Skip to content
The People's CodeSearch
Menu

Title 42 · The Public Health and Welfare

Changes to 42 U.S.C. § 16421

S. 5653 · Bipartisan American Affordability and Jobs Act of 2026 ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

42 U.S.C. § 16421 Third-party finance

+2 −2Shown
More for 42 U.S.C. § 16421
Read § 16421
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    in subsection (a)(1)(A), by striking in a national interest electric transmission corridor designated under section 216(a) and inserting in a geographic area identified under section 224; and

  2. Carried out:

    in subsection (b)(1)(A), by striking in an area designated under section 216(a) and inserting in a geographic area identified under section 224.

§ 16421(a)

§ 16421. Third-party finance

(a) Existing facilities The Secretary, acting through the Administrator of the Western Area Power Administration (hereinafter in this section referred to as “WAPA”), or through the Administrator of the Southwestern Power Administration (hereinafter in this section referred to as “SWPA”), or both, may design, develop, construct, operate, maintain, or own, or participate with other entities in designing, developing, constructing, operating, maintaining, or owning, an electric power transmission facility and related facilities (“Project”) needed to upgrade existing transmission facilities owned by SWPA or WAPA if the Secretary, in consultation with the applicable Administrator, determines that the proposed Project—

(1)

(A) is located in a [struck: national][inserted: geographic] [struck: interest][inserted: area] [struck: electric][inserted: identified] [struck: transmission corridor designated ]under section [struck: 216(a)][inserted: 224] of the Federal Power Act [16 U.S.C. 824p(a)] and will reduce congestion of electric transmission in interstate commerce; or

(B) is necessary to accommodate an actual or projected increase in demand for electric transmission capacity;

(2) is consistent with—

§ 16421(b)New facilities(1)–(2)

(a)(2)(A)–(3) unchanged ·

(b) New facilities The Secretary, acting through WAPA or SWPA, or both, may design, develop, construct, operate, maintain, or own, or participate with other entities in designing, developing, constructing, operating, maintaining, or owning, a new electric power transmission facility and related facilities (“Project”) located within any State in which WAPA or SWPA operates if the Secretary, in consultation with the applicable Administrator, determines that the proposed Project—

(1)

(A) is located in [struck: an][inserted: a] [inserted: geographic ]area [struck: designated][inserted: identified] under section [struck: 216(a)][inserted: 224] of the Federal Power Act [16 U.S.C. 824p(a)] and will reduce congestion of electric transmission in interstate commerce; or

(B) is necessary to accommodate an actual or projected increase in demand for electric transmission capacity;

(2) is consistent with—

Rest of § 16421 unchanged ·

Step through the changes