enhancement …

§ 717f(g)–(i)

Start of § 717f to (f)(2) unchanged ·

(g) Certificate of public convenience and necessity for service of area already being served Nothing contained in this section shall be construed as a limitation upon the power of the Commission to grant certificates of public convenience and necessity for service of an area already being served by another natural-gas company.

(h) Right of eminent domain for construction of pipelines, etc. When any holder of a certificate of public convenience and necessity cannot acquire by contract, or is unable to agree with the owner of property to the compensation to be paid for, the necessary right-of-way to construct, operate, and maintain a pipe line or pipe lines for the transportation of natural gas, and the necessary land or other property, in addition to right-of-way, for the location of compressor stations, pressure apparatus, or other stations or equipment necessary to the proper operation of such pipe line or pipe lines, it may acquire the same by the exercise of the right of eminent domain in the district court of the United States for the district in which such property may be located, or in the State courts. The practice and procedure in any action or proceeding for that purpose in the district court of the United States shall conform as nearly as may be with the practice and procedure in similar action or proceeding in the courts of the State where the property is situated: Provided, That the United States district courts shall only have jurisdiction of cases when the amount claimed by the owner of the property to be condemned exceeds $3,000.

(i) [inserted: Covered pipeline activities.—]

(1) [inserted: Definitions.—] [inserted: In this subsection:]

(A) [inserted: Covered activity.—] [inserted: The term “covered activity” means any repair, maintenance, replacement, upgrade, rebuilding, modification, optimization, minor relocation, looping, compression, capacity-enhancement project, or addition to a covered facility.]

(B) [inserted: Covered area.—] [inserted: The term “covered area” means—]

(i) [inserted: an existing right-of-way; and]

(ii) [inserted: the footprint of original construction previously authorized and environmentally reviewed under this Act, together with any minimum additional area adjacent to an existing right-of-way that is necessary to complete a covered activity.]

(C) [inserted: Covered facility.—] [inserted: The term “covered facility” means an existing interstate natural gas pipeline or associated infrastructure, including a compressor station, meter station, regulator station, valve site, launcher, receiver, storage-related facility, or similar facility located within a covered area.]

(2) [inserted: Environmental review.—] [inserted: A covered activity and any Federal agency action authorizing that covered activity—]

(A) [inserted: shall not be considered a major Federal action under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) if the covered activity remains within a covered area; and]

(B) [inserted: shall not be considered an undertaking for purposes of section 306108 of title 54, United States Code, if the covered activity remains within a covered area.]

(3) [inserted: Rule of construction.—] [inserted: Nothing in this subsection affects the applicability of any requirement under—]

(A) [inserted: the Federal Water Pollution Control Act (33 U.S.C. 1251 et seq.) (commonly known as the “Clean Water Act”);]

(B) [inserted: the Clean Air Act (42 U.S.C. 7401 et seq.); or]

(C) [inserted: any other applicable Federal law not expressly addressed by this subsection.]