Title 30 · Mineral Lands and MiningEnergy
Changes to 30 U.S.C. § 1001
S. 5653 · Bipartisan American Affordability and Jobs Act of 2026 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
30 U.S.C. § 1001 Definitions
11 changes the bill asks for here, 9 carried out
- Carried out:
in the matter preceding subsection (a), by striking
As used in this Act, the term—
and insertingIn this Act:
; - Carried out:
in each of subsections (a) through (d), by striking the semicolon at the end and inserting a period
;
- Carried out:
in subsection (e), by striking
geothermal steam or associated
; - Carried out:
in the matter preceding paragraph (1), by striking
Significant
and insertingsignificant
; and - Carried out:
by redesignating paragraphs (1) through (4) as subparagraphs (A) through (D), respectively, and indenting appropriately;
- Carried out:
in subsection (g), by striking
; and
and inserting a period; - Carried out:
by redesignating subsections (a) through (g) as paragraphs (8), (4), (5), (1), (7), (9), and (2), respectively, and indenting and moving the paragraphs so as to appear in numerical order;
- Not carried out:
by inserting
The term
after the paragraph designation; andWe can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: inserting QTEXT after the paragraph designation; and - Not carried out:
by inserting a paragraph heading, the text of which comprises the term defined in that paragraph;
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: inserting a paragraph heading, the text of which comprises the term defined in that paragraph; - Carried out:
by inserting after paragraph (2) (as so redesignated) the following:
(3) Geothermal electric generating facility.— (A) In general.— The term “geothermal electric generating facility” means a facility, including all necessary equipment or structures (including turbines, cooling equipment, and other equipment), that converts geothermal resources …
- Carried out:
by inserting after paragraph (5) (as so redesignated) the following:
(6) In-service date.— The term “in-service date”, with respect to a geothermal electric generating facility, means the date on which the geothermal electric generating facility begins operating..
§ 1001(8)–(3)
§ 1001. Definitions
[struck: As][inserted: In] [struck: used in ]this [struck: chapter, the term—][inserted: Act:]
[struck: (a)] [inserted: (8)] “Secretary” means the Secretary of the Interior[struck: ;][inserted: .]
[struck: (b)] [inserted: (4)] “geothermal lease” means a lease issued under authority of this chapter[struck: ;][inserted: .]
[struck: (c)] [inserted: (5)] “geothermal resources” means (i) all products of geothermal processes, embracing indigenous steam, hot water and hot brines; (ii) steam and other gases, hot water and hot brines resulting from water, gas, or other fluids artificially introduced into geothermal formations; (iii) heat or other associated energy found in geothermal formations; and (iv) any byproduct derived from them[struck: ;][inserted: .]
(6) [inserted: In-service date.—] [inserted: The term “in-service date”, with respect to a geothermal electric generating facility, means the date on which the geothermal electric generating facility begins operating.]
[struck: (d)] [inserted: (1)] “byproduct” means any mineral or minerals (exclusive of oil, hydrocarbon gas, and helium) which are found in solution or in association with geothermal steam and which have a value of less than 75 per centum of the value of the geothermal steam or are not, because of quantity, quality, or technical difficulties in extraction and production, of sufficient value to warrant extraction and production by themselves[struck: ;][inserted: .]
[struck: (e)] [inserted: (7)] “known geothermal resources area” means an area in which the geology, nearby discoveries, competitive interests, or other indicia would, in the opinion of the Secretary, engender a belief in men who are experienced in the subject matter that the prospects for extraction of geothermal [struck: steam or associated geothermal ]resources are good enough to warrant expenditures of money for that purpose.
[struck: (f)] [inserted: (9)] “[struck: Significant][inserted: significant] thermal features within units of the National Park System” shall include, but not be limited to, the following:
[struck: (1)] [inserted: (A)] Thermal features within units of the National Park System listed in Section 1 1026(a)(1) of this title and designated as significant in the Federal Register notice of August 3, 1987 (Vol. 52, No. 148 Fed. Reg. 28790).
[struck: (2)] [inserted: (B)] Crater Lake National Park.
[struck: (3)] [inserted: (C)] Thermal features within Big Bend National Park and Lake Mead National Recreation Area proposed as significant in the Federal Register notice of February 13, 1987 (Vol. 52, No. 30 Fed. Reg. 4700).
[struck: (4)] [inserted: (D)] Thermal features within units of the National Park System added to the significant thermal features list pursuant to section 1026(a)(2) of this title.
[struck: (g)] [inserted: (2)] “direct use” means utilization of geothermal resources for commercial, residential, agricultural, public facilities, or other energy needs other than the commercial production of electricity[struck: ; and][inserted: .]
(3) [inserted: Geothermal electric generating facility.—]
(A) [inserted: In general.—] [inserted: The term “geothermal electric generating facility” means a facility, including all necessary equipment or structures (including turbines, cooling equipment, and other equipment), that converts geothermal resources into electricity.]
(B) [inserted: Separate facilities.—] [inserted: A plant or site of a facility described in subparagraph (A) shall be considered a new or separate facility from the facility described in subparagraph (A) only if no turbines are shared with that existing facility.]