Title 16 · ConservationParks and public lands
Changes to 16 U.S.C. § 796
S. 5653 · Bipartisan American Affordability and Jobs Act of 2026 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
16 U.S.C. § 796 Definitions
1 change the bill asks for here, 1 carried out
- Carried out:
Section 3 of the Federal Power Act (16 U.S.C. 796) is amended by adding at the end the following:
(30) Qualifying behind-the-meter distributed energy system facility; qualifying BTM DES facility.— The term “qualifying behind-the-meter distributed energy system facility” or “qualifying BTM DES facility” means a facility that— (A) is an energy storage system (including a …
§ 796(28)–(31)
Start of § 796 to (28)(A) unchanged ·
(B) to ensure nondiscriminatory access to the facilities.3
(29) Transmission organization.— The term “Transmission Organization” means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities.
(30) [inserted: Qualifying behind-the-meter distributed energy system facility; qualifying BTM DES facility.—] [inserted: The term “qualifying behind-the-meter distributed energy system facility” or “qualifying BTM DES facility” means a facility that—]
(A) [inserted: is an energy storage system (including a battery energy storage system), a fuel cell system, a generator, or other resource—]
(i) [inserted: that can be brought online within 15 minutes of being called on for deployment; and]
(ii) [inserted: the output of which can be dispatched and adjusted at the signal of the system operator;]
(B) [inserted: is located behind the meter of a retail customer of a distribution utility (as defined in section 217(a));]
(C) [inserted: has a rated capacity of not less than 5 kilowatts; and]
(D) [inserted: maintains metering and telemetry capabilities that—]
(i) [inserted: are sufficient to dispatch the facility, account for withdrawals from and injections to the grid, and communicate all relevant operational data from the facility; and]
(ii) [inserted: are not required to include equipment owned or installed by the distribution utility (as so defined), and may include the use of device-level equipment, including inverters.]
(31) [inserted: Qualifying behind-the-meter distributed energy system aggregation; qualifying BTM DES aggregation.—] [inserted: The term “qualifying behind-the-meter distributed energy system aggregation” or “qualifying BTM DES aggregation” means an aggregation of 2 or more qualifying BTM DES facilities—]
(A) [inserted: with a combined capacity of not less than 100 kilowatts; and]
(B) [inserted: that maintains aggregation-level metering and telemetry capabilities sufficient to facilitate the dispatch and market settlement of the aggregation.]