Federal Power Act § 228 Ratepayer protection for data center and high-density computing load New section
1 change the bill asks for here, 1 carried out
- Carried out:
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as amended by section 2105) is amended by adding at the end the following:228. Ratepayer protection for data center and high-density computing load (a) Definitions.— In this section: (1) Commission.— The term
Commission
means the Federal Energy Regulatory Commission. (2) Covered load.— The termcovered load
means electric load that— (A) is attributable to 1 or more data centers or high-density computing facilities located at a single site, or at multiple sites under common ownership or control; and (B) equals or exceeds 20 megawatts or, in the case of data centers or high-density computing facilities developed in phases, is reasonably expected to equal or exceed 20 megawatts at full buildout. (3) Data center or high-density computing facility.— (A) In general.— The termdata center or high-density computing facility
means a facility, or group of co-located facilities, the primary purpose of which is to house computing, networking, or data storage equipment used to process, store, or transmit digital data, including equipment used for— (i) artificial intelligence training or inference; (ii) cloud computing or data hosting; or (iii) cryptocurrency mining or other distributed-ledger or digital-asset computation. (B) Exclusion.— The termdata center or other high-density computing facility
does not include computing or data storage equipment that is ancillary to a facility the primary purpose of which is a commercial or industrial activity other than an activity described in subparagraph (A). (4) Embedded average cost.— The termembedded average cost
means the average cost of service reflected in the rates otherwise in effect for the customer class that would apply to the applicable covered load. (5) Incremental cost.— The termincremental cost
means the cost that would be avoided had a specific covered load not been served by the electric utility, including all costs to construct, own, and operate power generation or storage resources and electric transmission and distribution services associated with serving the covered load, based on costs estimated by the electric utility at or around the time that the covered load becomes operational and subject to approval by the Commission or a State, as appropriate. (6) State.— The termState
includes the applicable State commission and any other State authority having jurisdiction over retail electric service. (7) Transmission service category.— The termtransmission service category
means a class of transmission service provided under a tariff on file with the Commission, including— (A) network integration transmission service; (B) point-to-point transmission service; and (C) any interim, non-firm, contract demand, or other service that limits— (i) the quantity of energy a load may withdraw from the transmission system; or (ii) the conditions under which the load may withdraw energy from the transmission system. (b) Ratepayer protection floor.— (1) No subsidy of covered load.— No portion of the incremental cost may be allocated to, or recovered in the rates of, any customer other than a covered load, subject to the limitations described in subsection (e). (2) Surplus permitted.— Paragraph (1) does not limit the authority of the Commission or a State under subsection (c) to recover from covered loads amounts in excess of incremental cost and to credit those amounts to other customers as a rebate or a reduction to the utility costs that are used as a basis for the calculation of customer rates. (3) Continuing recovery on exit.— A rate, charge, or agreement for service to a covered load shall be designed to recover from the covered load the full incremental cost of the electric utility, and such recovery shall continue notwithstanding the termination by the covered load of a contract or other agreement pertaining to the sale of electric energy, or the cessation by the covered load of the purchase of electric energy, before that incremental cost has been fully recovered. (4) Financial assurance.— Before constructing, or making an upgrade to, a generation, transmission, or distribution facility necessary to serve a covered load, an electric utility shall require the covered load to provide financial assurances or contributions sufficient to cover the cost of the facility or upgrade, subject to the condition that any financial assurances or contributions provided by the applicable covered load to a public utility or Transmission Organization for the same facility or upgrade shall be credited against the requirement of this paragraph. (c) State authority To hold open seasons and set covered-Load rates.— (1) In general.— Notwithstanding any other provision of this Act or any rule or order of the Commission, and consistent with subsection (b)(3), a State may, with respect to retail electric service to covered loads— (A) establish rates, charges, or contract terms that recover more than the embedded average cost, and more than the incremental cost, of serving a covered load; (B) require that revenue collected from a covered load in excess of incremental cost be credited or applied to reduce the rates of other retail customers; (C) in effectuating the policy described in this subsection, use an open season or competitive solicitation to allocate among covered loads the opportunity to obtain and contract for retail electric service, making awards in such manner as returns the greatest benefit to other ratepayers on a present value basis, notwithstanding the order in which applications or requests for service are received from covered loads or any other basis for making such awards, subject to the condition that each award under such an open season or competitive solicitation shall specify the maximum quantity of firm demand awarded, in megawatts, and the transmission service category on the basis of which the covered load is to be served; (D) condition the provision of retail electric service to a covered load on the procurement, construction, or contracting by the covered load for new generation resources sufficient to serve the demand of the covered load; and (E) condition the provision of retail electric service to a covered load on the covered load taking, or agreeing to take, a transmission service category that limits— (i) the quantity of energy the covered load may withdraw from the transmission system; or (ii) the conditions under which the covered load may withdraw energy from the transmission system. (2) Priority of State competitive solicitations.— (A) Broad discretion.— For purposes of an open solicitation, a State shall, with respect to retail electric service to a covered load, be afforded broad discretion to conduct, to authorize an electric utility to conduct, or to require an electric utility to conduct, a competitive solicitation or open season to allocate the opportunity to interconnect, or to obtain service for, a covered load. (B) Electric utility filing.— An electric utility may file to conduct a solicitation or open season described in subparagraph (A). (C) Authority to require.— A State may require an electric utility to conduct an open season described in subparagraph (A). (d) Protection of American industry.— A State may treat covered loads as a separate class of service, and may establish rates, charges, terms, conditions, and interconnection or service priorities for covered loads that differ from, and that are less favorable than, those applicable to other large industrial, manufacturing, or commercial loads. (e) Rules of construction.— (1) State and Federal authority.— Except as expressly provided in subsection (c), nothing in this section expands or diminishes the jurisdiction of the Commission or of any State, including State authority over retail electric service, rate design, and resource planning. (2) Recognition of reserved State authority.— (A) In general.— The authority described in subsection (c)(1) is an attribute of the reserved authority of the States over retail electric service. (B) Clarification.— This section— (i) recognizes and confirms the authority described in subparagraph (A); and (ii) is not the source of that authority. (f) Applicability.— (1) Prospective application.— Subsections (b) and (c) apply to a covered load that interconnects on or after the date of enactment of this section. (2) Existing arrangements.— An arrangement to serve a covered load that was approved by the Commission or by a State before the date of enactment of this section shall remain in effect..
§ 228(a)–(f)
| Where | Mark | Text |
|---|---|---|
| § 228. [inserted: Ratepayer protection for data center and high-density computing load] | ||
| (a) | (a) [inserted: Definitions.—] | |
| [inserted: In this section:] | ||
| (a)(1) | (1) [inserted: Commission.—] | |
| [inserted: The term “Commission” means the Federal Energy Regulatory Commission.] | ||
| (a)(2) | (2) [inserted: Covered load.—] | |
| [inserted: The term “covered load” means electric load that—] | ||
| (a)(2)(A) | (A) [inserted: ] | |
| [inserted: is attributable to 1 or more data centers or high-density computing facilities located at a single site, or at multiple sites under common ownership or control; and] | ||
| (a)(2)(B) | (B) [inserted: ] | |
| [inserted: equals or exceeds 20 megawatts or, in the case of data centers or high-density computing facilities developed in phases, is reasonably expected to equal or exceed 20 megawatts at full buildout.] | ||
| (a)(3) | (3) [inserted: Data center or high-density computing facility.—] | |
| (a)(3)(A) | (A) [inserted: In general.—] | |
| [inserted: The term “data center or high-density computing facility” means a facility, or group of co-located facilities, the primary purpose of which is to house computing, networking, or data storage equipment used to process, store, or transmit digital data, including equipment used for—] | ||
| (a)(3)(A)(i) | (i) [inserted: ] | |
| [inserted: artificial intelligence training or inference;] | ||
| (a)(3)(A)(ii) | (ii) [inserted: ] | |
| [inserted: cloud computing or data hosting; or] | ||
| (a)(3)(A)(iii) | (iii) [inserted: ] | |
| [inserted: cryptocurrency mining or other distributed-ledger or digital-asset computation.] | ||
| (a)(3)(B) | (B) [inserted: Exclusion.—] | |
| [inserted: The term “data center or other high-density computing facility” does not include computing or data storage equipment that is ancillary to a facility the primary purpose of which is a commercial or industrial activity other than an activity described in subparagraph (A).] | ||
| (a)(4) | (4) [inserted: Embedded average cost.—] | |
| [inserted: The term “embedded average cost” means the average cost of service reflected in the rates otherwise in effect for the customer class that would apply to the applicable covered load.] | ||
| (a)(5) | (5) [inserted: Incremental cost.—] | |
| [inserted: The term “incremental cost” means the cost that would be avoided had a specific covered load not been served by the electric utility, including all costs to construct, own, and operate power generation or storage resources and electric transmission and distribution services associated with serving the covered load, based on costs estimated by the electric utility at or around the time that the covered load becomes operational and subject to approval by the Commission or a State, as appropriate.] | ||
| (a)(6) | (6) [inserted: State.—] | |
| [inserted: The term “State” includes the applicable State commission and any other State authority having jurisdiction over retail electric service.] | ||
| (a)(7) | (7) [inserted: Transmission service category.—] | |
| [inserted: The term “transmission service category” means a class of transmission service provided under a tariff on file with the Commission, including—] | ||
| (a)(7)(A) | (A) [inserted: ] | |
| [inserted: network integration transmission service;] | ||
| (a)(7)(B) | (B) [inserted: ] | |
| [inserted: point-to-point transmission service; and] | ||
| (a)(7)(C) | (C) [inserted: ] | |
| [inserted: any interim, non-firm, contract demand, or other service that limits—] | ||
| (a)(7)(C)(i) | (i) [inserted: ] | |
| [inserted: the quantity of energy a load may withdraw from the transmission system; or] | ||
| (a)(7)(C)(ii) | (ii) [inserted: ] | |
| [inserted: the conditions under which the load may withdraw energy from the transmission system.] | ||
| (b) | (b) [inserted: Ratepayer protection floor.—] | |
| (b)(1) | (1) [inserted: No subsidy of covered load.—] | |
| [inserted: No portion of the incremental cost may be allocated to, or recovered in the rates of, any customer other than a covered load, subject to the limitations described in subsection (e).] | ||
| (b)(2) | (2) [inserted: Surplus permitted.—] | |
| [inserted: Paragraph (1) does not limit the authority of the Commission or a State under subsection (c) to recover from covered loads amounts in excess of incremental cost and to credit those amounts to other customers as a rebate or a reduction to the utility costs that are used as a basis for the calculation of customer rates.] | ||
| (b)(3) | (3) [inserted: Continuing recovery on exit.—] | |
| [inserted: A rate, charge, or agreement for service to a covered load shall be designed to recover from the covered load the full incremental cost of the electric utility, and such recovery shall continue notwithstanding the termination by the covered load of a contract or other agreement pertaining to the sale of electric energy, or the cessation by the covered load of the purchase of electric energy, before that incremental cost has been fully recovered.] | ||
| (b)(4) | (4) [inserted: Financial assurance.—] | |
| [inserted: Before constructing, or making an upgrade to, a generation, transmission, or distribution facility necessary to serve a covered load, an electric utility shall require the covered load to provide financial assurances or contributions sufficient to cover the cost of the facility or upgrade, subject to the condition that any financial assurances or contributions provided by the applicable covered load to a public utility or Transmission Organization for the same facility or upgrade shall be credited against the requirement of this paragraph.] | ||
| (c) | (c) [inserted: State authority To hold open seasons and set covered-Load rates.—] | |
| (c)(1) | (1) [inserted: In general.—] | |
| [inserted: Notwithstanding any other provision of this Act or any rule or order of the Commission, and consistent with subsection (b)(3), a State may, with respect to retail electric service to covered loads—] | ||
| (c)(1)(A) | (A) [inserted: ] | |
| [inserted: establish rates, charges, or contract terms that recover more than the embedded average cost, and more than the incremental cost, of serving a covered load;] | ||
| (c)(1)(B) | (B) [inserted: ] | |
| [inserted: require that revenue collected from a covered load in excess of incremental cost be credited or applied to reduce the rates of other retail customers;] | ||
| (c)(1)(C) | (C) [inserted: ] | |
| [inserted: in effectuating the policy described in this subsection, use an open season or competitive solicitation to allocate among covered loads the opportunity to obtain and contract for retail electric service, making awards in such manner as returns the greatest benefit to other ratepayers on a present value basis, notwithstanding the order in which applications or requests for service are received from covered loads or any other basis for making such awards, subject to the condition that each award under such an open season or competitive solicitation shall specify the maximum quantity of firm demand awarded, in megawatts, and the transmission service category on the basis of which the covered load is to be served;] | ||
| (c)(1)(D) | (D) [inserted: ] | |
| [inserted: condition the provision of retail electric service to a covered load on the procurement, construction, or contracting by the covered load for new generation resources sufficient to serve the demand of the covered load; and] | ||
| (c)(1)(E) | (E) [inserted: ] | |
| [inserted: condition the provision of retail electric service to a covered load on the covered load taking, or agreeing to take, a transmission service category that limits—] | ||
| (c)(1)(E)(i) | (i) [inserted: ] | |
| [inserted: the quantity of energy the covered load may withdraw from the transmission system; or] | ||
| (c)(1)(E)(ii) | (ii) [inserted: ] | |
| [inserted: the conditions under which the covered load may withdraw energy from the transmission system.] | ||
| (c)(2) | (2) [inserted: Priority of State competitive solicitations.—] | |
| (c)(2)(A) | (A) [inserted: Broad discretion.—] | |
| [inserted: For purposes of an open solicitation, a State shall, with respect to retail electric service to a covered load, be afforded broad discretion to conduct, to authorize an electric utility to conduct, or to require an electric utility to conduct, a competitive solicitation or open season to allocate the opportunity to interconnect, or to obtain service for, a covered load.] | ||
| (c)(2)(B) | (B) [inserted: Electric utility filing.—] | |
| [inserted: An electric utility may file to conduct a solicitation or open season described in subparagraph (A).] | ||
| (c)(2)(C) | (C) [inserted: Authority to require.—] | |
| [inserted: A State may require an electric utility to conduct an open season described in subparagraph (A).] | ||
| (d) | (d) [inserted: Protection of American industry.—] | |
| [inserted: A State may treat covered loads as a separate class of service, and may establish rates, charges, terms, conditions, and interconnection or service priorities for covered loads that differ from, and that are less favorable than, those applicable to other large industrial, manufacturing, or commercial loads.] | ||
| (e) | (e) [inserted: Rules of construction.—] | |
| (e)(1) | (1) [inserted: State and Federal authority.—] | |
| [inserted: Except as expressly provided in subsection (c), nothing in this section expands or diminishes the jurisdiction of the Commission or of any State, including State authority over retail electric service, rate design, and resource planning.] | ||
| (e)(2) | (2) [inserted: Recognition of reserved State authority.—] | |
| (e)(2)(A) | (A) [inserted: In general.—] | |
| [inserted: The authority described in subsection (c)(1) is an attribute of the reserved authority of the States over retail electric service.] | ||
| (e)(2)(B) | (B) [inserted: Clarification.—] | |
| [inserted: This section—] | ||
| (e)(2)(B)(i) | (i) [inserted: ] | |
| [inserted: recognizes and confirms the authority described in subparagraph (A); and] | ||
| (e)(2)(B)(ii) | (ii) [inserted: ] | |
| [inserted: is not the source of that authority.] | ||
| (f) | (f) [inserted: Applicability.—] | |
| (f)(1) | (1) [inserted: Prospective application.—] | |
| [inserted: Subsections (b) and (c) apply to a covered load that interconnects on or after the date of enactment of this section.] | ||
| (f)(2) | (2) [inserted: Existing arrangements.—] | |
| [inserted: An arrangement to serve a covered load that was approved by the Commission or by a State before the date of enactment of this section shall remain in effect.] |