Federal Power Act § 224 Proposed

Use of best-available transmission conductors

This section isn't in the Code. 16 bills would add one here. Each would write it its own way: read it in the bill's changes.

It is a new section of the Federal Power Act, by the Act's own number. The Code gives it a number of its own once it is law.

Would add this section

  • S. 5733 · In committee

    High-Capacity Grid Act

  • H.R. 10988 · In committee

    Lower Electricity Bills Act

    Its heading: Use of advanced transmission technologies

  • H.R. 10987 · In committee

    Local Transmission Accountability Act

    Its heading: Oversight of local transmission planning and development

  • H.R. 10809 · In committee

    Make Data Centers Pay Act

    Its heading: Ratepayer protection for data center and high-density computing load

  • S. 5653 · In committee

    Bipartisan American Affordability and Jobs Act of 2026

    Its heading: Transmission study

  • H.R. 10579 · In committee

    Energy Cost Fairness and Reliability Act of 2026

    Its heading: Management of large load facilities

  • H.R. 10539 · In committee

    Integrated Local, Regional, and Interregional Transmission Planning Act of 2026

    Its heading: Planning for transmission facilities that enhance grid reliability, affordability, and resilience

  • H.R. 6633 · Passed the House

    High-Capacity Grid Act

  • S. 5199 · In committee

    GRID Savings Act of 2026

    Its heading: Large load interconnection

  • S. 5074 · In committee

    Enhancing Electric Grid Resilience Act

    Its heading: Allocation of costs of certain transmission facilities

  • H.R. 9843 · In committee

    Enhancing Electric Grid Resilience Act

    Its heading: Allocation of costs of certain transmission facilities

  • S. 5008 · In committee

    Grid Connection and Congestion Management Act

    Its heading: Basic access service for energy-only delivery

  • S. 4559 · In committee

    Energy Cost Fairness and Reliability Act of 2026

    Its heading: Management of large load facilities

  • H.R. 8033 · In committee

    No Harm Data Centers Act

    Its heading: Ensuring data centers pay their fair share

  • H.R. 7977 · In committee

    Energy Bills Relief Act

    Its heading: Improving interregional electric transmission planning

  • H.R. 603 · In committee

    Reinforcing the Grid Against Extreme Weather Act of 2025

    Its heading: Improving interregional electricity transfer capability