§ 4236. Negotiation of price for technical data before development, production, or sustainment of major weapon systems

The Secretary of Defense shall ensure, to the maximum extent practicable, that the Department of Defense, before selecting a contractor for the engineering and manufacturing development of a major weapon system, production of a major weapon system, or sustainment of a major weapon system, negotiates a price for technical data to be delivered under a contract for such development, production, or sustainment.

Where this text comes from

The public laws () that wrote and changed it, and where each is printed in the Statutes at Large ().

(Added Pub. L. 115–91, div. A, title VIII, § 835(a)(1), Dec. 12, 2017, 131 Stat. 1471, § 2439; amended Pub. L. 115–232, div. A, title VIII, § 867, Aug. 13, 2018, 132 Stat. 1901; renumbered § 4236, Pub. L. 116–283, div. A, title XVIII, § 1847(c)(3), Jan. 1, 2021, 134 Stat. 4254.)

Notes (3)

Editorial Notes

Amendments

2021—Pub. L. 116–283 renumbered section 2439 of this title as this section.

2018—Pub. L. 115–232, § 867(4), substituted “, production, or sustainment” for “or production” in section catchline.

Pub. L. 115–232, § 867(1)–(3), inserted “, to the maximum extent practicable,” after “shall ensure” and substituted “production of a major weapon system, or sustainment of a major weapon system” for “or for the production of a major weapon system” and “, production, or sustainment” for “or production”.

Statutory Notes and Related Subsidiaries

Effective Date of 2021 Amendment

Amendment by Pub. L. 116–283 effective Jan. 1, 2022, with additional provisions for delayed implementation and applicability of existing law, see section 1801(d) of Pub. L. 116–283, set out as a note preceding section 3001 of this title.

Effective Date

Pub. L. 115–91, div. A, title VIII, § 835(a)(3), Dec. 12, 2017, 131 Stat. 1471, provided that: “Section 2439 of title 10, United States Code [now 10 U.S.C. 4236], as added by paragraph (1), shall apply with respect to any contract for engineering and manufacturing development of a major weapon system, or for the production of a major weapon system, for which the contract solicitation is issued on or after the date occurring one year after the date of the enactment of this Act [Dec. 12, 2017].”

Would change this section

No bill we know of would change this section.

Versions

Each is an official edition of the Code (a ), up to date through the named.

  • Through Public Law 119-138, Current