33 U.S.C. § 1344 Permits for dredged or fill material

+82 −04 of 10 shown
More for 33 U.S.C. § 1344
Read § 1344
10 changes the bill asks for here, 4 carried out
  1. Not carried out:

    by striking (c) The Administrator and inserting the following:(c) Specification or use of defined area.— (1) In general.— The Administrator;

    The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.

    Technical detailthe provision inserted says more than a heading and the words struck
  2. Not carried out:

    in paragraph (1) (as so designated), by inserting during the period described in paragraph (2) and before after notice and opportunity for public hearings; and

    The bill points to paragraph (1) of § 1344(c), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no paragraph (1) in /us/usc/t33/s1344/c
  3. Carried out:

    by adding at the end the following:(2) Period of prohibition.— The period during which the Administrator may prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, or deny or restrict the use of any defined area for specification (including the withdrawal of …

  4. Not carried out:

    by striking (e)(1) In carrying and inserting the following:(e) General permits on State, regional, or nationwide basis.— (1) Permits authorized.— In carrying;

    The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.

    Technical detailthe provision inserted says more than a heading and the words struck
  5. Not carried out:

    by striking (2) No general and inserting the following:(2) Term.— (A) In general.— No general;

    The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.

    Technical detailthe provision inserted says more than a heading and the words struck
  6. Not carried out:

    in subparagraph (A) (as so designated), by striking five years and inserting 10 years; and

    The bill points to subparagraph (A) of § 1344(e)(2), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.

    Technical detailtarget not found: no subparagraph (A) in /us/usc/t33/s1344/e/2
  7. Carried out:

    by adding at the end the following:(B) Timing of modification.— The Secretary may modify a general permit pursuant to subparagraph (A) during the term of the general permit or during the renewal of the general permit.; and

  8. Carried out:

    by adding at the end the following:(3) Considerations.— In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary— (A) shall consider only the effects on compliance with water quality requirements (as defined in section 401(h)) of any discharge of dredged or fill material …

  9. Not carried out:

    in subsection (t), by striking (t) Nothing in this section and inserting the following:(u) Savings provision.— Nothing in this section; and

    The bill puts these words in a provision numbered (u), which can't be the first one in § 1344(t), so we couldn't tell where it goes.

    Technical detail(u) can't be the first provision of /us/usc/t33/s1344/t
  10. Carried out:

    by inserting after subsection (s) the following:(t) Judicial review.— (1) Statute of limitations.— Notwithstanding any applicable provision of law relating to statutes of limitations— (A) an action seeking judicial review, under subchapter II of chapter 5, and chapter 7, of title 5, United States Code (commonly known as the …

    The section already has a provision under this letter or number, so it would have two.

This bill puts a provision under a letter or number this section already uses, so the section would have two. The law has probably changed since the bill was written.

§ 1344(a)–(f)

§ 1344. Permits for dredged or fill material

(a) Discharge into navigable waters at specified disposal sites The Secretary may issue permits, after notice and opportunity for public hearings for the discharge of dredged or fill material into the navigable waters at specified disposal sites. Not later than the fifteenth day after the date an applicant submits all the information required to complete an application for a permit under this subsection, the Secretary shall publish the notice required by this subsection.

(b) Specification for disposal sites Subject to subsection (c) of this section, each such disposal site shall be specified for each such permit by the Secretary (1) through the application of guidelines developed by the Administrator, in conjunction with the Secretary, which guidelines shall be based upon criteria comparable to the criteria applicable to the territorial seas, the contiguous zone, and the ocean under section 1343(c) of this title, and (2) in any case where such guidelines under clause (1) alone would prohibit the specification of a site, through the application additionally of the economic impact of the site on navigation and anchorage.

(c) Denial or restriction of use of defined areas as disposal sites The Administrator is authorized to prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, and he is authorized to deny or restrict the use of any defined area for specification (including the withdrawal of specification) as a disposal site, whenever he determines, after notice and opportunity for public hearings, that the discharge of such materials into such area will have an unacceptable adverse effect on municipal water supplies, shellfish beds and fishery areas (including spawning and breeding areas), wildlife, or recreational areas. Before making such determination, the Administrator shall consult with the Secretary. The Administrator shall set forth in writing and make public his findings and his reasons for making any determination under this subsection.

(2) [inserted: Period of prohibition.—] [inserted: The period during which the Administrator may prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, or deny or restrict the use of any defined area for specification (including the withdrawal of specification) as a disposal site, under paragraph (1)—]

(A) [inserted: begins on the date on which an applicant submits a complete application under this section; and]

(B) [inserted: ends on the date on which the Secretary issues the permit.]

(d) “Secretary” defined The term “Secretary” as used in this section means the Secretary of the Army, acting through the Chief of Engineers.

(e) General permits on State, regional, or nationwide basis

(1) In carrying out his functions relating to the discharge of dredged or fill material under this section, the Secretary may, after notice and opportunity for public hearing, issue general permits on a State, regional, or nationwide basis for any category of activities involving discharges of dredged or fill material if the Secretary determines that the activities in such category are similar in nature, will cause only minimal adverse environmental effects when performed separately, and will have only minimal cumulative adverse effect on the environment. Any general permit issued under this subsection shall (A) be based on the guidelines described in subsection (b)(1) of this section, and (B) set forth the requirements and standards which shall apply to any activity authorized by such general permit.

(2) No general permit issued under this subsection shall be for a period of more than five years after the date of its issuance and such general permit may be revoked or modified by the Secretary if, after opportunity for public hearing, the Secretary determines that the activities authorized by such general permit have an adverse impact on the environment or such activities are more appropriately authorized by individual permits.

(B) [inserted: Timing of modification.—] [inserted: The Secretary may modify a general permit pursuant to subparagraph (A) during the term of the general permit or during the renewal of the general permit.]

(3) [inserted: Considerations.—] [inserted: In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary—]

(A) [inserted: shall consider only the effects on compliance with water quality requirements (as defined in section 401(h)) of any discharge of dredged or fill material resulting from the activity; and]

(B) [inserted: shall consider any effects of a discharge of dredged or fill material into less than 2 acres of navigable waters to be a minimal adverse environmental effect.]

(4) [inserted: Nationwide permits for activities.—]

(A) [inserted: General permits authorized.—] [inserted: Notwithstanding any other provision of this section, the Secretary shall maintain general permits on a nationwide basis for activities described in subparagraph (B).]

(B) [inserted: Activities described.—] [inserted: An activity referred to in subparagraph (A) is an activity—]

(i) [inserted: authorized under Nationwide Permit 12, Nationwide Permit 14, Nationwide Permit 43, Nationwide Permit 57, or Nationwide Permit 58, as those nationwide permits are described in and reissued pursuant to the final rule of the Corps of Engineers entitled “Reissuance and Modification of Nationwide Permits” (91 Fed. Reg. 768 (January 8, 2026)); and]

(ii) [inserted: that results in a discharge of dredged or fill material into less than 2 acres of navigable waters for each single and complete project (as defined in section 330.2 of title 33, Code of Federal Regulations (as in effect on the date of enactment of this paragraph)), including a single and complete linear project and a single and complete non-linear project (as those terms are defined in the final rule of the Corps of Engineers entitled “Reissuance and Modification of Nationwide Permits” (91 Fed. Reg. 768 (January 8, 2026))).]

(C) [inserted: Retention of general and individual permitting authority.—] [inserted: Nothing in this paragraph prohibits the Secretary from issuing—]

(i) [inserted: general permits on a regional or State basis; or]

(ii) [inserted: individual permits for linear infrastructure projects.]

(5) [inserted: Reissuance of nationwide permits.—]

(A) [inserted: In general.—] [inserted: Subject to subparagraph (B), in determining whether to reissue a general permit issued on a nationwide basis under this subsection—]

(i) [inserted: no consultation with an applicable State pursuant to section 6(a) of the Endangered Species Act of 1973 (16 U.S.C. 1535(a)) is required;]

(ii) [inserted: no consultation with a Federal agency pursuant to section 7(a)(2) of that Act (16 U.S.C. 1536(a)(2)) is required;]

(iii) [inserted: the requirements of section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) shall be satisfied by preparing a programmatic environmental assessment with respect to the general permit; and]

(iv) [inserted: no consultation under section 306108 of title 54, United States Code, is required.]

(B) [inserted: Requirement.—] [inserted: Clauses (i) through (iv) of subparagraph (A) shall only apply to a general permit being reissued pursuant to that subparagraph if the general permit does not—]

(i) [inserted: narrow or eliminate preconstruction requirements; or]

(ii) [inserted: raise the threshold for such preconstruction requirements.]

(f) Non-prohibited discharge of dredged or fill ma­terial

(1) Except as provided in paragraph (2) of this subsection, the discharge of dredged or fill material—

§ 1344(s)–(t)

(f)(1)(A)–(s)(2) unchanged ·

(3) The Secretary is authorized to commence a civil action for appropriate relief, including a permanent or temporary injunction for any violation for which he is authorized to issue a compliance order under paragraph (1) of this subsection. Any action under this paragraph may be brought in the district court of the United States for the district in which the defendant is located or resides or is doing business, and such court shall have jurisdiction to restrain such violation and to require compliance. Notice of the commencement of such acton1 shall be given immediately to the appropriate State.

(4) Any person who violates any condition or limitation in a permit issued by the Secretary under this section, and any person who violates any order issued by the Secretary under paragraph (1) of this subsection, shall be subject to a civil penalty not to exceed $25,000 per day for each violation. In determining the amount of a civil penalty the court shall consider the seriousness of the violation or violations, the economic benefit (if any) resulting from the violation, any history of such violations, any good-faith efforts to comply with the applicable requirements, the economic impact of the penalty on the violator, and such other matters as justice may require.

(t) [inserted: Judicial review.—]

(1) [inserted: Statute of limitations.—] [inserted: Notwithstanding any applicable provision of law relating to statutes of limitations—]

(A) [inserted: an action seeking judicial review, under subchapter II of chapter 5, and chapter 7, of title 5, United States Code (commonly known as the “Administrative Procedure Act”), or any other applicable provision of law, of the approval by the Administrator of a State permit program pursuant to this section shall be filed not later than the date that is 150 days after the date on which the approval was issued, unless a shorter time period is otherwise provided for by law;]

(B) [inserted: an action seeking judicial review, under subchapter II of chapter 5, and chapter 7, of title 5, United States Code (commonly known as the “Administrative Procedure Act”), or any other applicable provision of law, of an individual permit or general permit issued under this section shall be filed not later than the date that is 150 days after the date on which the permit was issued, unless a shorter time period is otherwise provided for by law; and]

(C) [inserted: an action seeking judicial review, under subchapter II of chapter 5, and chapter 7, of title 5, United States Code (commonly known as the “Administrative Procedure Act”), or any other applicable provision of law, of a verification that an activity involving a discharge of dredged or fill material is authorized by a general permit issued under this section shall be filed not later than the date that is 150 days after the date on which the verification was issued, unless a shorter time period is otherwise provided for by law.]

(2) [inserted: Limitation on commencement of certain actions.—]

(A) [inserted: In general.—] [inserted: Notwithstanding any other provision of law but subject to subparagraph (B), no action described in subparagraph (A) or (B) of paragraph (1) may be commenced unless the action—]

(i) [inserted: is filed by a party that submitted a comment—]

(I) [inserted: during the public comment period for the administrative proceedings related to the action; and]

(II) [inserted: that is sufficiently detailed to put the Administrator, the Secretary, or the State, as applicable, on notice of the issue on which the party seeks judicial review; and]

(ii) [inserted: is related to that comment.]

(B) [inserted: Limitation.—] [inserted: The limitation under subparagraph (A) shall only apply to actions for which—]

(i) [inserted: a draft of the action was published in the Federal Register; and]

(ii) [inserted: the applicable agency provided a public comment period of not less than 30 days.]

(3) [inserted: Remedies for actions relating to permits.—] [inserted: If a court determines that the Secretary or a State, as applicable, did not comply with the requirements of this section in issuing an individual or general permit under this section, or in verifying that an activity involving a discharge of dredged or fill material is authorized by a general permit issued under this section, or otherwise was arbitrary and capricious under subchapter II of chapter 5, and chapter 7, of title 5, United States Code (commonly known as the “Administrative Procedure Act”), as applicable—]

(A) [inserted: the court shall remand the matter to the Secretary or the State, as applicable, for further proceedings consistent with the determination of the court;]

(B) [inserted: with respect to a determination regarding the issuance of an individual or general permit under this section, the court may not vacate, revoke, enjoin, or otherwise limit the permit unless the court finds that activities authorized under the permit would present an imminent and substantial danger to human health or the environment for which there is no other equitable remedy available under the law; and]

(C) [inserted: with respect to a determination regarding a verification that an activity involving a discharge of dredged or fill material is authorized by a general permit issued under this section, the court may not enjoin or otherwise limit the discharge unless the court finds that the activity would present an imminent and substantial danger to human health or the environment for which there is no other equitable remedy available under the law.]

(4) [inserted: Timeline to act on court order.—] [inserted: If a court remands a matter under paragraph (3), the court shall set and enforce a reasonable schedule and deadline, which may not exceed 180 days from the date on which the court remands the matter, except as otherwise required by law, for the Administrator, the Secretary, or the State, as applicable, to take such actions as the court may order.]

(t) Navigable waters within State jurisdiction Nothing in this section shall preclude or deny the right of any State or interstate agency to control the discharge of dredged or fill material in any portion of the navigable waters within the jurisdiction of such State, including any activity of any Federal agency, and each such agency shall comply with such State or interstate requirements both substantive and procedural to control the discharge of dredged or fill material to the same extent that any person is subject to such requirements. This section shall not be construed as affecting or impairing the authority of the Secretary to maintain navigation.