Title 16 · ConservationParks and public lands
Became law July 12, 2026 (Pub. L. 119-102): what it changed in 16 U.S.C. § 2201
S. 629 · Emergency Conservation Program Improvement Act of 2025 · Enrolled The final text both chambers passed, sent to the President to sign. If signed, it becomes law.
Became law as Public Law 119-102
Shown against the Code as it stood just before the law (current through Pub. L. 119-100, June 26, 2026): words it removed and words it added are marked.
16 U.S.C. § 2201 Emergency conservation program
5 changes the bill asks for here, 5 carried out
- Carried out:
in the subsection heading, by inserting
and Other Emergency Conservation Measures
afterFencing
; - Carried out:
by inserting
or for other emergency measures to replace or restore farmland or conservation structures requiring an immediate response (as determined by the Secretary),
afterreplacement of fencing,
; and - Carried out:
by striking
option of receiving
and all that follows through the period at the end and inserting the following: option of receiving, before the agricultural producer carries out the repair, replacement, or restoration—“(A) with respect to a payment to the agricultural producer for a replacement, 75 percent of the cost of the replacement, as determined by the Secretary; and “(B) with respect to a payment to the agricultural producer for a repair or restoration, 50 percent of the cost of the repair or restoration, as determined by the Secretary.; and - Carried out:
in paragraph (2), by striking
60-day
and inserting180-day
; and - Carried out:
by adding at the end the following:
(c) Wildfire Determination.—A wildfire that causes damage eligible for a payment under subsection (a) includes—(1) a wildfire that is not caused naturally, if the damage is caused by the spread of the wildfire due to natural causes; and (2) a wildfire that is caused by the Federal Government..
§ 2201(a)–(c)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 2201. Emergency conservation program | § 2201. Emergency conservation program | |||
| (a) | (a) In general | (a) In general | ||
| The Secretary of Agriculture (referred to in this chapter as the “Secretary”) is authorized to make payments to agricultural producers who carry out emergency measures to control wind erosion on farmlands or to rehabilitate farmlands damaged by wind erosion, floods, hurricanes, wildfires, or other natural disasters when, as a result of the foregoing, new conservation problems have been created that (1) if not treated, will impair or endanger the land, (2) materially affect the productive capacity of the land, (3) represent damage that is unusual in character and, except for wind erosion, is not the type that would recur frequently in the same area, and (4) will be so costly to rehabilitate that Federal assistance is or will be required to return the land to productive agricultural use. | The Secretary of Agriculture (referred to in this chapter as the “Secretary”) is authorized to make payments to agricultural producers who carry out emergency measures to control wind erosion on farmlands or to rehabilitate farmlands damaged by wind erosion, floods, hurricanes, wildfires, or other natural disasters when, as a result of the foregoing, new conservation problems have been created that (1) if not treated, will impair or endanger the land, (2) materially affect the productive capacity of the land, (3) represent damage that is unusual in character and, except for wind erosion, is not the type that would recur frequently in the same area, and (4) will be so costly to rehabilitate that Federal assistance is or will be required to return the land to productive agricultural use. | |||
| (b) | (b) Repair or replacement of fencing | (b) Repair or replacement of fencing[inserted: and Other Emergency Conservation Measures] | ||
| (b)(1) | (1) In general | (1) In general | ||
| [inserted: With respect to a payment to an agricultural producer under subsection (a) for the repair or replacement of fencing, or for other emergency measures to replace or restore farmland or conservation structures requiring an immediate response (as determined by the Secretary), the Secretary shall give the agricultural producer the option of receiving, before the agricultural producer carries out the repair, replacement, or restoration—] | ||||
| (b)(1)(A) | (A) [inserted: ] | |||
| [inserted: with respect to a payment to the agricultural producer for a replacement, 75 percent of the cost of the replacement, as determined by the Secretary; and] | ||||
| (b)(1)(B) | (B) [inserted: ] | |||
| [inserted: with respect to a payment to the agricultural producer for a repair or restoration, 50 percent of the cost of the repair or restoration, as determined by the Secretary.] | ||||
| (b)(1) | ||||
| (b)(2) | (2) Return of funds | (2) Return of funds | ||
| If the funds provided under paragraph (1) are not expended by the end of the | If the funds provided under paragraph (1) are not expended by the end of the [inserted: 180]-day period beginning on the date on which the agricultural producer receives those funds, the funds shall be returned within a reasonable timeframe, as determined by the Secretary. | |||
| (c) | (c) [inserted: Wildfire Determination.—] | |||
| [inserted: A wildfire that causes damage eligible for a payment under subsection (a) includes—] | ||||
| (c)(1) | (1) [inserted: ] | |||
| [inserted: a wildfire that is not caused naturally, if the damage is caused by the spread of the wildfire due to natural causes; and] | ||||
| (c)(2) | (2) [inserted: ] | |||
| [inserted: a wildfire that is caused by the Federal Government.] | ||||