Skip to content
The People's CodeSearch
Menu

42 U.S.C. § 15971 · 42, 15971 of the Energy Policy Act of 2005 § 411

§ 15971. Integrated coal/renewable energy system

(a) In general Subject to the availability of appropriations, the Secretary may provide loan guarantees for a project to produce energy from coal of less than 7,000 Btu/lb. using appropriate advanced integrated gasification combined cycle technology, including repowering of existing facilities, that—

(1) is combined with wind and other renewable sources;

(2) minimizes and offers the potential to sequester carbon dioxide emissions; and

(3) provides a ready source of hydrogen for near-site fuel cell demonstrations.

(b) Requirements The facility—

(1) may be built in stages;

(2) shall have a combined output of at least 200 megawatts at successively more competitive rates; and

(3) shall be located in the Upper Great Plains.

(c) Technical criteria Technical criteria described in section 15962(b) of this title shall apply to the facility.

(d) Investment tax credits

(1) In general The loan guarantees provided under this section do not preclude the facility from receiving an allocation for investment tax credits under section 48A of title 26.

(2) Other funding Use of the investment tax credit described in paragraph (1) does not prohibit the use of other clean coal program funding.

Where this text comes from

The public laws () that wrote and changed it, and where each is printed in the Statutes at Large ().

(Pub. L. 109–58, title IV, § 411, Aug. 8, 2005, 119 Stat. 754.)

Would change this section

No bill we know of would change this section.

Versions

Each is an official edition of the Code (a ), up to date through the named.

  • Through Public Law 119-138, Current