Skip to content
The People's CodeSearch
Menu

Title 16 · ConservationParks and public lands

Changes to 16 U.S.C. § 796

S. 5653 · Bipartisan American Affordability and Jobs Act of 2026 ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

16 U.S.C. § 796 Definitions

+24 −0Shown
More for 16 U.S.C. § 796
Read § 796
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 3 of the Federal Power Act (16 U.S.C. 796) is amended by adding at the end the following:(30) Qualifying behind-the-meter distributed energy system facility; qualifying BTM DES facility.— The term “qualifying behind-the-meter distributed energy system facility” or “qualifying BTM DES facility” means a facility that— (A) is an energy storage system (including a …

§ 796(28)–(31)

Start of § 796 to (28)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(28)(B)(B) (B)
to ensure nondiscriminatory access to the facilities.3to ensure nondiscriminatory access to the facilities.3
(29)(29) Transmission organization.—(29) Transmission organization.—
The term “Transmission Organization” means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities.The term “Transmission Organization” means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities.
(30)(30) [inserted: Qualifying behind-the-meter distributed energy system facility; qualifying BTM DES facility.—]
[inserted: The term “qualifying behind-the-meter distributed energy system facility” or “qualifying BTM DES facility” means a facility that—]
(30)(A)(A) [inserted: ]
[inserted: is an energy storage system (including a battery energy storage system), a fuel cell system, a generator, or other resource—]
(30)(A)(i)(i) [inserted: ]
[inserted: that can be brought online within 15 minutes of being called on for deployment; and]
(30)(A)(ii)(ii) [inserted: ]
[inserted: the output of which can be dispatched and adjusted at the signal of the system operator;]
(30)(B)(B) [inserted: ]
[inserted: is located behind the meter of a retail customer of a distribution utility (as defined in section 217(a));]
(30)(C)(C) [inserted: ]
[inserted: has a rated capacity of not less than 5 kilowatts; and]
(30)(D)(D) [inserted: ]
[inserted: maintains metering and telemetry capabilities that—]
(30)(D)(i)(i) [inserted: ]
[inserted: are sufficient to dispatch the facility, account for withdrawals from and injections to the grid, and communicate all relevant operational data from the facility; and]
(30)(D)(ii)(ii) [inserted: ]
[inserted: are not required to include equipment owned or installed by the distribution utility (as so defined), and may include the use of device-level equipment, including inverters.]
(31)(31) [inserted: Qualifying behind-the-meter distributed energy system aggregation; qualifying BTM DES aggregation.—]
[inserted: The term “qualifying behind-the-meter distributed energy system aggregation” or “qualifying BTM DES aggregation” means an aggregation of 2 or more qualifying BTM DES facilities—]
(31)(A)(A) [inserted: ]
[inserted: with a combined capacity of not less than 100 kilowatts; and]
(31)(B)(B) [inserted: ]
[inserted: that maintains aggregation-level metering and telemetry capabilities sufficient to facilitate the dispatch and market settlement of the aggregation.]

Step through the changes